Marsa Alam Utilities – Phase I Utilities for Marsa Alam Development Phase-I includes the overall planning and implementation of the following networks for approx 6’000’000 m2 of tourist development area for 80 resorts including, Water Pumping Stations, Underground/Overground Storage Tanks, Sewage & Storm Water Network, Water Supply & Fire fighting Network, Irrigation Network, Solid Waste Scheme, Electrical Distribution Network, Telecommunications Networks,Utility Control Centre (UCC) 1999 2001 30 Planning of Utilities and Networks Concept Design ,Phasing Plans, and Cost Estimates Detailed Design & Tech Specifications Preparation of Complete Tender Documents based on detailed designs Evaluation of Tenders – for 5 years 2000 - 2005 EMAK Co. for Utilities, Egypt Egypt
Marsa Alam RO Desalination Plant Stage – 1 implementation of 5 phases till 2005 (4MIGD RO Plant) inclusive of all electro-mechanical & civil works & all auxiliaries. The first stage includes 2x500 + 2x1000m3/day units 1999 2000 7 Study, design, tender documents, bids, evaluation, and pre-contract negotiations EMAK Co. for Utilities, Egypt Egypt
Marsa Alam Diesel Power Station 4 x 3 MW Site rating diesel generating units operating with light and heavy fuel oil complete with all electrical, instrumentation, civil and building works.The plant is designed to be extendable up to 3 x 8 + 2 x 8MW diesel generating units 1999 2001 12 Study, Design, Preparation of Tender Documents, Bids Analysis and Pre-Contract negotiations. EMAK for Utilities and Services, Cairo Egypt Egypt
Midelec Power Station to Supply Midor Refinery with Power 2x5 MW standby diesel Engines for MIDELEC power station 1999 2001 10 Preparation of IPP Contract, Post Contract duties including Supervision of Construction, and Commissioning guarantee period Middle East Electricity Co. (MIDELEC) Egypt
New Mixing Packing Building Design Review Design review for the structure calculation and detailed drawing for the new mixing and packing building 2000 2001 3 Review structural steel design for new mixing building and the packing building. - Check the design parameters with the Egyptian code. - Check and approval the detailed drawings. -Carry out cross check for the design by built up 4 computer models on longitudinal and transversal frames to check results of the design. Proctor & Gamble Egypt
Old Bar Soap Building Demolition Demolition of the existing bar soap building and making the necessary calculation checking for the stability and strengthening of the existing packing building before the demolition. 2000 2000 1 Production of the Tender Documents, stability calculations and execution drawings (demolishing and strengthening of the steel structure) Proctor & Gamble 6th of October Cairo- Egypt Egypt
Garden lights in Capital Garden Installation of 149 Nos. decorative lighting poles with 2 lanterns, 20 Nos. poles with 150 W, 100 Ground spot lights of 100 W and 63 Nos. of suspended flood light 2000 2002 0.5 Engineering Design, preparing Tender Documents, Bids Evaluation, Post Contract Duties including supervision of construction and commissioning Abu Dhabi Municipality United Arab Emirates UAE
Pumping Stations for fodder farm in Wadi Al-Ryum Construction of the three new pumping stations from three reservoirs of well water to remote reservoirs feeding the fodder farm as follows:4x310m3/hr at 49m,4x300m3/hr at 21m,4x250m3/hr at 15m 2000 2004 3.9 Preparation of Design Report, Tender Documents, Bids evaluation, post contract duties including supervision of construction and commissioning Abu Dhabi Municipality UAE United Arab Emirates UAE
Khasab Diesel Power Station Extension Extension of Khasab Diesel Power Station with 7MW diesel generating unit, complete with all necessary electrical civil and building works. 2000 2001 6 Preparation of Design Report and Tender Documents Ministry of Electricity and Water Sultanate of Oman Sultanate Of Oman
Telemetry Bida Yamra Supply, Installation and Maintenance of Telemetry System for 200 Wells in Bidaa Yamra Area 2001 2002 2 Post-contract duties including supervision of construction and commissioning Abu Dhabi Municipality Chief of Agricultural Section United Arab Emirates UAE No Image