Dry Stores, Cold Stores, and General Warehouses 3300 tons of cold storage, 15,000 tons dry storage, 16000 tons common storage and 21000 tons other storage. 1975 1975 28 Feasibility Study U.A.E. Development Bank United Arab Emirates UAE
Hydrochloric Acid, Caustic Soda, Chlorine & Salt Plant 160 tons/day Salt Plant, 80 tons/day Brine and Chlorine Cell Plant & 180 tons/day Caustic Soda 50% and H2 gas Plant, 65 tons/day Hcl Plant, 12 tons/day Sodium Hypochlorite Plant, Steel Drum Factory (400 drum/day x 150 kg capacity), Plastic Container Factory. Central workshop, utility house, boiler house, store, administration building, labor and medical services buildings. 1976 1978 75 Feasibility Study, Engineering Design, Preparation of Tender Documents and Bids Evaluation Abu Dhabi National Oil Company United Arab Emirates UAE
Benghazi Power & Desalination Plant, Lybia (Phase I and Phase II) Phase I and Phase II each: 3x40 MW condensing turbines + 20 MW BP turbine + 4x1.25 MIGD Desalination Plant 1976 1977 120 Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of construction and commissioning. Electricity Corporation of Benghazi, Libya Libya
Economical & Technical Studies Ten selected Power and Desalination plants. 1978 1979 0.4 Economical and Technical Studies of ten selected plants producing Electricity and Distillate Water. Saline Water Conversion Corporation (SWCC) Saudi Arabia Saudi Arabia
Ghubrah Power & Desalination Plant Extension, Sultanate of Oman, Phase I 5/6 MIGPD Desalination Plant 1980 1983 30 Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction, commissioning and guarantee period. Ministry of Electricity and Water, Sultanate of Oman Sultanate Of Oman
AL-TAWEELAH STEAM POWER & DESALINATION PLANT 2x160 MW extraction condensing type turbines, 2x625 tons/hr natural gas and liquid fuel fired reheat boilers at 126 bar and 510oC, 4x5/6 MIGPD desalination plant complete with water tanks and associated civil works. 1980 1981 520 Engineering Design, Preparation of Tender Documents, Bids Evaluation Water and Electricity Department, Abu Dhabi, UAE. United Arab Emirates UAE
Sea water cooling pumping plant Phase I and II - Shuaiba Phase I: 3x19500 m3/hr variable speed pumps + 5x18250 m3/hr fixed speed pumps + sea water chlorination plant + 11kv/380V substation + process computer and instrumentation system. Phase II: 4x10500 m3/hr variable speed pumps + 2x5MW diesel generators + 11KV substation. 1981 1988 90 Preliminary studies, Design of electrical, instrumentation and control systems pertaining to the work, preparation of Tender Documents, Tender Analysis, Post Contract duties including supervision of construction and commissioning. Shuaiba Area Authority, Kuwait Kuwait
Shuaiba Sea Water Cooling Pumping Plant Emergency Diesel Generating Plant system for Kuwait National Petroleum Co. Mina Abdulla Refinary Kuwait 2 x 5 MW 600 rpm diesel generating plant complete with MV switchgears for automatic change over from mains to emergency working of electric supply to 4 x 10500 m3/hr sea water cooling pumps, 11 KV/380 V. Substation, Instrumentation and Control Equipment, Civil and building works. 1981 1988 5.6 Study, Design, Preparation of Tender Documents, Tender Analysis, Post Contract duties including Supervision of Construction, Commissioning and guarantee period. Shuaiba Area Authority, Kuwait Kuwait
Gas Turbine Power Plant, Rusail 3 gas turbine generating units of 111.5 MW ISO rating each. 1981 1985 111 Engineering Design, Preparation of Tender Documents, Bids Evaluation (of nominated Tenderer by the Client), Post Contract duties including supervision of Construction and commissioning. Ministry of Electricity and Water, Sultanate of Oman. Sultanate Of Oman
Sitra Power & Desalination Plant Extension 35.4 MW ISO rating gas turbine & 5/6 MIGPD desalination. plant, one Waste Heat Recovery Boiler of 80 ton/hr and one dual firing aux. boiler of 160 ton/hr. Seawater intake of 15000m3/hr complete with settling basin, chemical treatment and hypochlorination plant. 1981 1985 55 Engineering Design, Preparation of Tender Documents, Bids Evaluation (of nominated Tenderer by the Client), Post Contract duties including Supervision of Construction and Commissioning. Water and Electricity Department, Abu Dhabi, End user: WED, Bahrain. Bahrain
Number of projects: 279