Projects
Type:
Project Status:
Project Details:
Type Detail:
Project Name Description
Start Year
Finish year
Cost X106
Services Provided Client Country Image
Madinaty Data transmission between Meters and Main server Madinaty Data transmission between Meters and Main server 2018 2019 0 Project Management, Technical Report Madinaty Electromechanical Power Company (MEPC) Egypt No Image
Consultancy Services For Upgrading Of Mina Pump Station At Sila. Under Ltra Frameworks Consultancy Contract No. D-10503/A-2 Construction of New Water Pumping Station and Related Structure. Construction of Water Storage Reservoirs. Supply And Installation Of New Pumps, Valves, Fittings, Meters,Etc.. 2012 2018 0 Preliminary and Detailed Design, Tendering Services, Construction Management & Supervision, Guarantee Supervision Abu Dhabi Distribution Company 0 No Image
Design Consultancy Services In Relation To Construction Of Agricultural Extension Centers In Abu Dhabi, Al Ain And Western Region (Contract No. Pd/Ca/Bps/Ok/R1320/P292-2016-Adafca/17/60) Design Consultancy Services for Construction of Eight (8) Farmers’ Services Centers at Various Locations to Promote a Higher Production Levels and Develop an Integrated & Sustainable Agricultural Environment. 2017 2018 0 Data Collection Or Inception Report (Stage Concept Design Development (Stage- Schematic Design (Stage-Iii), Detail Design Development (Stage – Iv), Tender Documents (Stage-V) , Bidding & Tender Evaluation (Stage-Vi),Design Liaison Services During Project Construction (Stage-Vii) MUSANDAH United Arab Emirates UAE No Image
Repair of Cracked Concrete Structures at Sewage Treatment Plant at Port Fouad Repair of Cracked Concrete Structures at Sewage Treatment Plant at Port Fouad- Port Said 2017 2017 0 Study Report, Design of Repair of Cracked Concrete Structures Water and Waste Water Company for Canal Provinces Egypt No Image
Approval Of New Led Bulbs (3 Brothers) To Replace The 400 W Sodium Bulbs On The 12 M Poles Of Madinaty Street Lighting The Save Electrical Energy , Madinaty Requires To Approve New Led Bulbs In The Sepal Fixtures Mounted On 12 M Poles Of Madinaty Street Lighting 2017 2017 0 Bid Evaluation, Check & Assessment of 3b Sample Before and After Modifications, Checking The Certificates Provided by 3b and The Final Shape of Fixture, Factory Auditing Arab Company for Projects and Urban Development Egypt No Image
Technical Specifications of Led Lighting Required to Prepare the Specifications of Led Lighting 2016 2016 0 Technical Report, Review of Current Specification, Data Collection, Civil Detailed Design Arab Company for Projects and Urban Development Egypt No Image
Engineering Services for Ra-100 Razeen Labour City Assess The Feasibility of Servicing the Potable Water Demands of Razeen Labour City Sector a Using Either of Two Pre–Selected Pipe Sizes for A Temporary Hdpe Water Main Connected to The Existing 900 Mm Dia. Water Main Feeding Al Wathba Palace, Located Approximately 3.5 Km to The North of the Development. 2013 2016 0 Feasibility Study, Detailed Design, Planning, Forecast ADHC - Abu Dhabi Holding Company United Arab Emirates UAE No Image
Consultancy Services for Design Stability of Piping System in Pump Room - The Development of South Shamkha Infrastructure, Lot-1 (Cont No. 2011/61) - Pipe Stress Analysis Design Stability of Piping System in Pump Room - The Development Of South Shamkha Infrastructure, Lot-1 - Pipe Stress Analysis 2014 2015 0 Hydraulic Studies (Steady State, Un-Steady State), Hydraulic Model, Detailed Design Federal Electricity & Water Authority FEWA United Arab Emirates UAE No Image
Consultancy Services for Supervision of Construction of Sea Water Pipeline Construction from Phase 3/Phase 1 Diversion Point and Extend Towards Phase 2 Settling Basin Consultancy Services for Supervision of Construction of Sea Water Pipeline Construction from Phase 3/Phase 1 Diversion Point and Extend Towards Phase 2 Settling Basin 2013 2015 0 Site Supervision, Inspection and Site Visits Ghubrah Power & Desalination Company SAOC Sultanate Of Oman No Image
Number of projects: 279
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved