Chlorination System & Associated Works in the Sharqiya Region |
Water Sterilization – Dis-infection by using Chlorine Dioxide in a Sharqiya Region for 20 water wells at 8 different location |
2004 |
2005 |
1.5 |
Design review & site supervision |
Ministry of Electricity and Water, Sultanate of Oman |
Sultanate Of Oman |
|
Upgrading of Mirfa, Madinat Zayed, Water Transmission Scheme |
DN 900mm pipeline (DI) from Mirfa to Madinate Zayed (70 km),Two pumps in existing pumping stations, MCC’s, Power and control tanks 2x2 MG,DN 900 pipeline (DI) room Madinate Zayed to Mazaira,2x6 MIG + 1x5 MIG concrete reservoirs,Investigation and conversion to VFD of existing motors,Automatic control system. |
2004 |
2009 |
75 |
Investigation, concept and detailed design, all surveys, tendering, site supervision and warranty follow up |
Abu Dhabi Water and Electricity Authority (ADWEA) |
United Arab Emirates UAE |
|
Ghayathi & Hamra Military Camp |
DN 600 mm pipeline (40 km) from DN 1600 mm pipeline, interconnection to filling station and network, DN 300 mm pipeline (3 km) from DN 1000 mm pipeline, all instructions and control, elevated tank 100,000 gallons x 30 m and associated control systems. |
2004 |
2007 |
11 |
Concept and preliminary design, detailed and tender documents, tendering, evaluation and award, construction supervision, warranty period filed supervision. |
Abu Dhabi Water and Electricity Authority (ADWEA) |
United Arab Emirates UAE |
|
Drilling 100 Wells, at Al Yahr – Al Ain |
Drilling 100 Wells, Dept. 1000 Ft. per Well with Casing and Screen for Full Depth at Al Yahr – Al Ain |
2004 |
2005 |
3.5 |
Post-contract duties including supervision of construction and commissioning |
Agriculture Dept. & Livestock, Al Ain – U.A.E. |
United Arab Emirates UAE |
|
Drilling 150 Wells, at Seih Al-Rahil - Al Ain City |
Drilling 70 Wells with Pumps inside Al Ain City |
2004 |
2005 |
4 |
Post-contract duties including supervision of construction and commissioning |
Agriculture Dept. & Livestock, Al Ain – U.A.E |
United Arab Emirates UAE |
|
Sur Containerized RO desalination plant |
A Containerized RO desalination plant of 1.0MGD (4500m3 /day) capacity at Sur,The RO plant is housed in several containers,The scope of work include all necessary requirement required such as: tanks, pumps, valves, external and internal pipes, deep well pumps, filtration system, pre and post chemical treatment, switchgear and electrical equipment, automatic control and protection system and civil works.
|
2004 |
2006 |
5 |
Post control services for the containerized RO desalination plant including design review of all Electro-mechanical and civil activities, site supervision, soil investigation, testing, commissioning, trail operation, handing over and guarantee of plant. |
Ministry of Housing, Electricity and Water, MHEW - Sultanate of Oman |
Sultanate Of Oman |
|
Sur Centralized desalination plant |
20 MIGD new centralized declination plant and water supply scheme,RO/ME-TVC desalination plant,MV/LV switchgear, Automatic control system including DCS, PLC, SCADA & data transmission networks, Building and civil activities
|
2004 |
2005 |
187 |
Feasibility study and cost estimation for different operation of desalination process, preparation design report and tender documents, construction supervision. |
Ministry of Housing, Electricity and Water, MHEW - Sultanate of Oman |
Sultanate Of Oman |
|
Construction of diesel power station at Saih Al- Kirat, Dofar |
All civil works for the construction of power station,Relocation of 8x1000 KM diesel generating units from Sur to Saih Al-Kirat
|
2004 |
2006 |
1 |
Preparation of tender documents, bids analysis and supervision of construction and erection. |
Ministry of Hosing, Electricity and Water, Sultanate of Oman |
Sultanate Of Oman |
|
Consultancy Services for Supply and Installation of Boom at Ghubrah Power and Desalination Plant |
Gather Geotechnical information like tide pattern, water current, wind velocity, depth of seabed from shore to shore at intake, find a permanent boom, prepare detail relevant drawings of boom |
2004 |
2005 |
0.4 |
Preparing Study Report and Prepare scope of work for bidding contractor |
Ministry of Housing Electricity and Water (MHEW) |
Sultanate Of Oman |
|
Upgrading of Mirfa-Madinat Zayed-Mazairah and Liwa Area, Water Transmission Scheme |
The transmission pipe line scope of work comprises construction of main transmissions for new DN 800mm CS (62.0km) from Mirfa Pump Station to Madinat Zayed Pump Station,Construction of new pump station at Mirfa (Lot c) which shall feed the new CS DN 800mm transmission pipeline total capacity 19.09 MIGD & total head 390m,Construction of new distribution pump station at Madinat Zayed which feed the existing DN 900mm to Madinat Zayed, Madinat Mohamed and new housing development total capacity 11.7. MIGD & total head 45m, Construction of four (4) concrete reservoirs at Madiant Zayed Pump Station with a capacity of 1.5MIG each complete with all incoming and outgoing pipe work, balance line, over flow, drains valves, fitting
|
2004 |
2011 |
75 |
Investigation, concept and detailed design, all surveys, tendering, site supervision and warranty follow up
|
TRANSCO |
United Arab Emirates UAE |
|
Number of projects: 279
|