Saadiyat Desalination Plant 480,000 IGPD Desalination Plant 1974 1975 15 Feasibility Study, Engineering Design, Preparation of Tender Documents and Bids Evaluation Water and Electricity Department, Abu Dhabi United Arab Emirates UAE
Abu Dhabi Power & Desalination Plant Extension (Phases I and II) 140 MW Power (4x20 MW + 2x30 MW) & 4x3 MIGPD Desalination Plant 1974 1979 120 Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of construction and commissioning. Water and Electricity Department, Abu Dhabi United Arab Emirates UAE
Water Distribution Network 2 high level reservoirs, each of 1/2 Million Gallons, Main Pumping Station, Ductile Cast Iron Pipe of 60 cm. diameter. 1973 1975 7 Design, preparing Tender Documents, Tender Analysis, Post Contract Duties including supervision of construction and commissioning. Water and Electricity Department United Arab Emirates UAE
Diesel Power Station and Water Desal. Plant Saadiyat Island 2x3.8 MW Diesel Power Station running on crude oil 1973 1975 7 Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction and commissioning. Water and Electricity Department, Abu Dhabi. United Arab Emirates UAE
Umm Al Nar East Power & Desalination Plant Two gas turbines, of 91.1 MW ISO rating each, Exhaust Heat Recovery Boilers 2x160 tons/hr, 210C 16 bar, 4 natural gas and liquid fuel fired auxiliary boilers 140 ton/hr each and 3x5/6 MIGPD desalination plant. 1973 1981 160 Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction, Commissioning and guarantee period. Water and Electricity Department - Abu Dhabi United Arab Emirates UAE
Umm Al Nar West Power & Desalination Plant (Units 1 to 6) 6x60 MW extraction condensing type turbines, 6x365 tons/hr natural gas and liquid fuel fired boilers at 60 bar and 480 C and 6x4 MIGPD desalination plant (In Two Phases) 1973 1981 262 Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including Supervision of Construction and Commissioning. Water and Electricity Department, Abu Dhabi United Arab Emirates UAE
Feasibility Study for Power Generation Feasibility Study for Power Generation and Electrification for Sultanate of Oman 1972 1973 0 Feasibility Studies Planning & Development Department, Sultanate Of Oman
Al Ain Power Station Extension Phase II 1 x 3.75 MW Diesel Power Station running on crude oil 1972 1974 1.2 Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction and commissioning. Water and Electricity Department, Abu Dhabi. United Arab Emirates UAE
Load Forecast and Network Analysis for 132 KV, 33 KV and 11 KV Systems and Design of O.H.T.L and cables Load forecast and network analysis for 132, 33 and 11 KV systems,Design for 33 KV and 11 KV O.H.T.L and cables 1971 1972 0 Load Forecast, Network Analysis and Design Abu Dhabi United Arab Emirates UAE
Radio and Television Centre Radio and Television Centre with all associated services. 1971 1973 43 Engineering Design, preparing Tender Documents, Bids Evaluation, Post Contract Duties including supervision of construction and commissioning of Elect., Mechanical, Air Conditioning, Fire Protection and Plumbing and Drainage Services. Ministry of Public Works - Kuwait Kuwait