Sur Power and Desalination Plant |
4x35.4 MW ISO Rating Gas Turbine and 2 MIGPD desalination plant including sea water intake facilities. 4 MG water storage facility, blending, chemical conditioning, chlorination, civil works, pumping station with necessary piping system to join the plant with water system in Sur, and all necessary auxiliaries. |
1986 |
1986 |
65 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation (of nominated Tenderer by the Client), Post Contract duties including Supervision of Construction and Commissioning.
N.B.: The project activities have been with hold before preparation of Tender Document and after Engineering design which included submission of comparative study and outline design report which -in turn- have been discussed and approved with comments by the Client.
|
Water and Electricity Department, Abu Dhabi, End user: Ministry of Electricity and Water, Sultanate of Oman |
Sultanate Of Oman |
|
Ghubrah Power & Desalination Plant Unit Number 1 Retubing |
Replacement of Vesel Number 1 tube bundles for desalination unit number 1 |
1987 |
1987 |
4 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction & commissioning |
Ministry of Electricity & Water |
Sultanate Of Oman |
|
Umm Al-Nar East Extn, Water Storage and Town Water Pumping Station |
40 (4x10) MIG Water Storage Tanks, Town Water Pumping Station (4x3800 m3/h, 50m head pumps), Major modification of 5 trunk mains @900 mm each, All related, suction & delivery piping and trunk mains. |
1987 |
1991 |
20 |
Design, preparing Tender Documents, Tender Analysis, Post Contract Duties including supervision of construction, commissioning and guarantee period. |
Water and Electricity Department |
United Arab Emirates UAE |
|
Assuit Thermal Power Plant - 325 MW |
One 325 MW steam condensing turbine steam power plant and its associated dual fuel (Natural gas and fuel oil) power boiler(1085 t/hr) with auxiliaries and accessories. |
1988 |
1992 |
195 |
Post contract duties including supervision of construction and commissioning. |
Ministry of Electricity, Egyptian Electricity Authority. Egypt. |
Egypt |
|
Ghubrah Power and Desalination Plant Extension Phase-III |
1x30 MW Power (Back pressure extraction steam turbine with dump condenser) 1x230 t/hr H.P boiler, 1x 5/6 MIGPD desalination unit complete with auxiliaries, anciliaries, sea water intake and Civil Works |
1988 |
1993 |
177 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of construction, commissioning and guarantee period. |
Ministry of Electricity and Water, Sultanate of Oman |
Sultanate Of Oman |
|
Hurghada and Sharm El-Sheikh Power and Desalination Plants |
Two plants at Hurghada and Sharm El-Sheikh each comprising of:2x300 m3/day vapour compression desalination units,3x1.2 MW diesel generating sets.
|
1990 |
1991 |
6 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties (later changed to R.O. plant - see E.3). |
Abu Dhabi Tourist Investment Company |
Egypt |
|
Residential Complex for Assiut Power Station |
Residential Complex: flats, villas, club, mosque and clinic |
1990 |
1991 |
2 |
Engineering Design, Preparation of Tender Documents and Bids Evaluation |
Ministry of Electricity, Egyptian Electricity Authority |
Egypt |
|
Light Industries Plant |
Plant for manufacturing light products: bags, socks, and other light products |
1990 |
1991 |
1 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation and Supervision of Construction |
Egypt Light Industries Co., |
Egypt |
|
Desalination units for Oyoun Moussa and Zaafarana Power Stations |
Two desalination units for Oyoun Moussa and Zaafarana Power Stations on Suez Gulf each comprising of 2 x 1 MIGD MSF Desalination Units. |
1990 |
1990 |
5 |
Engineering Design, Preparation of Tender Documents and Bids Evaluation. The project was deleted due to financing problems. |
|
Egypt |
|
Assuit Thermal Power Plant Extension by 325 MW Unit-Phase-II |
One 325 MW steam condensing turbine steam power plant and its associated dual fuel (Natural gas and fuel oil) power boiler (1085 t/hr) with auxiliaries and accessories. |
1990 |
1997 |
250 |
Pre-contract negotiations and Post Contract duties including supervision of construction and commissioning. |
Ministry of Electricity, Egyptian Electricity Authority. Egypt. |
Egypt |
|
Number of projects: 279
|