Sur Desalination Plant(IWP) |
Planning for 30 MIGD Seawater RO Desalination Plant, Phase I Implemented - 15 MIGD SWRO (Reverse Osmosis), independent water project IWP, Seawater intake and outfall, Filtration system, Limestone building, RO building, Water storage Piping, all Civil steel structure building works, Concrete ground Tank(160000 m3) |
2006 |
2009 |
150 |
Concept BOQ, Structural detailed design for all the plant components including coordination with E/M works. |
Bahwan Engineering Company |
Sultanate Of Oman |
|
Reservoirs and Additional Works for the new R.O Plant at Al Yassat Island |
Supply, Installation, testing & Commissioning of SWRO Desalination Plant 2 M US Gallon/Day at Al Yasat Al Soghrih Island, utlizing fiber optic cables to be integrated in two submarine cables from sila to al yasat substations(2X33kv cables) for sub-sea part(LDC) |
2006 |
2007 |
10 |
Preliminary Design Report, Final Tender Document, Evaluation Report, Contract Document, Site Supervision |
Water & Electricity Department |
United Arab Emirates UAE |
|
Supply, installation, testing and commissioning of Sea Water R.O. Plant 2.0 MGD at Al Yassat Al Soghrih Island |
Sea Water Reverse Osmosis Plant of capacity 2.0 MGD in four (4) trains complete with pre and post treatment plant, Water storage tanks and interconnection with the existing plant, Electrical supply connection and switchgear system, Automatic control system with PLC Civil, building and foundation works |
2006 |
2007 |
18 |
Consultancy Services For Supply Installation, Testing & Commissioning Of SWRO Plant And Its Auxiliaries including Preparation Of Design Report And Tender Document Evaluation Report
Site Supervision |
Abu Dhabi Water and Electricity Authority (ADWEA) |
United Arab Emirates UAE |
|
Urgent Water Network Works in Mussafah, Khalifa B & Seih Sedera |
Design, Manufacturing, Supply, construction, laying, installation/erection, commissioning on site and relocation of DN 400 mm pipeline for HE Sheikh Bin Zayed
|
2006 |
2010 |
0.731 |
Preparation design report, tender documents, bids evaluation, post contract duties including site supervision of construction and commissioning
|
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
No Image
|
Replacement Of Gas Chlorination Systems By Sodium Hypochlorite At Various Pumping Station In Abu Dhabi Emirate Phase II |
Installation of 43 Nos. sodium hypochlorite generating plants of different capacity in all of the pumping stations belongs to Abu Dhabi Water & Electricity Authority
|
2006 |
2012 |
30 |
Preparation of study and design report, tender documents, bids evaluation, site supervision, commissioning and supervision of guarantee
|
Abu Dhabi Water & Electricity Department ADWEA |
United Arab Emirates UAE |
No Image
|
Extension of Al Hijj & Duqum Power Station |
Relocation of 1x3655 kw Diesel Generator Including all ancillaries and auxiliaries from Al-Kamil Power Station to Hijj Power Station
|
2005 |
2006 |
5 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction and commissioning
|
Rural Areas Electricity Co. |
Sultanate Of Oman |
No Image
|
Kureimat Combined Cycle Power Plant |
750 MW combined cycle 2 gas turbine + 1 steam turbine + 2 HRSG with all accessories |
2004 |
2007 |
700 |
Participation at design review and site supervision |
EEHC |
Egypt |
|
Lift and Hoist Shaft tower (+30.50) Floor Extension |
Built up hoist shaft tower of 40m light and extension for the floor at El (+30.50) |
2004 |
2004 |
1.3 |
Structural design for the lift and Hoist Shaft tower, check for the stability of the existing TCI building, produce the details execution steel drawings specifications and Tender Documents:
- Structural calculations for the lift and Hoist Shaft tower and its connection with the New Mixing Building
- Producing all the detailed engineering steel & concrete Drawings.
- Production of the Tender Documents and Technical Specification
|
Proctor & Gamble 6th of October Cairo- Egypt |
Egypt |
|
AbuTaraba Desalination Plant |
Plant Capacity 40.000 M3/D (3x13,340M3/D), 3x80 M3/Hr Aux. Boilers, Product Water Pipeline About 15 Km,All auxiliaries and ancillaries, 2x20,000 M3 water tanks, Automatic control system including DCS, PLC and data transmission. |
2004 |
2007 |
90 |
Review of design, supervision of erection until guarantee period. |
General Electric Co. of Libya. |
Libya |
|
Replacement Desalination plant 200m3/day at Sheesa Musandam Governorate |
RO plant 200m3/day,Drilling two wells,2 borehole pumps,Transmission pipeline,50m3/day water tank,HDPE brine discharge,Guard house,Power supply from grid to plant,Rehabilitation for existing jetty.
|
2004 |
2006 |
0.26 |
Design review and construction supervision |
Ministry of Electricity and Water, Sultanate of Oman |
Sultanate Of Oman |
|
Number of projects: 279
|