Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
CONSULTANCY FOR EXPANSION OF THE NETWORK IN VARIOUS AREAS IN CENTRAL, EASTERN AND AL DHAFRA REGIONS - CONTRACT NO. D-108378 |
DESIGN OF WATER NETWORK
PIPELINE DIA 250 MM |
2019 |
2023 |
0 |
PDR – DDR – PREPARATION OF
TENDER DOCUMENTS AND
EVALUATION
-SITE SUPERVISION DURING
CONSTRUCTION PERIOD
-SITE SUPERVISION DURING
WARRANTY PERIOD |
ABU DHABI DISTRIBUTION COMPANY |
United Arab Emirates UAE |
|
CONSULTANCY SERVICES FOR REPLACEMENT OF EXISTING 5 NOS. 33/11 KV PRIMARY SUBSTATION IN SWEIHAN WITH NEW 5 NOS. 33/11KV PRIMARY SUBSTATIONS IN EASTERN REGION. CONTRACT NO. D-108364 |
CONSTRUCTION OF NEW 5 NOS.
33/11 KV PRY SUBSTATIONS WITH
ALL ASSOCIATED 33 KV AND 11 KV
CABLES.
DEMOLITION OF THE EXISTING 5
NOS. 33/11 KV PRY SUBSTATIONS. |
2019 |
2024 |
0 |
PDR – DDR – PREPARATION OF
TENDER DOCUMENTS AND
EVALUATION
SITE SUPERVISION DURING
CONSTRUCTION PERIOD
SITE SUPERVISION DURING
WARRANTY PERIOD |
ABU DHABI DISTRIBUTION COMPANY |
United Arab Emirates UAE |
No Image
|
Assuit West Cc Power Plant – Waste Water Study Problem |
Assuit West Cc Power Plant 8x125 Mw Gt + 4hrsg+ 2x250 Mw St Troubleshooting And Root Cause Analysis To Enable Restart Of Operation Including Environmental Permit Requirements |
2019 |
2020 |
1500 |
Study Of Injection Of Water In Gas Turbine To Improve Flue Gas Quality, Studying Salinity Values Of Well Water (Current Source Establish Whether Brine Recirculation Occurs When Discharged To The Ground, Studying Of Maximizing The Use Of Waste Water To The Discharge To Nile Canal Within Acceptance Limits To Environment, Suitability Of Ponds As Waste Water Drain And Evaporation Limits, Reducing Un Wanted Discharge Pollutants |
Egyptian Electricity Holding Co. |
Egypt |
|
DESK STUDY OF WASTEWATER EVAPORATION PONDS AT NEW CAPITAL POWER PLANT |
PROVIDING EVAPORATION ROLE ,
AERATION SYSTEM , POND
CLEANING |
2020 |
2022 |
0 |
REVIEW , FEASIBILITY STUDY ,
CONCEPT DESIGN , DETAILED
DESIGN , TENDER SPECIFICATION
, SUPERVISION |
EGYPTIAN ELECTRICITY HOLDING CO. |
Egypt |
|
CHECKING PF ELECTRIC ENERGY METERS AND WATER DISCHARGE METERS FOR AL REHAB CITY (1,2) CITIES |
CHECKING OF ELECTRIC ENERGY
METERS AND WATER DISCHARGE
METERS FOR AL REHAB 1,2 CITIES |
2020 |
2020 |
0 |
Review of Installation Correctness
and Function for Electric Models -
Preparing list for Finally Meters |
AL REHAB CITIES AUTHORITY |
Egypt |
|
STUDY OF KHAZAN EL BAREEDS ELECTRICAL FOOD ALREHAB 1 |
ELECTRIC LOAD CALCULATION BY
TWO PHYSICAL METHODS DUE TO
FAILURE OF ONE IMPORTANT
ELECTRIC METER
HYDRAULIC CALCULATIONS FOR
POTABLE WATER CONSUMPTIONS
MEASURING METERS
CONSIDERING EFFICIENCY OF
RESPECTIVE PUMPS |
2020 |
2020 |
0 |
ARAB COMPANY FOR
PROJECTS AND URBAN
DEVELOPMENT |
ARAB COMPANY FOR PROJECTS AND URBAN DEVELOPMENT |
Egypt |
|
CONSULTANCY SERVICES FOR SUPERVISION OF OPERATION & MAINTENANCE CONTRACT FOR MAIN RECYCLED WATER SYSTEM IN ABU DHABI AND ADJACENT ISLAND, ABU DHABI MAINLAND AL DHAFRA REGION INCLUDING SUPPORT SERVICES FOR MANAGEMENT OF NOC/PTW |
CONSULTANCY SERVICES FOR
SUPERVISION OF OPERATION &
MAINTENANCE CONTRACT FOR
MAIN RECYCLED WATER SYSTEM
IN ABU DHABI AND ADJACENT
ISLAND |
2020 |
2021 |
0 |
REVIEW DRAWINGS AND
CALCULATION - SUPERVISION OF
CONSTRUCTION - GARANTEE
PERIOD SERVICES |
ABU DHABI DISTRIBUTION COMPANY |
United Arab Emirates UAE |
|
FEWA TENDER: 157– W2019 – D.I TRANSMISSION PIPELINES & ASSOCIATED WORKS IN UAQ |
HYDRAULIC STEADY STATE &
SURGE ANALYSIS AND ANALYSIS
OF PIPELINE PROFILE |
2020 |
2020 |
0 |
HYDRAULIC STUDY
OPERATION & CONTROL
PHILOSOPHY
STRUCTURAL DESIGNS |
M/S LINDENBERG WATER & DRAINAGE |
United Arab Emirates UAE |
|
RO PLANT CAPACITY 45,000 M3/D AT SIR BANI YAS ISLAND ABU DHABI |
DESIGN OF ONSHORE SEAWATER
INTAKE AND OUTFALL
STRUCTURES , OFFSHORE
SEAWATER INTAKE TOWER,
ONSHORE OUTFALL PIPELINE (
Ø=1100MM) , OUTFALL WEIR ON
SHORELINE, AND ONSHORE &
OFFSHORE SEAWATER INTAKE
PIPELINES (2NOS Ø 900 MM AND
L≈≈300M) |
2020 |
2021 |
58 |
ORASCOM
CONSTRUCTION
INDUSTRIALS |
|
United Arab Emirates UAE |
|
CONSULTANCY SERVICES FOR HYDROGEOLOGICAL MAPPING, GEOPHYSICS, WELL DRILLING AND TESTING OF THE UNITED ARAB EMIRATES CONTRACT NO. PCD-CS-0387- EQS-WDS-5113040 |
DRAWING THE
HYDROGEOLOGICAL MAP OF ABU
DHABI WHICH IS A METHOD OF
GATHERING AND EVALUATING
GEOLOGICAL AND HYDROLOGICAL
INFORMATION TO CREATE A
THREE-DIMENSIONAL DEPICTION
OF THE SUBSURFACE MATERIAL IN
WHICH GROUND WATER OCCUR |
2020 |
2023 |
0 |
DRAWING THE HYDRAULIC MAP
OF ABU DHABI EMIRATE |
ENVIRONMENT AGENCY - ABU DHABI |
United Arab Emirates UAE |
|
Number of projects: 279
|