Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Technical and Financial Evaluation to Extend Life Time of Midelec Power Station Turbines (LTE) |
Technical and Financial Evaluation of Siemens Co Offer to Extend A Life Time Gt11 & Gt21 Turbines(LTE) |
2015 |
2015 |
43 |
Life Time Extension Report (LTE) |
MIDELEC |
Egypt |
|
Economical Study for Installing a New Natural Gas Fired Engine in Sadat City in Egypt |
Economical Analysis Is to Compare Cost of Electricity Purchased Over Two Years to Gas Engine Capital Cost and Operating Costs for The Same Period |
2015 |
2015 |
32 |
Study Report, Feasibility Study |
Uniboard Al Mohtaheda Paper & Board |
Egypt |
|
Calculations of Energy Cost Saving by Using Led Lighting |
ETG Company – Represented by Eng. Islam Gabr – Offered The Calculation of Energy Cost Saving by Replacing the Traditional Lighting by Led Lighting |
2015 |
2015 |
1 |
Revise The Calculations Made by Etg for Saving of Electrical Energy by Using Led Lighting the Financial Include Fixer Cost of Aperatnity |
Arab Company for Projects and Urban Development |
Egypt |
No Image
|
Concrete Testing and Structural Integrity to Mv&Lv Switchgear Room Building at Elsokhna Power Plant |
Suez Golf Power Plant at Km 52 Suez City Ain Soukhna Structural Integrity Report |
2015 |
2015 |
0.3 |
Soil Investigation, Structural Integrity Report |
Powertek Energy SDN BHD |
Egypt |
No Image
|
Consultancy Services for Replacement of Existing Water Distribution Network in Mussafah Industrial Area of Eastern Region for Sectors M-9, M-10, M-11, M-12, M-13, M-14, M-15, M-16 & M-20 |
Replacement Of Existing Water Distribution Network In Mussafah Industrial Area Of Eastern Region For Sectors M-9, M-10, M-11, M-12, M-13, M-14, M-15, M-16 & M-20. The Anticipated Quantity Of Pipelines To Be Replaced Is Approximately 86km With All Associated Civil Works |
2014 |
2018 |
23 |
Study Report, Site Survey, Design Report, Tender Document, Bid Evaluation, Evaluation Report, Site Supervision |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
|
Design of Gas Power Plant at Company Field Using Associated Gas in Hurghada |
3 Phases Project for Construction of A Gas Power Plant Using Existing Flared Associated Gas, Phase I Feasibility Study & Basic Design, Phase II Detailed Design & Tendering Package, Phase III Site Management & Construction Supervision |
2014 |
2017 |
9 |
Feasibility Study, Basic Design, Tender Document, Construction Management & Supervision, Planning, Forecast |
Esh El Mallaha Petroleum Company |
United Arab Emirates UAE |
No Image
|
Reinforcement Of Wadi Al Ayn Well Production Capacity In Adh Dhahira Governorate |
Design Review And Supervision For 14 Nos. Of Water Wells With Pipelines Network Length 9.9km And Pipeline Size Range Between 150mm-600mm Diameter Class 40 Ductile Iron. |
2014 |
2016 |
6.6 |
Construction Management & Supervision, Design Review |
Public Authority for Electricity and Water PAEW |
Sultanate Of Oman |
No Image
|
Drilling Water Wells In Al Ain And Western Region Areas And Installation Of Casting And Screen To The Full Completion Depth In Al Ain Area |
Drilling 135 Water Wells In Al Ain Area And 280 Water Wells In Western Region And Installation Of Casing And Screen To The Full Completion Depth In Al Ain Area |
2014 |
2016 |
3 |
Detailed Design, Construction Management & Supervision |
Abu Dhabi Food Control Authority |
United Arab Emirates UAE |
No Image
|
The Development of South Shamkha Infrastructure Lot 1 |
Construction of 2 New Pump Stations at South of Shamkha & 200 Km Piplines Ranging from 800 Mm to 100 Mm |
2014 |
2015 |
117 |
Surge Analysis, Pipe Street Analysis, Surge Vessel Foundation Design |
MUSANDAH |
United Arab Emirates UAE |
|
Consultancy Services for Relocation of Transco Water Transmission at SHM-6 |
Relocation of Transco Water Transmission at SHM-6 |
2014 |
2015 |
19.4 |
Hydraulic Studies (Steady State, Un-Steady State), Hydraulic Model |
Dongmyeong Engineering Consultants |
United Arab Emirates UAE |
|
Number of projects: 279
|