English | العربي
Umm al Nar East Gas Turbine Power & Desalination Plant Extension
Description: Two gas turbines for 87 MW ISO rating each and 3x6/7.2 MIGPD desal. plants, 2 Waste Heat Recovery Boilers of 210 tons/hr each & 2 natural gas and liquid fuel fired auxiliary boilers of 160 t/hr. each.
Start Date: 1981
Complation Date: 1987
Cost: 214 million US $
Services Provided: Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction, Commissioning and guarantee period.
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved