Updating and Standardizing the Requirements for Smart Network and Metering System |
|
Description: |
The Scope Include the Following -Smart Electric Meters Single 3 Phases
-Commutation Networks Complete Between Smart Meters and Scada System
-Complete Billing System and Remote Control of All Meters Via Gprs/ Rf / Fo Netw -K -Remote Control of Meter Tarff: Monitoring All Mv/Lv/ Network in Scada System
-Street Lighting (Option) Small Networks Using Le
-Operation and Maintenance for Two Years.
|
Start Date: |
2016 |
Complation Date: |
2018 |
Cost: |
5 million US $ |
Services Provided: |
Data Collection, Tender Document, Prequalification Of Contractors, Analyzing Received Evaluation, Preparing Technical And Financial Reports Including Recommendation, Still Contractor Is Not Selected By MEPC |
|
|