Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Construction and Maintenance of Landscaping Works around Three (3) No. Bridges at Abu Dhabi / Dubai Road |
construction and maintenance of 6 Nos. concrete water tanks 250.000 gallon with Landscaping works around the bridges at Dubai road
|
2004 |
2009 |
1 |
Engineering Design , Post Contract Duties including Supervision of construction , commissioning and guarantee periods
|
Abu Dhabi Municipality & Town Planning |
United Arab Emirates UAE |
No Image
|
Nubaria Power Station |
2x750 MW combined cycle power Plant |
2003 |
2006 |
700 |
Participation at design review and site supervision |
EEHC |
Egypt |
|
TCI Extension for Lang Building. |
Built up an extension for the TCI building to the north by 12m x 18m for 3 floors |
2003 |
2003 |
18 |
Structural design for the building extension structure Producing all the detailed drawings specifications and Tender Documents:
- Conducting the site survey for the existing new mixing building.
- Structural calculations for the New Extension for the Mixing Building and check the stability of the existing TCI building.
- Producing all the detailed drawings for concrete strap beams foundation and structure steel.
- Production of the Tender Documents and Technical Specification
|
Proctor & Gamble |
Egypt |
|
PSG and Buggy Floor capacity increase |
Built up and extension to the new buggy floor from W to E by 18m and from S to N by 45m for 3 floors including the drawing system |
2003 |
2003 |
2.2 |
Structural design for the building extension . Produce the details execution steel drawings, specifications and Tender Documents:
- Structural calculations for the New Extension and check the stability of the existing TCI building.
- Producing all the detailed engineering & concrete raft foundation Drawings and structure steel detailed drawing.
-Production of the Tender Documents and Technical Specification.
|
Proctor & Gamble |
Egypt |
|
Relocation of Desalination Units from Mirfa to Dalma |
Relocation of 2x1 MIGD TVC desalination units from Mirfa to Dalma |
2003 |
2005 |
15 |
Preparation of Tender Documents, Bids Evaluation, site supervision including guarantee period. |
Water and Electricity Department, Abu Dhabi, UAE. |
United Arab Emirates UAE |
|
Construction and Maintenance of Totalized Flow Valve Control for Local Farms in Taweelah, Bahia & Rahba |
Construction and Maintenance of Totalized Flow Valve Control for Local Farms in Taweelah, Bahia & Rahba – Abu Dhabi Emirate including construction, commissioning and guarantee of 2 pumping stations (3 x 135 m3 /hr) each and rehabilitation of one similar existing pumping station. |
2003 |
2005 |
1.9 |
Studies, Design, Preparation of Tender Documents, Tender Analysis, Post-contract duties including supervision of construction and commissioning, and guarantee period. |
Abu Dhabi Municipality |
United Arab Emirates UAE |
|
Drilling 100 Wells at Al Anja, Al Ain |
Drilling 100 Wells, Dept. 1000 Ft. per Well with Casing and Screen for Full Depth at Al Anja –Al Ain |
2003 |
2005 |
3.52 |
Post-contract duties including supervision of construction and commissioning |
Agriculture Dept. & Livestock, Al Ain – U.A.E. |
United Arab Emirates UAE |
|
Replacement of gas chlorination systems at various pumping station |
Installation of 48 Nos. sodium hypochlorite generation plants of different capacity in all of the pumping stations belongs to Abu Dhabi Water & Electricity Authority,Automatic control system for Hypochlorite generation including PLC, UDU and SCADA Systems.
|
2003 |
2007 |
55.2 |
Preparation of study and design report, tender documents, bids evaluation, site supervision, commissioning and supervision of guarantee. |
Abu Dhabi Water and Electricity Authority |
United Arab Emirates UAE |
|
Supply & Installation of 10 R.O. Desalination Units at Forest Area |
Supply & Installation of 10 R.O. Desalination Units at Forest Area |
2003 |
2003 |
0.66 |
Post-contract duties including supervision of construction and commissioning |
Abu Dhabi Municipality |
United Arab Emirates UAE |
|
Supply, Installation & Maintenance of 5 Nos. Reverse Osmosis Plants of 10,000 IG capacity in Western Region |
5 Nos. R.O. Plants in Wadi Al Ryum Station No. 7, Bainoona Camp, Wadi Al Ryum Camp No.1, Ghayathi Camp, and Bida Al Salam – Western Region of Abu Dhabi Emirate. |
2003 |
2006 |
1.35 |
Studies, Design, Preparation of Tender Documents, Tender Analysis, Post-contract duties including supervision of construction and commissioning, and guarantee period. |
Abu Dhabi Municipality |
United Arab Emirates UAE |
|
Number of projects: 279
|