English | العربي
Ben Ban Electrical Transmission (Solar Project)
Description: Transmission of The Solar Electric Power from The Solar Plots (39 Plots with Total Power of 1850 Mw) At Benban Area – Aswan – Upper Egypt Electricity Area to Their Located Step Up Substations (4 Nos) 22/22/220 Kv to Be Connected to The National Grid (220 Kv Level) At The Same Area. By Using Underground Cables, 18/30 Xpls Inside Trenches from The Solar Plots to The (4 Nos) Substations.
Start Date: 2016
Complation Date: 2016
Cost: 181 million US $
Services Provided: Technical Study for The Suitable Cross Section of Underground Cables to Be Used for Transmitting Generated Power (About 1850 Mw) Laid in Trenches with Size and Type Suitable for Power to Be Transmitted, Conceptual & Detailed Mv Cables/ Fo Cables Routing Layout from Each Solar Plot Up to The 22/22/220 Kv Step-Up Hv Substation, Coordinating with The Civil Engineering Works.