Upgrading of Mirfa, Madinat Zayed, Water Transmission Scheme
Description: DN 900mm pipeline (DI) from Mirfa to Madinate Zayed (70 km),Two pumps in existing pumping stations, MCC’s, Power and control tanks 2x2 MG,DN 900 pipeline (DI) room Madinate Zayed to Mazaira,2x6 MIG + 1x5 MIG concrete reservoirs,Investigation and conversion to VFD of existing motors,Automatic control system.
Start Date: 2004
Complation Date: 2009
Cost: 75 million US $
Services Provided: Investigation, concept and detailed design, all surveys, tendering, site supervision and warranty follow up