Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Marsa Alam Diesel Power Station |
4 x 3 MW Site rating diesel generating units operating with light and heavy fuel oil complete with all electrical, instrumentation, civil and building works.The plant is designed to be extendable up to 3 x 8 + 2 x 8MW diesel generating units |
1999 |
2001 |
12 |
Study, Design, Preparation of Tender Documents, Bids Analysis and Pre-Contract negotiations. |
EMAK for Utilities and Services, Cairo Egypt |
Egypt |
|
Identification and Installation of Intermittent Chlorination System and Sampling Points in Distribution Network |
Collecting Information Then Carrying Out Analyses On Existing System Using Water Quality Model and Proposes the Optimum Location Points to Install the Chlorine Dosing System in The Distribution Network |
2013 |
2017 |
12 |
Detailed Design, Feasibility Study, Study Report, Tender Document, Construction Management & Supervision |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
|
Reeva Substation, Assiut |
2x75 + 2x25 transformers 220/66/11kv - 4x220 + 6x66 + 8x11 kv overhead lines |
1999 |
2000 |
11.1 |
Post contract duties including site supervision and approval of designs |
Egyptian Electricity Authority, North Upper Egypt Zone |
Egypt |
|
Ghayathi & Hamra Military Camp |
DN 600 mm pipeline (40 km) from DN 1600 mm pipeline, interconnection to filling station and network, DN 300 mm pipeline (3 km) from DN 1000 mm pipeline, all instructions and control, elevated tank 100,000 gallons x 30 m and associated control systems. |
2004 |
2007 |
11 |
Concept and preliminary design, detailed and tender documents, tendering, evaluation and award, construction supervision, warranty period filed supervision. |
Abu Dhabi Water and Electricity Authority (ADWEA) |
United Arab Emirates UAE |
|
Consultancy Service For 11 kv Load Transfer To New E04/02 Pry, 132/11 kv At Abu Dhabi Island (Consultancy Agreement No. D-107130). |
Design Consultancy Services for 11 Kv Load Transfer to New E04/02 Pry, 132/11 Kv and Feasibility Study |
2018 |
2023 |
11 |
Data Collection or Inception Report (Stage Concept Design Development (Stage- Schematic Design (Stage-Iii), Detail Design Development (Stage – Iv), Tender Documents (Stage-V), Bidding & Tender Evaluation (Stage-Vi), Design Liaison Services During Project Construction (Stage-Vii) |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
|
Batha Power and Desalination Plant |
3 diesel engines 400 kw each.1500 extendable to 3x1500 m3/day TVC desalination units.Product water transmission line (30 km).Sea water intake and housing complex |
1996 |
1998 |
10 |
Design report, tender documents and bid evaluation |
Ministry of National Economy & Finance, Saudi Arabia |
Saudi Arabia |
|
Maintenance Facility Building and Concrete Repair Works for Umm al-Nar Power Plant |
Maintenance facility building,Different concrete repair works
|
1992 |
1994 |
10 |
Preparation of Tender Documents, Bids Evaluation and Construction Supervision |
Water & Electricity Department |
United Arab Emirates UAE |
|
Dahab RO Desalination Plants Dahab |
3x1200 m3/day RO Desalination Plant complete with beach wells, generators, civil works and auxiliaries. |
1997 |
1999 |
10 |
Technical and financial evaluation of 14 offers and assisting the Client in negotiation and contract awarding for Bot option.Post contract services including design review and attending site visits and test.
|
Dahab Co. For Tourism Development. |
Egypt |
|
Remote Areas R.O. Desalination Plants at Al-Wagon, Al-Koo and Umm Al-Zumul |
Three Reverse Osmosis Desalination Plants utilizing brackish water from wells at three sites, each site comprise 2 units, 100,000 IGD each |
1986 |
1987 |
10 |
Design, preparing Tender Documents, Tender analysis, Post Contract duties including Supervision of Construction and Commissioning. This project was canceled after the preparation of Tender Documents. |
Water and Electricity Department -Abu Dhabi |
United Arab Emirates UAE |
|
Midelec Power Station to Supply Midor Refinery with Power |
2x5 MW standby diesel Engines for MIDELEC power station |
1999 |
2001 |
10 |
Preparation of IPP Contract, Post Contract duties including Supervision of Construction, and Commissioning guarantee period |
Middle East Electricity Co. (MIDELEC) |
Egypt |
|
Number of projects: 279
|