Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Madinaty Data transmission between Meters and Main server |
Madinaty Data transmission between Meters and Main server |
2018 |
2019 |
0 |
Project Management, Technical Report |
Madinaty Electromechanical Power Company (MEPC) |
Egypt |
No Image
|
Consultancy Services For Upgrading Of Mina Pump Station At Sila. Under Ltra Frameworks Consultancy Contract No. D-10503/A-2 |
Construction of New Water Pumping Station and Related Structure. Construction of Water Storage Reservoirs. Supply And Installation Of New Pumps, Valves, Fittings, Meters,Etc.. |
2012 |
2018 |
0 |
Preliminary and Detailed Design, Tendering Services, Construction Management & Supervision, Guarantee Supervision |
Abu Dhabi Distribution Company |
0 |
No Image
|
Design Consultancy Services In Relation To Construction Of Agricultural Extension Centers In Abu Dhabi, Al Ain And Western Region (Contract No. Pd/Ca/Bps/Ok/R1320/P292-2016-Adafca/17/60) |
Design Consultancy Services for Construction of Eight (8) Farmers’ Services Centers at Various Locations to Promote a Higher Production Levels and Develop an Integrated & Sustainable Agricultural Environment. |
2017 |
2018 |
0 |
Data Collection Or Inception Report (Stage Concept Design Development (Stage- Schematic Design (Stage-Iii), Detail Design Development (Stage – Iv), Tender Documents (Stage-V) , Bidding & Tender Evaluation (Stage-Vi),Design Liaison Services During Project Construction (Stage-Vii) |
MUSANDAH |
United Arab Emirates UAE |
No Image
|
Repair of Cracked Concrete Structures at Sewage Treatment Plant at Port Fouad |
Repair of Cracked Concrete Structures at Sewage Treatment Plant at Port Fouad- Port Said |
2017 |
2017 |
0 |
Study Report, Design of Repair of Cracked Concrete Structures |
Water and Waste Water Company for Canal Provinces |
Egypt |
No Image
|
Approval Of New Led Bulbs (3 Brothers) To Replace The 400 W Sodium Bulbs On The 12 M Poles Of Madinaty Street Lighting |
The Save Electrical Energy , Madinaty Requires To Approve New Led Bulbs In The Sepal Fixtures Mounted On 12 M Poles Of Madinaty Street Lighting |
2017 |
2017 |
0 |
Bid Evaluation, Check & Assessment of 3b Sample Before and After Modifications, Checking The Certificates Provided by 3b and The Final Shape of Fixture, Factory Auditing |
Arab Company for Projects and Urban Development |
Egypt |
No Image
|
Technical Specifications of Led Lighting |
Required to Prepare the Specifications of Led Lighting |
2016 |
2016 |
0 |
Technical Report, Review of Current Specification, Data Collection, Civil Detailed Design |
Arab Company for Projects and Urban Development |
Egypt |
No Image
|
Engineering Services for Ra-100 Razeen Labour City |
Assess The Feasibility of Servicing the Potable Water Demands of Razeen Labour City Sector a Using Either of Two Pre–Selected Pipe Sizes for A Temporary Hdpe Water Main Connected to The Existing 900 Mm Dia. Water Main Feeding Al Wathba Palace, Located Approximately 3.5 Km to The North of the Development. |
2013 |
2016 |
0 |
Feasibility Study, Detailed Design, Planning, Forecast |
ADHC - Abu Dhabi Holding Company |
United Arab Emirates UAE |
No Image
|
Consultancy Services for Design Stability of Piping System in Pump Room - The Development of South Shamkha Infrastructure, Lot-1 (Cont No. 2011/61) - Pipe Stress Analysis |
Design Stability of Piping System in Pump Room - The Development Of South Shamkha Infrastructure, Lot-1 - Pipe Stress Analysis |
2014 |
2015 |
0 |
Hydraulic Studies (Steady State, Un-Steady State), Hydraulic Model, Detailed Design |
Federal Electricity & Water Authority FEWA |
United Arab Emirates UAE |
No Image
|
Consultancy Services for Supervision of Construction of Sea Water Pipeline Construction from Phase 3/Phase 1 Diversion Point and Extend Towards Phase 2 Settling Basin |
Consultancy Services for Supervision of Construction of Sea Water Pipeline Construction from Phase 3/Phase 1 Diversion Point and Extend Towards Phase 2 Settling Basin |
2013 |
2015 |
0 |
Site Supervision, Inspection and Site Visits |
Ghubrah Power & Desalination Company SAOC |
Sultanate Of Oman |
No Image
|
Number of projects: 279
|