English | العربي
Repair Treatment of Cracked Concrete Structures at Port Said
Description: Repair of Cracked Concrete Structures Including Intake System at Port Said East Power Plant
Start Date: 2016
Complation Date: 2017
Cost: 0.4 million US $
Services Provided: Study Report, Design of Repair of Cracked Concrete Structure
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved