Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Dry Stores, Cold Stores, and General Warehouses |
3300 tons of cold storage, 15,000 tons dry storage, 16000 tons common storage and 21000 tons other storage. |
1975 |
1975 |
28 |
Feasibility Study |
U.A.E. Development Bank |
United Arab Emirates UAE |
|
Hydrochloric Acid, Caustic Soda, Chlorine & Salt Plant |
160 tons/day Salt Plant, 80 tons/day Brine and Chlorine Cell Plant & 180 tons/day Caustic Soda 50% and H2 gas Plant, 65 tons/day Hcl Plant, 12 tons/day Sodium Hypochlorite Plant, Steel Drum Factory (400 drum/day x 150 kg capacity), Plastic Container Factory. Central workshop, utility house, boiler house, store, administration building, labor and medical services buildings. |
1976 |
1978 |
75 |
Feasibility Study, Engineering Design, Preparation of Tender Documents and Bids Evaluation |
Abu Dhabi National Oil Company |
United Arab Emirates UAE |
|
Benghazi Power & Desalination Plant, Lybia (Phase I and Phase II) |
Phase I and Phase II each: 3x40 MW condensing turbines + 20 MW BP turbine + 4x1.25 MIGD Desalination Plant |
1976 |
1977 |
120 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of construction and commissioning. |
Electricity Corporation of Benghazi, Libya |
Libya |
|
Economical & Technical Studies |
Ten selected Power and Desalination plants. |
1978 |
1979 |
0.4 |
Economical and Technical Studies of ten selected plants producing Electricity and Distillate Water. |
Saline Water Conversion Corporation (SWCC) Saudi Arabia |
Saudi Arabia |
|
Ghubrah Power & Desalination Plant Extension, Sultanate of Oman, Phase I |
5/6 MIGPD Desalination Plant |
1980 |
1983 |
30 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction, commissioning and guarantee period. |
Ministry of Electricity and Water, Sultanate of Oman |
Sultanate Of Oman |
|
AL-TAWEELAH STEAM POWER & DESALINATION PLANT |
2x160 MW extraction condensing type turbines, 2x625 tons/hr natural gas and liquid fuel fired reheat boilers at 126 bar and 510oC, 4x5/6 MIGPD desalination plant complete with water tanks and associated civil works. |
1980 |
1981 |
520 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation |
Water and Electricity Department, Abu Dhabi, UAE. |
United Arab Emirates UAE |
|
Sea water cooling pumping plant Phase I and II - Shuaiba |
Phase I: 3x19500 m3/hr variable speed pumps + 5x18250 m3/hr fixed speed pumps + sea water chlorination plant + 11kv/380V substation + process computer and instrumentation system. Phase II: 4x10500 m3/hr variable speed pumps + 2x5MW diesel generators + 11KV substation.
|
1981 |
1988 |
90 |
Preliminary studies, Design of electrical, instrumentation and control systems pertaining to the work, preparation of Tender Documents, Tender Analysis, Post Contract duties including supervision of construction and commissioning. |
Shuaiba Area Authority, Kuwait |
Kuwait |
|
Shuaiba Sea Water Cooling Pumping Plant Emergency Diesel Generating Plant system for Kuwait National Petroleum Co. Mina Abdulla Refinary Kuwait |
2 x 5 MW 600 rpm diesel generating plant complete with MV switchgears for automatic change over from mains to emergency working of electric supply to 4 x 10500 m3/hr sea water cooling pumps, 11 KV/380 V. Substation, Instrumentation and Control Equipment, Civil and building works. |
1981 |
1988 |
5.6 |
Study, Design, Preparation of Tender Documents, Tender Analysis, Post Contract duties including Supervision of Construction, Commissioning and guarantee period. |
Shuaiba Area Authority, Kuwait |
Kuwait |
|
Gas Turbine Power Plant, Rusail |
3 gas turbine generating units of 111.5 MW ISO rating each. |
1981 |
1985 |
111 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation (of nominated Tenderer by the Client), Post Contract duties including supervision of Construction and commissioning. |
Ministry of Electricity and Water, Sultanate of Oman. |
Sultanate Of Oman |
|
Sitra Power & Desalination Plant Extension |
35.4 MW ISO rating gas turbine & 5/6 MIGPD desalination. plant, one Waste Heat Recovery Boiler of 80 ton/hr and one dual firing aux. boiler of 160 ton/hr. Seawater intake of 15000m3/hr complete with settling basin, chemical treatment and hypochlorination plant. |
1981 |
1985 |
55 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation (of nominated Tenderer by the Client), Post Contract duties including Supervision of Construction and Commissioning. |
Water and Electricity Department, Abu Dhabi, End user: WED, Bahrain. |
Bahrain |
|
Number of projects: 279
|