PROVISION OF CONSULTANCY SERVICES FOR CIVIL REFURBISHMENT FOR M40 PRIMARY EASTERN REGION (CONSULTANCY AGREEMENT NO. D-109791) CONSULTANT SHALL RECOMMEND SUITABLE TYPE OF CONCRETE REPAIR FOR DETERIORATED CRACKS AREAS BASED ON DEGREE OF CONCRETE OF DETERIORATION 2021 2021 0 INVESTIGATION & TESTING , ANALYSIS AND REPORTING , DETAILEREPAIR , ENGINEERING METHODOLGY INCLUDING BOQ AND REPAIR MATERIAL SPECIFICATION , REPAIR SUPERVISION ABU DHABI DISTRIBUTION COMPANY United Arab Emirates UAE
STRUCTURAL DESIGN AND VERIFICATION CONSULTANCY OF STABILITY OF EXISTING VALVE CHAMBER AND WASH FOR ADDC CONTRACT D-8601 CONSULTANCY SERVICES FOR STRUCTURAL DESIGN CALCULATION OF THRUST BLOCKS ON THE TIE-IN CONNECTION OF THE OD335MM HDPE PIPELINE WITH DN1200MM DI PIPELINE 2021 2021 0 STRUCTURAL DESIGN VERIFICATION ABU DHABI DISTRIBUTION COMPANY United Arab Emirates UAE No Image
DESIGN CONSULTANCY SERVICES FOR DESIGN AND SUPERVISION OF PERMANENT 22 KV FEEDING ARRANGEMENT FOR WEST YAS D- ESIGN REVIEW FOR CABLING WORKS I.E. LAYING OF 22 KV CABLES. 2019 2019 0 - Design Review - Site Supervision SWITCHGEAR ELECTROMECHANICAL United Arab Emirates UAE
INSTALLATION OF 800 MM DIA DI PIPE – DESIGN OF LINE ANCHOR SUPPORTS ELOCATION OF TRANSCO DN 800 MM AND STRUCTURAL DESIGN 2019 2019 0 ENGINEERING WORK FOR RELOCATION OF TRANSCO WATER DN MM WATER LINE SAABA CORPORATION F.Z.E United Arab Emirates UAE No Image
RESIDENTIAL COMPOUND OF 38 VILLAS, KHALIFA CITY – ABU DHABI – SUPERVISION CONTRACT AGREEMENT DESIGN OF WATER NETWORK FOR 38 VILLAS AT KHALIFA CITY 2019 2019 0 DESIGN SITE SUPERVISION M/S LINDENBERG WATER & DRAINAGE United Arab Emirates UAE
DESK STUDY OF WASTEWATER EVAPORATION PONDS AT NEW CAPITAL POWER PLANT PROVIDING EVAPORATION ROLE , AERATION SYSTEM , POND CLEANING 2020 2022 0 REVIEW , FEASIBILITY STUDY , CONCEPT DESIGN , DETAILED DESIGN , TENDER SPECIFICATION , SUPERVISION EGYPTIAN ELECTRICITY HOLDING CO. Egypt
INTRO GROUP – NCMP CCHP PLANT GAS ENGINE , HRSG AND COOLING SYSTEM 2021 2022 0 PREPARING DESIGN , TENDER PREPARATION , EVALUATION OF BIDDERS TILL AWARDING CONTRACT FOR CHP PLANT (INCLUDING GAS TIMELINE ) HEAT RECOVERING STEAM GENERATOR , BLACK START DIESEL GENERATOR AND THEIR AUXILIARIES PAST CONTRACT WORK REVIEW OF CONTRACTOR , SPECIFICATION AND DRAWING SITE SUPERVISION , ATTENDING LOCAL FACTORY , INSPECTION , COMMISSIONING , HANDING OVER TO OWNER , PERFORMANCE TEST , GUARANTEE , PREPARING SPARE PARTS ACTIVITIES TILL FINAL ACCEPTANCE TEST INTRO UTILITIES SAE Egypt
CHECKING PF ELECTRIC ENERGY METERS AND WATER DISCHARGE METERS FOR AL REHAB CITY (1,2) CITIES CHECKING OF ELECTRIC ENERGY METERS AND WATER DISCHARGE METERS FOR AL REHAB 1,2 CITIES 2020 2020 0 Review of Installation Correctness and Function for Electric Models - Preparing list for Finally Meters AL REHAB CITIES AUTHORITY Egypt
MADINATY STUDY AND RECOMMENDATION OF BEST PRACTICAL SOLUTION FOR THE EXISTING ROUTER REVIEW THE LOCATIONS OF ANTENNAE FOR REPAIR AND UPGRADE OF THE EXISTING SOFTWARE AND REGARDING V1 TO IMPROVE THE COMMUNICATION WITH THE MAIN SERVER IN MADINATY BY USING “SUPERCOM “ OR UPGRADING EXISTING SOFTWARE 2019 2020 0 REVIEW OF DESIGN , EVALUATION TALAAT MOUSTAFA GROUP (TMG ) Egypt
STUDY OF KHAZAN EL BAREEDS ELECTRICAL FOOD ALREHAB 1 ELECTRIC LOAD CALCULATION BY TWO PHYSICAL METHODS DUE TO FAILURE OF ONE IMPORTANT ELECTRIC METER HYDRAULIC CALCULATIONS FOR POTABLE WATER CONSUMPTIONS MEASURING METERS CONSIDERING EFFICIENCY OF RESPECTIVE PUMPS 2020 2020 0 ARAB COMPANY FOR PROJECTS AND URBAN DEVELOPMENT ARAB COMPANY FOR PROJECTS AND URBAN DEVELOPMENT Egypt
Number of projects: 279