Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Nubaria Power Station |
2x750 MW combined cycle power Plant |
2003 |
2006 |
700 |
Participation at design review and site supervision |
EEHC |
Egypt |
|
Ras Laffan Power and Desalination Plant |
750 MW combined cycle gas turbine and steam power plant in dual mode with 40 MIGPD (MSF) and desalination plant |
1999 |
2001 |
730 |
Design, cost estimate, preparation of RFP and evaluation of IWP offers for the desalination units. |
Qatar General Petroleum, Corporation (QGPC) Qatar |
Qatar |
|
TCI Extension for Lang Building. |
Built up an extension for the TCI building to the north by 12m x 18m for 3 floors |
2003 |
2003 |
18 |
Structural design for the building extension structure Producing all the detailed drawings specifications and Tender Documents:
- Conducting the site survey for the existing new mixing building.
- Structural calculations for the New Extension for the Mixing Building and check the stability of the existing TCI building.
- Producing all the detailed drawings for concrete strap beams foundation and structure steel.
- Production of the Tender Documents and Technical Specification
|
Proctor & Gamble |
Egypt |
|
Lift and Hoist Shaft tower (+30.50) Floor Extension |
Built up hoist shaft tower of 40m light and extension for the floor at El (+30.50) |
2004 |
2004 |
1.3 |
Structural design for the lift and Hoist Shaft tower, check for the stability of the existing TCI building, produce the details execution steel drawings specifications and Tender Documents:
- Structural calculations for the lift and Hoist Shaft tower and its connection with the New Mixing Building
- Producing all the detailed engineering steel & concrete Drawings.
- Production of the Tender Documents and Technical Specification
|
Proctor & Gamble 6th of October Cairo- Egypt |
Egypt |
|
PSG and Buggy Floor capacity increase |
Built up and extension to the new buggy floor from W to E by 18m and from S to N by 45m for 3 floors including the drawing system |
2003 |
2003 |
2.2 |
Structural design for the building extension . Produce the details execution steel drawings, specifications and Tender Documents:
- Structural calculations for the New Extension and check the stability of the existing TCI building.
- Producing all the detailed engineering & concrete raft foundation Drawings and structure steel detailed drawing.
-Production of the Tender Documents and Technical Specification.
|
Proctor & Gamble |
Egypt |
|
New Mixing Packing Building Design Review |
Design review for the structure calculation and detailed drawing for the new mixing and packing building |
2000 |
2001 |
3 |
Review structural steel design for new mixing building and the packing building.
- Check the design parameters with the Egyptian code.
- Check and approval the detailed drawings.
-Carry out cross check for the design by built up 4 computer models on longitudinal and transversal frames to check results of the design.
|
Proctor & Gamble |
Egypt |
|
HSP Project |
Build up an Extension for the Existing conveyors and Tank farm |
1999 |
1999 |
2 |
- Structural design for the carrying system and modifications for the steel structure
- Structural design of the tank farm extension.
- Producing all the detailed engineering steel and concrete drawings
|
Proctor & Gamble 6th of October Cairo- Egypt |
Egypt |
|
Old Bar Soap Building Demolition |
Demolition of the existing bar soap building and making the necessary calculation checking for the stability and strengthening of the existing packing building before the demolition. |
2000 |
2000 |
1 |
Production of the Tender Documents, stability calculations and execution drawings (demolishing and strengthening of the steel structure) |
Proctor & Gamble 6th of October Cairo- Egypt |
Egypt |
|
Refurbishment of 11kV minimum oil switchgears and Panel Al Ain |
Refurbishment replacement of 19 Nos of main and ring substations, and 11kV switchgears at al Ain City. |
2002 |
2008 |
3 |
Preparation of tender Documents, evaluation of bids and site supervision |
Al-Ain Distribution Co. (AADC |
United Arab Emirates UAE |
|
Mixing Building Extension & Strengthening of the Existing Mixing Building |
Build up an Extension phase to the existing mixing building and carrying out all the required strengthening for the existing mixing building steel structure |
1999 |
1999 |
2.5 |
Structural design for the building extension structure check for the stability of the details execution steel drawings specifications and Tender Documents:
- Conducting the site survey for the existing mixing building.
- Structural calculations for the New Extension for the Mixing Building and check the stability of the existing plant.
- Producing all the detailed engineering steel & concrete Drawings.
- Production of the Tender Documents and Technical Specification
|
Proctor and Gamble |
Egypt |
|