Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
PROVISION OF CONSULTANCY SERVICES FOR CIVIL REFURBISHMENT FOR M40 PRIMARY EASTERN REGION (CONSULTANCY AGREEMENT NO. D-109791) |
CONSULTANT SHALL RECOMMEND
SUITABLE TYPE OF CONCRETE
REPAIR FOR DETERIORATED
CRACKS AREAS BASED ON
DEGREE OF CONCRETE OF
DETERIORATION |
2021 |
2021 |
0 |
INVESTIGATION & TESTING ,
ANALYSIS AND REPORTING ,
DETAILEREPAIR , ENGINEERING
METHODOLGY INCLUDING BOQ
AND REPAIR MATERIAL
SPECIFICATION , REPAIR
SUPERVISION |
ABU DHABI DISTRIBUTION COMPANY |
United Arab Emirates UAE |
|
STRUCTURAL DESIGN AND VERIFICATION CONSULTANCY OF STABILITY OF EXISTING VALVE CHAMBER AND WASH FOR ADDC CONTRACT D-8601 |
CONSULTANCY SERVICES FOR
STRUCTURAL DESIGN
CALCULATION OF THRUST BLOCKS
ON THE TIE-IN CONNECTION OF
THE OD335MM HDPE PIPELINE
WITH DN1200MM DI PIPELINE |
2021 |
2021 |
0 |
STRUCTURAL DESIGN
VERIFICATION |
ABU DHABI DISTRIBUTION COMPANY |
United Arab Emirates UAE |
No Image
|
CONSULTANCY SERVICES FOR DESALINATON PLANT AT PORTSAID WEST 20000M3/DAY (NOPWASD) |
ESTABLISHMENT OF A
DESALINATION PLANT WITH A
CAPACITY OF 20000M3 /DAY IN
WEST PORT SAID USING BEACH
WELLS AS A SOURCE OF RAW
WATER INCLUDING PILOT PLANT |
2021 |
2023 |
30 |
DESIGN REVIEW , SITE
SUPERVISION , PILOT PLANT |
NATIONAL ORGANIZATION FOR POTABLE WATER AND SANITARY DRAINAGE(NOPWASD) |
Egypt |
No Image
|
INTRO GROUP - NCMP - CHP – PLANT |
10MW CHP GAS TURBINE
GENERATOR , HRSG AND
AUXILIARIES , CIVIL WORKS |
2021 |
2022 |
20 |
PREPARING DESIGN , TENDER
PREPARATION , EVALUATION OF
BIDDERS TILL AWARDING
CONTRACT FOR CHP PLANT
(INCLUDING GAS TIMELINE ) HEAT
RECOVERING STEAM
GENERATOR , BLACK START
DIESEL GENERATOR AND THEIR
AUXILIARIES
PAST CONTRACT WORK REVIEW
OF CONTRACTOR ,
SPECIFICATION AND DRAWING
SITE SUPERVISION , ATTENDING
LOCAL FACTORY , INSPECTION ,
COMMISSIONING , HANDING OVER
TO OWNER , PERFORMANCE
TEST , GUARANTEE , PREPARING
SPARE PARTS ACTIVITIES TILL
FINAL ACCEPTANCE TEST |
INTRO UTILITIES SAE |
Egypt |
|
INTRO GROUP – NCMP CCHP PLANT |
GAS ENGINE , HRSG AND COOLING
SYSTEM |
2021 |
2022 |
0 |
PREPARING DESIGN , TENDER
PREPARATION , EVALUATION OF
BIDDERS TILL AWARDING
CONTRACT FOR CHP PLANT
(INCLUDING GAS TIMELINE ) HEAT
RECOVERING STEAM
GENERATOR , BLACK START
DIESEL GENERATOR AND THEIR
AUXILIARIES
PAST CONTRACT WORK REVIEW
OF CONTRACTOR ,
SPECIFICATION AND DRAWING
SITE SUPERVISION , ATTENDING
