Projects
Type:
Project Status:
Project Details:
Type Detail:
Project Name Description
Start Year
Finish year
Cost X106
Services Provided Client Country Image
Approval Of New Led Bulbs (3 Brothers) To Replace The 400 W Sodium Bulbs On The 12 M Poles Of Madinaty Street Lighting The Save Electrical Energy , Madinaty Requires To Approve New Led Bulbs In The Sepal Fixtures Mounted On 12 M Poles Of Madinaty Street Lighting 2017 2017 0 Bid Evaluation, Check & Assessment of 3b Sample Before and After Modifications, Checking The Certificates Provided by 3b and The Final Shape of Fixture, Factory Auditing Arab Company for Projects and Urban Development Egypt No Image
Consultancy Services for Water Supply to Coastal Areas of Radeem, Harmiya and Shweihat (Consultancy Agreement No. D-106791. Consultancy Services for Construction of New Pipelines of Approximately 74 Km with All Associated Valves, Fittings, Flow Meters, Control Valves and Equipment for Smp and Bmu at The Coastal Areas of Radeem, Harmiya and Shweihat. 2016 2020 6 Investigation, Studies , Design (Pdr), Detailed Design , Technical Submission for Tender Documents, Final Contractor s Tender Documents, Tendering, Evaluation , Awarding, -Construction Supervision, Field Supervision During Warranty Period Abu Dhabi Distribution Company United Arab Emirates UAE
Updating and Standardizing the Requirements for Smart Network and Metering System The Scope Include the Following -Smart Electric Meters Single 3 Phases -Commutation Networks Complete Between Smart Meters and Scada System -Complete Billing System and Remote Control of All Meters Via Gprs/ Rf / Fo Netw -K -Remote Control of Meter Tarff: Monitoring All Mv/Lv/ Network in Scada System -Street Lighting (Option) Small Networks Using Le -Operation and Maintenance for Two Years. 2016 2018 5 Data Collection, Tender Document, Prequalification Of Contractors, Analyzing Received Evaluation, Preparing Technical And Financial Reports Including Recommendation, Still Contractor Is Not Selected By MEPC Madinaty Electromechanical Power Company (MEPC) Egypt
Additional RO Unit Utilizing the Brine of the Existing Plant in Madinaty Technical Study Report for Brine of Ro Plant In Madinaty 2016 2018 2 Study Report Arab Company for Projects and Urban Development Egypt No Image
Repair Treatment of Cracked Concrete Structures at Port Said Repair of Cracked Concrete Structures Including Intake System at Port Said East Power Plant 2016 2017 0.4 Study Report, Design of Repair of Cracked Concrete Structure Suez Gulf Power Egypt No Image
Ben Ban Electrical Transmission (Solar Project) Transmission of The Solar Electric Power from The Solar Plots (39 Plots with Total Power of 1850 Mw) At Benban Area – Aswan – Upper Egypt Electricity Area to Their Located Step Up Substations (4 Nos) 22/22/220 Kv to Be Connected to The National Grid (220 Kv Level) At The Same Area. By Using Underground Cables, 18/30 Xpls Inside Trenches from The Solar Plots to The (4 Nos) Substations. 2016 2016 181 Technical Study for The Suitable Cross Section of Underground Cables to Be Used for Transmitting Generated Power (About 1850 Mw) Laid in Trenches with Size and Type Suitable for Power to Be Transmitted, Conceptual & Detailed Mv Cables/ Fo Cables Routing Layout from Each Solar Plot Up to The 22/22/220 Kv Step-Up Hv Substation, Coordinating with The Civil Engineering Works. EGEMAC - Egyptian German Electricity Manufacturing Company Egypt
Ben Ban Ohtl (Solar Project) Transmission of The Solar Electric Power from The Solar Plots (39 Plots with Total Power of 1850 Mw) At Benban Area – Aswan – Upper Egypt Electricity Area to Their Located Step Up Substations (4 Nos) 22/22/220 Kv to Be Connected to The National Grid (220 Kv Level) At The Same Area. By Using Ohtl Instead of Cable Connection. 2016 2016 23 PRELIMINARY EVALUATION OF OVERHEAD LINE POLES REQUIRED FROM PLOTS TO THE SUBSTATIONS,DETAILED DESIGN FOR CIVIL WORKS AND POLES , PLANNING , FORECAST EGEMAC - Egyptian German Electricity Manufacturing Company Egypt
Prepaid Gprs Controlled Irrigation Meter Dn 100 -Review of Prepaid Irrigation Meter. -Issue Comments About the Submitted Offer. -Giving Recommendation to Tmg 2016 2016 0.45 Check Compliance With Egyptian Standard, Checking Availability To Integrate With Exiting Meters, Review Of Current Specification, Preparing Recommendation Report., Bid Evaluation Arab Company for Projects and Urban Development Egypt No Image
Repair - Treatment of Cracked Concrete Structure At Sgp Plant Supervision Of The Concrete Repair Works To The Cracked Concrete Structures At Suez Gulf Power Plant At Sukhna-Suez 2016 2016 0.4 Bid Evaluation, Site Supervision Powertek Energy SDN BHD Egypt No Image
Technical Specifications of Led Lighting Required to Prepare the Specifications of Led Lighting 2016 2016 0 Technical Report, Review of Current Specification, Data Collection, Civil Detailed Design Arab Company for Projects and Urban Development Egypt No Image
Number of projects: 279
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved