English | العربي
Remote Areas R.O. Desalination Plants at Al-Wagon, Al-Koo and Umm Al-Zumul
Description: Three Reverse Osmosis Desalination Plants utilizing brackish water from wells at three sites, each site comprise 2 units, 100,000 IGD each
Start Date: 1986
Complation Date: 1987
Cost: 10 million US $
Services Provided: Design, preparing Tender Documents, Tender analysis, Post Contract duties including Supervision of Construction and Commissioning. This project was canceled after the preparation of Tender Documents.
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved