PROVISION OF CONSULTANCY SERVICES FOR CIVIL REFURBISHMENT FOR M40 PRIMARY EASTERN REGION (CONSULTANCY AGREEMENT NO. D-109791) |
CONSULTANT SHALL RECOMMEND
SUITABLE TYPE OF CONCRETE
REPAIR FOR DETERIORATED
CRACKS AREAS BASED ON
DEGREE OF CONCRETE OF
DETERIORATION |
2021 |
2021 |
0 |
INVESTIGATION & TESTING ,
ANALYSIS AND REPORTING ,
DETAILEREPAIR , ENGINEERING
METHODOLGY INCLUDING BOQ
AND REPAIR MATERIAL
SPECIFICATION , REPAIR
SUPERVISION |
ABU DHABI DISTRIBUTION COMPANY |
United Arab Emirates UAE |
|
STRUCTURAL DESIGN AND VERIFICATION CONSULTANCY OF STABILITY OF EXISTING VALVE CHAMBER AND WASH FOR ADDC CONTRACT D-8601 |
CONSULTANCY SERVICES FOR
STRUCTURAL DESIGN
CALCULATION OF THRUST BLOCKS
ON THE TIE-IN CONNECTION OF
THE OD335MM HDPE PIPELINE
WITH DN1200MM DI PIPELINE |
2021 |
2021 |
0 |
STRUCTURAL DESIGN
VERIFICATION |
ABU DHABI DISTRIBUTION COMPANY |
United Arab Emirates UAE |
No Image
|
DESIGN CONSULTANCY SERVICES FOR DESIGN AND SUPERVISION OF PERMANENT 22 KV FEEDING ARRANGEMENT FOR WEST YAS |
D- ESIGN REVIEW FOR CABLING
WORKS I.E. LAYING OF 22 KV
CABLES. |
2019 |
2019 |
0 |
- Design Review
- Site Supervision |
SWITCHGEAR ELECTROMECHANICAL |
United Arab Emirates UAE |
|
INSTALLATION OF 800 MM DIA DI PIPE – DESIGN OF LINE ANCHOR SUPPORTS |
ELOCATION OF TRANSCO DN 800
MM AND STRUCTURAL DESIGN |
2019 |
2019 |
0 |
ENGINEERING WORK FOR
RELOCATION OF TRANSCO
WATER DN MM WATER LINE |
SAABA CORPORATION F.Z.E |
United Arab Emirates UAE |
No Image
|
RESIDENTIAL COMPOUND OF 38 VILLAS, KHALIFA CITY – ABU DHABI – SUPERVISION CONTRACT AGREEMENT |
DESIGN OF WATER NETWORK FOR
38 VILLAS AT KHALIFA CITY |
2019 |
2019 |
0 |
DESIGN
SITE SUPERVISION |
M/S LINDENBERG WATER & DRAINAGE |
United Arab Emirates UAE |
|
DESK STUDY OF WASTEWATER EVAPORATION PONDS AT NEW CAPITAL POWER PLANT |
PROVIDING EVAPORATION ROLE ,
AERATION SYSTEM , POND
CLEANING |
2020 |
2022 |
0 |
REVIEW , FEASIBILITY STUDY ,
CONCEPT DESIGN , DETAILED
DESIGN , TENDER SPECIFICATION
, SUPERVISION |
EGYPTIAN ELECTRICITY HOLDING CO. |
Egypt |
|
INTRO GROUP – NCMP CCHP PLANT |
GAS ENGINE , HRSG AND COOLING
SYSTEM |
2021 |
2022 |
0 |
PREPARING DESIGN , TENDER
PREPARATION , EVALUATION OF
BIDDERS TILL AWARDING
CONTRACT FOR CHP PLANT
(INCLUDING GAS TIMELINE ) HEAT
RECOVERING STEAM
GENERATOR , BLACK START
DIESEL GENERATOR AND THEIR
AUXILIARIES
PAST CONTRACT WORK REVIEW
OF CONTRACTOR ,
SPECIFICATION AND DRAWING
SITE SUPERVISION , ATTENDING
LOCAL FACTORY , INSPECTION ,
COMMISSIONING , HANDING OVER
TO OWNER , PERFORMANCE TEST , GUARANTEE , PREPARING
SPARE PARTS ACTIVITIES TILL
FINAL ACCEPTANCE TEST |
INTRO UTILITIES SAE |
Egypt |
|
CHECKING PF ELECTRIC ENERGY METERS AND WATER DISCHARGE METERS FOR AL REHAB CITY (1,2) CITIES |
CHECKING OF ELECTRIC ENERGY
METERS AND WATER DISCHARGE
METERS FOR AL REHAB 1,2 CITIES |
2020 |
2020 |
0 |
Review of Installation Correctness
and Function for Electric Models -
Preparing list for Finally Meters |
AL REHAB CITIES AUTHORITY |
Egypt |
|
MADINATY STUDY AND RECOMMENDATION OF BEST PRACTICAL SOLUTION FOR THE EXISTING ROUTER |
REVIEW THE LOCATIONS OF
ANTENNAE FOR REPAIR AND
UPGRADE OF THE EXISTING
SOFTWARE AND REGARDING V1
TO IMPROVE THE COMMUNICATION
WITH THE MAIN SERVER IN
MADINATY BY USING “SUPERCOM “
OR UPGRADING EXISTING
SOFTWARE |
2019 |
2020 |
0 |
REVIEW OF DESIGN ,
EVALUATION |
TALAAT MOUSTAFA GROUP (TMG ) |
Egypt |
|
STUDY OF KHAZAN EL BAREEDS ELECTRICAL FOOD ALREHAB 1 |
ELECTRIC LOAD CALCULATION BY
TWO PHYSICAL METHODS DUE TO
FAILURE OF ONE IMPORTANT
ELECTRIC METER
HYDRAULIC CALCULATIONS FOR
POTABLE WATER CONSUMPTIONS
MEASURING METERS
CONSIDERING EFFICIENCY OF
RESPECTIVE PUMPS |
2020 |
2020 |
0 |
ARAB COMPANY FOR
PROJECTS AND URBAN
DEVELOPMENT |
ARAB COMPANY FOR PROJECTS AND URBAN DEVELOPMENT |
Egypt |
|
Number of projects: 279
|