Approval Of New Led Bulbs (3 Brothers) To Replace The 400 W Sodium Bulbs On The 12 M Poles Of Madinaty Street Lighting |
The Save Electrical Energy , Madinaty Requires To Approve New Led Bulbs In The Sepal Fixtures Mounted On 12 M Poles Of Madinaty Street Lighting |
2017 |
2017 |
0 |
Bid Evaluation, Check & Assessment of 3b Sample Before and After Modifications, Checking The Certificates Provided by 3b and The Final Shape of Fixture, Factory Auditing |
Arab Company for Projects and Urban Development |
Egypt |
No Image
|
Consultancy Services for Water Supply to Coastal Areas of Radeem, Harmiya and Shweihat (Consultancy Agreement No. D-106791. |
Consultancy Services for Construction of New Pipelines of Approximately 74 Km with All Associated Valves, Fittings, Flow Meters, Control Valves and Equipment for Smp and Bmu at The Coastal Areas of Radeem, Harmiya and Shweihat. |
2016 |
2020 |
6 |
Investigation, Studies , Design (Pdr), Detailed Design , Technical Submission for Tender Documents, Final Contractor s Tender Documents, Tendering, Evaluation , Awarding, -Construction Supervision, Field Supervision During Warranty Period |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
|
Updating and Standardizing the Requirements for Smart Network and Metering System |
The Scope Include the Following -Smart Electric Meters Single 3 Phases
-Commutation Networks Complete Between Smart Meters and Scada System
-Complete Billing System and Remote Control of All Meters Via Gprs/ Rf / Fo Netw -K -Remote Control of Meter Tarff: Monitoring All Mv/Lv/ Network in Scada System
-Street Lighting (Option) Small Networks Using Le
-Operation and Maintenance for Two Years.
|
2016 |
2018 |
5 |
Data Collection, Tender Document, Prequalification Of Contractors, Analyzing Received Evaluation, Preparing Technical And Financial Reports Including Recommendation, Still Contractor Is Not Selected By MEPC |
Madinaty Electromechanical Power Company (MEPC) |
Egypt |
|
Additional RO Unit Utilizing the Brine of the Existing Plant in Madinaty |
Technical Study Report for Brine of Ro Plant In Madinaty |
2016 |
2018 |
2 |
Study Report |
Arab Company for Projects and Urban Development |
Egypt |
No Image
|
Repair Treatment of Cracked Concrete Structures at Port Said |
Repair of Cracked Concrete Structures Including Intake System at Port Said East Power Plant |
2016 |
2017 |
0.4 |
Study Report, Design of Repair of Cracked Concrete Structure |
Suez Gulf Power |
Egypt |
No Image
|
Ben Ban Electrical Transmission (Solar Project) |
Transmission of The Solar Electric Power from The Solar Plots (39 Plots with Total Power of 1850 Mw) At Benban Area – Aswan – Upper Egypt Electricity Area to Their Located Step Up Substations (4 Nos) 22/22/220 Kv to Be Connected to The National Grid (220 Kv Level) At The Same Area. By Using Underground Cables, 18/30 Xpls Inside Trenches from The Solar Plots to The (4 Nos) Substations. |
2016 |
2016 |
181 |
Technical Study for The Suitable Cross Section of Underground Cables to Be Used for Transmitting Generated Power (About 1850 Mw) Laid in Trenches with Size and Type Suitable for Power to Be Transmitted, Conceptual & Detailed Mv Cables/ Fo Cables Routing Layout from Each Solar Plot Up to The 22/22/220 Kv Step-Up Hv Substation, Coordinating with The Civil Engineering Works. |
EGEMAC - Egyptian German Electricity Manufacturing Company |
Egypt |
|
Ben Ban Ohtl (Solar Project) |
Transmission of The Solar Electric Power from The Solar Plots (39 Plots with Total Power of 1850 Mw) At Benban Area – Aswan – Upper Egypt Electricity Area to Their Located Step Up Substations (4 Nos) 22/22/220 Kv to Be Connected to The National Grid (220 Kv Level) At The Same Area. By Using Ohtl Instead of Cable Connection. |
2016 |
2016 |
23 |
PRELIMINARY EVALUATION OF OVERHEAD LINE POLES REQUIRED FROM PLOTS TO THE SUBSTATIONS,DETAILED DESIGN FOR CIVIL WORKS AND POLES , PLANNING , FORECAST |
EGEMAC - Egyptian German Electricity Manufacturing Company |
Egypt |
|
Prepaid Gprs Controlled Irrigation Meter Dn 100 |
-Review of Prepaid Irrigation Meter.
-Issue Comments About the Submitted Offer.
-Giving Recommendation to Tmg
|
2016 |
2016 |
0.45 |
Check Compliance With Egyptian Standard, Checking Availability To Integrate With Exiting Meters, Review Of Current Specification, Preparing Recommendation Report., Bid Evaluation |
Arab Company for Projects and Urban Development |
Egypt |
No Image
|
Repair - Treatment of Cracked Concrete Structure At Sgp Plant |
Supervision Of The Concrete Repair Works To The Cracked Concrete Structures At Suez Gulf Power Plant At Sukhna-Suez |
2016 |
2016 |
0.4 |
Bid Evaluation, Site Supervision |
Powertek Energy SDN BHD |
Egypt |
No Image
|
Technical Specifications of Led Lighting |
Required to Prepare the Specifications of Led Lighting |
2016 |
2016 |
0 |
Technical Report, Review of Current Specification, Data Collection, Civil Detailed Design |
Arab Company for Projects and Urban Development |
Egypt |
No Image
|
Number of projects: 279
|