Consultancy Services for Design Stability of Piping System in Pump Room - The Development of South Shamkha Infrastructure, Lot-1 (Cont No. 2011/61) - Pipe Stress Analysis |
Design Stability of Piping System in Pump Room - The Development Of South Shamkha Infrastructure, Lot-1 - Pipe Stress Analysis |
2014 |
2015 |
0 |
Hydraulic Studies (Steady State, Un-Steady State), Hydraulic Model, Detailed Design |
Federal Electricity & Water Authority FEWA |
United Arab Emirates UAE |
No Image
|
Design of Training Center and Mosque at P&G s New Plant |
Prepare and Carrying Out the Construction Design Package Design Calculation, Detailed Drawings, Bill of Quantities and Specifications For The Landscaping and Layout of the External Works and All Architectural Design |
2014 |
2015 |
1.2 |
Detailed Design, Topographical Survey |
PROCTER and GAMBLE |
Egypt |
No Image
|
Transmission Pipeline Within City and Industrial Area – Ajman |
Transmission Pipeline Within City and Industrial Area – Ajman |
2014 |
2015 |
0.5 |
Hydraulic Studies (Steady State, Un-Steady State), Hydraulic Model |
Federal Electricity & Water Authority FEWA |
United Arab Emirates UAE |
No Image
|
Technical Evaluation Report About Advanced Meter Infrastructure (Ami) For Madinaty Project. |
Review The Technical Submission of Supplier (Golden Power & Having Co.) And Evaluation the Preliminary Offer Against International Standard. |
2014 |
2015 |
0.5 |
Evaluation Report, Data Collection, Review of Current Specification |
Madinaty Electromechanical Power Company (MEPC) |
Egypt |
No Image
|
Consultancy services for soil settlement investigation at al taweelah B plant |
Sea water pumping station, distiller unit and power unit foundation, pipe rack settlement of fills & soil movement for civil structure/pipes for data collection, samples collection, measurements, analysis of samples and measurements, results analysis, technical recommendations, design & specification preparation for remedial works in determined locations at altaweelah site
|
2013 |
2014 |
1500 |
studying different possible causes of movement and distress, data collection, site survey and site investigation, technical assessment
|
Asia Gulf Power Services Company Limited |
United Arab Emirates UAE |
|
2x(500-600)MW Power Station with the Associated Transmission System Reinforcements |
Study the different fuel alternative (including coal) to select the feasible & viable and least cost solution for fuel to build power station 500-600 mw in Aden and Hodeidah, study the impact of adding the power station on the national grid and transmission system reinforcement needed. |
2013 |
2020 |
1200 |
Feasibility study, study
Report, concept design,
Tender document
|
MINISTRY OF ELECTRICITY AND ENERGY |
Yemen |
|
Sur Desalination Plant Phase II (IWP) |
Seawater RO Desalination Plant, Phase II - 15 MIGD SWRO (Reverse Osmosis), independent water project IWP, Seawater intake and outfall, Filtration system, Limestone building, RO building, Water storage Piping, all Civil steel structure building works project suspended at contractor bidding evaluation stage
|
2013 |
2016 |
150 |
Concept Drawings, Structural detailed design for all the plant components including coordination with E/M works.
|
Bahwan Engineering Co. |
Sultanate Of Oman |
|
Connect seawater intake line from phase III intake to phase II settling basin |
seawater supply discharge lines coming from the seawater intake channel via five seawater pumps to seawater pumps to seawater discharge header supplying raw seawater to desalination units 5,6,1,2
|
2013 |
2014 |
0.5 |
Study Report, Concept Design,
|
Al Ghubrah Power & Desalination Co. GPDCO / Millions |
Sultanate Of Oman |
No Image
|
Construction of new seawater intake systems at masirah and duqm desalination plants |
construction earth bridge from the shore to the pump station platform, platform including shed and 5 tons monorail, construction pipeline, fence area, foundation and other civil works
|
2013 |
2015 |
8 |
Study Report, Concept Design, Tender Document, Bid Evaluation , Assistance to Prepare Contract, Construction Management & Supervision, Guarantee Supervision
|
Rural Areas Electricity Co. |
Sultanate Of Oman |
No Image
|
Construction Services For Phase III Seawater Intake Culvert Concrete Slab Repair And Impressed Current Cathodic Protection System Inspection And Recommendation In Al Ghubrah Plant |
Checking And Recommendation, Preparation Of Necessary Scope Of Work For Repair, Commercial & Technical Evaluation Of Offers Received From The Contractors, Inspection The Impressed Current Cathodic Protection Supervision Of Project Execution And Submission Of Work Completion Report |
2013 |
2015 |
0.5 |
Collect Of Data, Studying, Preparing The Tender Document, Technical & Commercial Evaluation And Site Supervision
|
Al Ghubrah Power & Desalination Co. GPDCO |
Sultanate Of Oman |
No Image
|