LOCAL FACTORY , INSPECTION ,
COMMISSIONING , HANDING OVER
TO OWNER , PERFORMANCE TEST , GUARANTEE , PREPARING
SPARE PARTS ACTIVITIES TILL
FINAL ACCEPTANCE TEST |
INTRO UTILITIES SAE |
Egypt |
|
CONSULTANCY SERVICES FOR DESIGN VERIFICATION, OBTAINING NOC AND BUILDING PERMIT FOR ADDC PROJECT NO. D-109056 |
DESIGN VERIFICATION, OBTAINING
NOC AND BUILDING PERMIT |
2021 |
2022 |
0 |
DESIGN VERIFICATION &
OBTAINING NOCS’ |
ABU DHABI MAINTENANCE AND CONSTRUCTION |
United Arab Emirates UAE |
No Image
|
CONSULTANCY ASSISTANCE ON MUNICIPALITY APPLICATION FOR ABU DHABI ISLAND PROJECT NO. D-108403 |
WATER SUPPLY TO RECYCLE
WATER TANKS IN ABU DHABI |
2021 |
2021 |
0 |
OBTAINING NOCS’ AND DESIGN
VERIFICATION |
ABU DHABI DISTRIBUTION COMPANY |
United Arab Emirates UAE |
|
CONSULTANCY SERVICES FOR REINFORCEMENT OF 33KV AND 11KV NETWORKS IN AL DHAFRA REGION (CONSULTANCY AGREEMENT NO. D-109639) |
CONSULTANCY SERVICES FOR
DESIGN AND SITE SUPERVISION FOR PROVIDING POWER SUPPLY
TO AL YEEF DEVELOPMENT
PROJECT – LIWA AREA BEING
DEVELOPED BY MUSANADA IN
ADDITION TO ADDC
REINFORCEMENT PLANS TO
MITIGATE NETWORK LIMITATIONS. |
2021 |
2023 |
0 |
INVESTIGATION, STUDIES &
DESIGN,FINAL DESIGN & CONTRACTOR(S) TENDER
DOCUMENTS,TENDERING,
EVALUATION & AWARDING,SITE
SUPERVISION DURING
CONSTRUCTION PERIOD,FIELD
SUPERVISION DURING
WARRANTY PERIOD |
ABU DHABI DISTRIBUTION COMPANY |
United Arab Emirates UAE |
|
INTRO GROUP – NCMP CHP PLANT |
OPERATION , MAINTENANCE AND
LONG TERM SERVICES
AGREEMENT |
2021 |
2024 |
40 |
TENDER : AN OPERATION AND
MAINTENANCE AGREEMENT TO
BE SIGNED WITH EITHER THE EPC
CONTRACTOR OR THE OEM ,
WHICH INCLUDES THE
OPERATION OF THE TURBINE AND
BALANCE OF THE PLANT , AS
WELL AS THE MAINTENANCE FOT
THE HRSG AND THE B.O.P FOR
FOUR YEARS AND AFTER
EVALUATION OF TENDERS WILL
BE A CONTRACT FOR SELECTED
BIDDERS .
2ND CONTRACT A LONG TEM
SERVICES AGREEMENT TO BE
SIGNED DIRECTLY WITH THE
TURBINE MANUFACTURE THE
MAIN SCOPE OF THE
AGREEMENT ID MAJOR
MAINTENANCE OF THE TURBINE
FOR 10 YEARS |
INTRO UTILITIES SAE |
Egypt |
|
DESK STUDY OF WASTEWATER EVAPORATION PONDS AT NEW CAPITAL POWER PLANT |
PROVIDING EVAPORATION ROLE ,
AERATION SYSTEM , POND
CLEANING |
2020 |
2022 |
0 |
REVIEW , FEASIBILITY STUDY ,
CONCEPT DESIGN , DETAILED
DESIGN , TENDER SPECIFICATION
, SUPERVISION |
EGYPTIAN ELECTRICITY HOLDING CO. |
Egypt |
|
Number of projects: 279
|