Identification and Installation of Intermittent Chlorination System and Sampling Points in Distribution Network |
|
Description: |
Collecting Information Then Carrying Out Analyses On Existing System Using Water Quality Model and Proposes the Optimum Location Points to Install the Chlorine Dosing System in The Distribution Network |
Start Date: |
2013 |
Complation Date: |
2017 |
Cost: |
12 million US $ |
Services Provided: |
Detailed Design, Feasibility Study, Study Report, Tender Document, Construction Management & Supervision |
|
|