Umm al Nar East Gas Turbine Power & Desalination Plant Extension |
Two gas turbines for 87 MW ISO rating each and 3x6/7.2 MIGPD desal. plants, 2 Waste Heat Recovery Boilers of 210 tons/hr each & 2 natural gas and liquid fuel fired auxiliary boilers of 160 t/hr. each. |
1981 |
1987 |
214 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction, Commissioning and guarantee period. |
Water and Electricity Department - Abu Dhabi |
United Arab Emirates UAE |
|
Umm Al Nar West Power & Desalination Plant Extension Units 7 & 8 |
2x160 MW extraction condensing type turbines, 2x625 tons/hr natural gas and liquid fuel fired reheat boilers at 126 bar and 510 C and 4x5/6 MIGPD desalination plant |
1981 |
1987 |
237 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including Supervision of Construction, Commissioning and. guarantee period. |
Water and Electricity Department, Abu Dhabi |
United Arab Emirates UAE |
|
Electrical Network Study for Capital Area |
Electrical Network Study for high and intermediate voltage (132, 33 and 11 KV) for current flow, short circuit, and stability including all existing power generating plants and future with all recommendations for modifications and future extensions. |
1982 |
1983 |
0 |
Network Study |
Sultanate of Oman |
Sultanate Of Oman |
|
Al-Taweelah "A" Gas Turbine Power and Desalination Plant - Steam Raising and Desalination Plant lot D |
Infra structure and site layout for 2500 to 3000 MWelectric power generation and 150 million gallons per day desalination plant in three phases complete with off shore and on shore sea water intake and outfall. 250, 800 and 1500 MW power for phases I, II and III respectively. Phase 1: 3 Gas Turbine Generating units for 117MW ISO rating each, 3 Desalination Plants 3x6/7.2 MIGPD, 3 EHR Boilers of 210 tons/hr, and 2x160 t/hr auxiliary boilers all 16 bar and 210C. Sea Water Intake & Outfall System alongwith its Civil & Building Works. |
1982 |
1992 |
370 |
Feasibility study and infra structure Engineering Design, Preparation of Tender Documents, Bids Evaluaiton, Post Contract duties including supervision of Construction, Commissioning and guarantee period for 1st phase. |
Water and Electricity Department - Abu Dhabi |
United Arab Emirates UAE |
|
Investigation & Inspection Ghubrah Power & Desalination Plant Sea Water Intake & Outfall Phase I |
Mobilization & Demobilization, On-Shore Water Structure and Off-Shore Water Structure
|
1984 |
1987 |
1 |
Laboratory test results , Preliminary Report and Final Report including economical studies
|
Public Authority for Electricity and Water PAEW |
Sultanate Of Oman |
No Image
|
Electrical Network and Forecast Studies |
Electrical Network and forecast studies for Sur Town |
1984 |
1985 |
0 |
Network Study |
Sultanate of Oman |
Sultanate Of Oman |
|
Umm Al-Nar West Power and Desalination Plant Extension, 7&8 Water Storage Tanks (Interconnection and Oxygenation) |
4x5 MIG water storage tanks, All related interconnecting piping (suction & delivery). |
1984 |
1987 |
7 |
Design, preparing Tender Documents, Tender Analysis, Post Contract Duties including supervision of construction and commissioning. |
Water and Electricity Department |
United Arab Emirates UAE |
|
Ghubrah Desalination and Steam Raising Plant Extension, Phase II |
2 Nos. 5/6 MIGPD Desalination Plants each, 2 aux. boilers 220 tons/hr. each, sea water intake jetty & pipe trestles of about 600m in length, settling basin, outfall system, dist. water tank and civil & building works. |
1984 |
1987 |
100 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction, commissioning and guarantee period. |
Ministry of Electricity and Water, Sultanate of Oman |
Sultanate Of Oman |
|
Al-Taweelah |
40 (4x10) MIG Water Storage Tanks,Town Water Pumping station (4x3625m3/h & 75m head),Discharge trunk mains 2x1200mm rubber lined D.C.I.,All relative interconnecting piping systems (suction, delivery, headers, valves),All blending, oxygenation & distillate water treatment systems |
1984 |
1992 |
24 |
Design, preparing Tender Documents, Tender Analysis, Post Contract Duties including supervision of construction, commissioning and guarantee period. |
Water and Electricity Department, Abu Dhabi, UAE. |
United Arab Emirates UAE |
|
Remote Areas R.O. Desalination Plants at Al-Wagon, Al-Koo and Umm Al-Zumul |
Three Reverse Osmosis Desalination Plants utilizing brackish water from wells at three sites, each site comprise 2 units, 100,000 IGD each |
1986 |
1987 |
10 |
Design, preparing Tender Documents, Tender analysis, Post Contract duties including Supervision of Construction and Commissioning. This project was canceled after the preparation of Tender Documents. |
Water and Electricity Department -Abu Dhabi |
United Arab Emirates UAE |
|
Number of projects: 279
|