Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Lime Treatment Plant for Al Taweelah "A" Desalination Plant |
Lime treatment unit for distillate water complete with tanks, pumps, injection systems,.etc. |
1998 |
2000 |
2 |
Preparation of Tender Documents, Bids Evaluation and Construction Supervision |
Water and Electricity Department, Abu Dhabi, UAE. |
United Arab Emirates UAE |
|
Construction of Integrated Simple Cycle Gas Turbine Power Plant at SUR |
Construction of a New Power plant with 2X30 or 3X20 MW Simple Cycle gas turbine at Birbuira site in SUR integrated with existing MEW network at SUR
|
1998 |
1998 |
60 |
Preparing Study Report and Design Report
|
Public Authority for Electricity and Water PAEW |
Sultanate Of Oman |
|
Ras Laffan Power and Desalination Plant |
750 MW combined cycle gas turbine and steam power plant in dual mode with 40 MIGPD (MSF) and desalination plant |
1999 |
2001 |
730 |
Design, cost estimate, preparation of RFP and evaluation of IWP offers for the desalination units. |
Qatar General Petroleum, Corporation (QGPC) Qatar |
Qatar |
|
HSP Project |
Build up an Extension for the Existing conveyors and Tank farm |
1999 |
1999 |
2 |
- Structural design for the carrying system and modifications for the steel structure
- Structural design of the tank farm extension.
- Producing all the detailed engineering steel and concrete drawings
|
Proctor & Gamble 6th of October Cairo- Egypt |
Egypt |
|
Mixing Building Extension & Strengthening of the Existing Mixing Building |
Build up an Extension phase to the existing mixing building and carrying out all the required strengthening for the existing mixing building steel structure |
1999 |
1999 |
2.5 |
Structural design for the building extension structure check for the stability of the details execution steel drawings specifications and Tender Documents:
- Conducting the site survey for the existing mixing building.
- Structural calculations for the New Extension for the Mixing Building and check the stability of the existing plant.
- Producing all the detailed engineering steel & concrete Drawings.
- Production of the Tender Documents and Technical Specification
|
Proctor and Gamble |
Egypt |
|
Dismantling and refitting of electro-mechanical equipment at power station |
Dismantling and refitting of electro-mechanical equipment at Umm Al Nar Power Stations |
1999 |
2001 |
3.25 |
Tender Documents, bids evaluation and works supervision |
Water and Electricity Department, Abu Dhabi, UAE. |
Sultanate Of Oman |
|
Repair and Refurbishment of Civil Works for Power Stations & Desalination Plants |
Refurbishment and repair of concrete and reinforced concrete mainly for distiller and turbine foundations, auxiliaries and ancillary concrete building structures deteriorated steel structural supports and damaged drain pipes,etc. |
1999 |
2001 |
15 |
Preparation of Tender Documents, Bids Evaluation and Construction Supervision |
Water and Electricity Department, Abu Dhabi, UAE |
United Arab Emirates UAE |
|
Refurbishment of 132kV Substation Building |
Different concrete repair works with associated civil works,Air conditioning |
1999 |
2001 |
2.7 |
Bids evaluation and supervision of construction |
Water & Electricity Department |
United Arab Emirates UAE |
|
Reeva Substation, Assiut |
2x75 + 2x25 transformers 220/66/11kv - 4x220 + 6x66 + 8x11 kv overhead lines |
1999 |
2000 |
11.1 |
Post contract duties including site supervision and approval of designs |
Egyptian Electricity Authority, North Upper Egypt Zone |
Egypt |
|
Yemen Assessment of power and transmission |
Assessment of plant system, and operating history for Yemen whole technical transmission systems and all power generation plants. |
1999 |
1999 |
0 |
Data collection, visual assessments of representation equipment, assess plant system & operating history. |
Sargent & Lundy |
Yemen |
|
Number of projects: 279
|