Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Refurbishment of 132kV Substation Building |
Different concrete repair works with associated civil works,Air conditioning |
1999 |
2001 |
2.7 |
Bids evaluation and supervision of construction |
Water & Electricity Department |
United Arab Emirates UAE |
|
Reeva Substation, Assiut |
2x75 + 2x25 transformers 220/66/11kv - 4x220 + 6x66 + 8x11 kv overhead lines |
1999 |
2000 |
11.1 |
Post contract duties including site supervision and approval of designs |
Egyptian Electricity Authority, North Upper Egypt Zone |
Egypt |
|
Yemen Assessment of power and transmission |
Assessment of plant system, and operating history for Yemen whole technical transmission systems and all power generation plants. |
1999 |
1999 |
0 |
Data collection, visual assessments of representation equipment, assess plant system & operating history. |
Sargent & Lundy |
Yemen |
|
Marsa Alam Utilities – Phase I |
Utilities for Marsa Alam Development Phase-I includes the overall planning and implementation of the following networks for approx 6’000’000 m2 of tourist development area for 80 resorts including, Water Pumping Stations, Underground/Overground Storage Tanks, Sewage & Storm Water Network, Water Supply & Fire fighting Network, Irrigation Network, Solid Waste Scheme, Electrical Distribution Network, Telecommunications Networks,Utility Control Centre (UCC) |
1999 |
2001 |
30 |
Planning of Utilities and Networks Concept Design ,Phasing Plans, and Cost Estimates Detailed Design & Tech Specifications Preparation of Complete Tender Documents based on detailed designs Evaluation of Tenders – for 5 years 2000 - 2005 |
EMAK Co. for Utilities, Egypt |
Egypt |
|
Marsa Alam RO Desalination Plant |
Stage – 1 implementation of 5 phases till 2005 (4MIGD RO Plant) inclusive of all electro-mechanical & civil works & all auxiliaries. The first stage includes 2x500 + 2x1000m3/day units |
1999 |
2000 |
7 |
Study, design, tender documents, bids, evaluation, and pre-contract negotiations |
EMAK Co. for Utilities, Egypt |
Egypt |
|
Marsa Alam Diesel Power Station |
4 x 3 MW Site rating diesel generating units operating with light and heavy fuel oil complete with all electrical, instrumentation, civil and building works.The plant is designed to be extendable up to 3 x 8 + 2 x 8MW diesel generating units |
1999 |
2001 |
12 |
Study, Design, Preparation of Tender Documents, Bids Analysis and Pre-Contract negotiations. |
EMAK for Utilities and Services, Cairo Egypt |
Egypt |
|
Midelec Power Station to Supply Midor Refinery with Power |
2x5 MW standby diesel Engines for MIDELEC power station |
1999 |
2001 |
10 |
Preparation of IPP Contract, Post Contract duties including Supervision of Construction, and Commissioning guarantee period |
Middle East Electricity Co. (MIDELEC) |
Egypt |
|
Replacing High Capacity Water Chillers at Umm Al-Nar Plant |
Replacing high capacity water chillers as follows: 6 x 1030,000 kcal/hr centrifugal sea water cooled water chillers working with R 134a refrigerant, complete with chilled water pumps & piping. 2x126.72 kW air-cooled water chillers complete with chilled water pumps and piping. 3x141.9 kW air cooled water chillers complete with chilled water pumps and piping. 2x102kW split air conditioning units. |
1998 |
2003 |
3.5 |
Preparation of tender document’s, bids evaluation, site supervision including commissioning and guarantee period. |
Water & Electricity Department |
United Arab Emirates UAE |
|
Garden lights in Gardens of Corniche |
Replacement and redesign of the existing light system as well as rehabilitation of the lighting poles beside the street |
1998 |
1999 |
2.2 |
Engineering Design, preparing Tender Documents, Bids Evaluation, Post Contract Duties including supervision of construction and commissioning |
Abu Dhabi Municipality |
United Arab Emirates UAE |
|
Garden lights in Festival Area of Breakwater |
Installation of 258 Nos. decorative lighting poles with 3 lanterns, and 5 Nos. poles with 5 lanterns and 2 clock poles |
1998 |
1999 |
1.24 |
Engineering Design, preparing Tender Documents, Bids Evaluation, Post Contract Duties including supervision of construction and commissioning |
Abu Dhabi Municipality |
United Arab Emirates UAE |
|
Number of projects: 279
|