Repair Treatment of Cracked Concrete Structures at Port Said |
|
Description: |
Repair of Cracked Concrete Structures Including Intake System at Port Said East Power Plant |
Start Date: |
2016 |
Complation Date: |
2017 |
Cost: |
0.4 million US $ |
Services Provided: |
Study Report, Design of Repair of Cracked Concrete Structure |
|
|