Desalination plant at Hong Kong |
plant capacity 144.200 M3/D,6 TVC designate units 3 Aux. Boiler of 210 T/hr each at 20 bar 2 HRSG OF 24 T/hr each at 20 bar 2 gas turbine of 10 MW each |
2001 |
2001 |
170 |
Preparation of preliminary design report |
water supply department – government of Hong Kong |
Hong Kong |
|
Batha Power and Desalination Plant |
3 diesel engines 400 kw each.1500 extendable to 3x1500 m3/day TVC desalination units.Product water transmission line (30 km).Sea water intake and housing complex |
1996 |
1998 |
10 |
Design report, tender documents and bid evaluation |
Ministry of National Economy & Finance, Saudi Arabia |
Saudi Arabia |
|
Relocation of Desalination Units from Mirfa to Dalma |
Relocation of 2x1 MIGD TVC desalination units from Mirfa to Dalma |
2003 |
2005 |
15 |
Preparation of Tender Documents, Bids Evaluation, site supervision including guarantee period. |
Water and Electricity Department, Abu Dhabi, UAE. |
United Arab Emirates UAE |
|
Sharm El-Sheikh Power & Desalination Plant |
2 x 250MW ISO Gas Turbines.140MW Steam Back Pressure Turbine.5x5 MIGD MED-TVC.2xHRSG boilers in association with gas turbines
|
2001 |
2001 |
450 |
Preliminary Design Report + Economical and financial study for IPWP |
Egyptian Electricity Holding Co. Egypt. |
Egypt |
|
Sewage Network & WasteWater Treatment Plant for Santa Maria in Sal Phase II |
Sewage Network & WasteWater Treatment Plant for Santa Maria in Sal Island |
2006 |
2008 |
0 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of construction, commissioning and guarantee period. |
Ministry of Infrastructure and Transportation, Cap-Verde |
Cap Verde |
|
Addition of Desalination Units No. 9 and 10 at Umm Al Nar Power and Desalination Plant |
2x3.5 MIGPD TVC Desalination Units using extraction steam from condensing turbines complete with all auxiliaries and ancillaries. |
1997 |
2000 |
55 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation. |
Water & Electricity Department, Government of Abu Dhabi |
United Arab Emirates UAE |
|
Ras Al-Khaimah Sea Water Desalination Plant |
2x1.5 MIGPD V.C. Desalination Units.2x49 t/hr auxiliary boilers.Sea water intake and pumping station.All associated electrical,instrumentation control,civil and building works.
|
1996 |
1999 |
34 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of construction, commissioning and guarantee period. |
Water & Electricity Department, Government of Abu Dhabi |
United Arab Emirates UAE |
|
3x1 MIGPD Desalination Unit at Jabal Al-Dhannah and Dalma Island |
3x1 MIGPD ME/MSF Desalination units - 3x30 t/hr fuel oil firing boilers - 5000 m3 steel + 3000 m3 concrete product water tanks - All associated electrical, instrumentation, control, civil and building works. |
1994 |
1997 |
34 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of construction, commissioning and guarantee period. |
Water and Electricity Department, Government of Abu Dhabi |
United Arab Emirates UAE |
|
Hurghada and Sharm El-Sheikh Power and Desalination Plants |
Two plants at Hurghada and Sharm El-Sheikh each comprising of:2x300 m3/day vapour compression desalination units,3x1.2 MW diesel generating sets.
|
1990 |
1991 |
6 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties (later changed to R.O. plant - see E.3). |
Abu Dhabi Tourist Investment Company |
Egypt |
|
Yemen Assessment of power and transmission |
Assessment of plant system, and operating history for Yemen whole technical transmission systems and all power generation plants. |
1999 |
1999 |
0 |
Data collection, visual assessments of representation equipment, assess plant system & operating history. |
Sargent & Lundy |
Yemen |
|
Number of projects: 279
|