English | العربي
Al-Taweelah "A" Gas Turbine Power and Desalination Plant - Steam Raising and Desalination Plant lot D
Description: Infra structure and site layout for 2500 to 3000 MWelectric power generation and 150 million gallons per day desalination plant in three phases complete with off shore and on shore sea water intake and outfall. 250, 800 and 1500 MW power for phases I, II and III respectively. Phase 1: 3 Gas Turbine Generating units for 117MW ISO rating each, 3 Desalination Plants 3x6/7.2 MIGPD, 3 EHR Boilers of 210 tons/hr, and 2x160 t/hr auxiliary boilers all 16 bar and 210C. Sea Water Intake & Outfall System alongwith its Civil & Building Works.
Start Date: 1982
Complation Date: 1992
Cost: 370 million US $
Services Provided: Feasibility study and infra structure Engineering Design, Preparation of Tender Documents, Bids Evaluaiton, Post Contract duties including supervision of Construction, Commissioning and guarantee period for 1st phase.
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved