Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Extension of Al Hijj & Duqum Power Station |
Relocation of 1x3655 kw Diesel Generator Including all ancillaries and auxiliaries from Al-Kamil Power Station to Hijj Power Station
|
2005 |
2006 |
5 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction and commissioning
|
Rural Areas Electricity Co. |
Sultanate Of Oman |
No Image
|
General Technical and Financial Specification for Construction of open Advanced Metering Infrastructure ( Ami) , Management and Billing System |
Design and Installation, Testing, Operation and Warrantee Open Advanced Metering Infrastructure, Management and Billing System for Smart Water and Electric Meters for Madinaty Project |
2018 |
2023 |
5 |
Evaluation Report, Preparing Recommendation Report, Preparing Technical Specification for The Construction Of Open Advanced Metering Infrastructure, Management And Billing System, Preparing Terms Of Reference, Boq, Evaluation Received Offers, Reply To Clarification And Attending Clarification Meeting With Tenders, Assisting Madinaty To Award Contract To Successful Tenderer, Recommend The Successful Tenderer |
Arab Company for Projects and Urban Development |
Egypt |
|
Updating and Standardizing the Requirements for Smart Network and Metering System |
The Scope Include the Following -Smart Electric Meters Single 3 Phases
-Commutation Networks Complete Between Smart Meters and Scada System
-Complete Billing System and Remote Control of All Meters Via Gprs/ Rf / Fo Netw -K -Remote Control of Meter Tarff: Monitoring All Mv/Lv/ Network in Scada System
-Street Lighting (Option) Small Networks Using Le
-Operation and Maintenance for Two Years.
|
2016 |
2018 |
5 |
Data Collection, Tender Document, Prequalification Of Contractors, Analyzing Received Evaluation, Preparing Technical And Financial Reports Including Recommendation, Still Contractor Is Not Selected By MEPC |
Madinaty Electromechanical Power Company (MEPC) |
Egypt |
|
R.O. Desalination Plant, Al Ain Al Sokhna |
5x1000 m3/day RO Desalination Plant complete with beach wells, Standby diesel generators, civil works and auxiliaries. |
1997 |
1998 |
4.7 |
Bids evaluation, technically and financially |
Saudi Egyptian Co. For Investment and Development. |
Egypt |
|
Water Distribution Network to New Industrial City in Mussafah |
Construction of Water Distribution Network to Industrial City in Mussafah, including all connections and fittings required to supply water to industrial consumers. |
2002 |
2006 |
4.3 |
Preparation of design report, tender documents, bids evaluation, post contract duties including site supervision of construction and commissioning |
Abu Dhabi Water and Electricity Authority |
United Arab Emirates UAE |
|
Ghubrah Power & Desalination Plant Unit Number 1 Retubing |
Replacement of Vesel Number 1 tube bundles for desalination unit number 1 |
1987 |
1987 |
4 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction & commissioning |
Ministry of Electricity & Water |
Sultanate Of Oman |
|
Drilling 150 Wells, at Seih Al-Rahil - Al Ain City |
Drilling 70 Wells with Pumps inside Al Ain City |
2004 |
2005 |
4 |
Post-contract duties including supervision of construction and commissioning |
Agriculture Dept. & Livestock, Al Ain – U.A.E |
United Arab Emirates UAE |
|
Desalination of Ground Water In Madinaty |
Geophysical study(Electro potential & Exploratory Wells) to determine quantity & quality of ground water, well drilling, testing & drilling of productive wells including deep well pumps, water treatment including desalination of brackish water. |
2008 |
2011 |
4 |
Feasibility Study, Geophysical Survey, Project Management, Study Report, Concept Design, Prequalification of Contractors,Topographical Survey, Tender Document, Bid Evaluation, Assistance to Prepare Contract, Construction Supervision and Guarantee Follow up. |
Arab Company for Projects and Urban Development |
Egypt |
|
Technical Services for Well Survey and Design of Desalination Plant for Cairo Festival City Capacity 5000 M3/D |
Stage1: Wells Survey and Investigation. Stage2: Implement A Complete Design for 1 Unit Ro Desalination Plant of 5000 M3/D to Feed the Domestic Water for Cairo Festival City |
2015 |
2017 |
4 |
Site Survey, Soil Investigation, Study Report, Detailed Design, Tender Document, Bid Evaluation, Construction Management & Supervision, Planning, Forecast |
Al-Futtaim Group Real Estate LLC |
Egypt |
No Image
|
Pumping Stations for fodder farm in Wadi Al-Ryum |
Construction of the three new pumping stations from three reservoirs of well water to remote reservoirs feeding the fodder farm as follows:4x310m3/hr at 49m,4x300m3/hr at 21m,4x250m3/hr at 15m
|
2000 |
2004 |
3.9 |
Preparation of Design Report, Tender Documents, Bids evaluation, post contract duties including supervision of construction and commissioning |
Abu Dhabi Municipality UAE |
United Arab Emirates UAE |
|
Number of projects: 279
|