Upgrading of Mirfa-Madinat Zayed-Mazairah and Liwa Area, Water Transmission Scheme
Description: The transmission pipe line scope of work comprises construction of main transmissions for new DN 800mm CS (62.0km) from Mirfa Pump Station to Madinat Zayed Pump Station,Construction of new pump station at Mirfa (Lot c) which shall feed the new CS DN 800mm transmission pipeline total capacity 19.09 MIGD & total head 390m,Construction of new distribution pump station at Madinat Zayed which feed the existing DN 900mm to Madinat Zayed, Madinat Mohamed and new housing development total capacity 11.7. MIGD & total head 45m, Construction of four (4) concrete reservoirs at Madiant Zayed Pump Station with a capacity of 1.5MIG each complete with all incoming and outgoing pipe work, balance line, over flow, drains valves, fitting
Start Date: 2004
Complation Date: 2011
Cost: 75 million US $
Services Provided: Investigation, concept and detailed design, all surveys, tendering, site supervision and warranty follow up
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved