English | العربي
Ghayathi & Hamra Military Camp
Description: DN 600 mm pipeline (40 km) from DN 1600 mm pipeline, interconnection to filling station and network, DN 300 mm pipeline (3 km) from DN 1000 mm pipeline, all instructions and control, elevated tank 100,000 gallons x 30 m and associated control systems.
Start Date: 2004
Complation Date: 2007
Cost: 11 million US $
Services Provided: Concept and preliminary design, detailed and tender documents, tendering, evaluation and award, construction supervision, warranty period filed supervision.
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved