English | العربي
Identification and Installation of Intermittent Chlorination System and Sampling Points in Distribution Network
Description: Collecting Information Then Carrying Out Analyses On Existing System Using Water Quality Model and Proposes the Optimum Location Points to Install the Chlorine Dosing System in The Distribution Network
Start Date: 2013
Complation Date: 2017
Cost: 12 million US $
Services Provided: Detailed Design, Feasibility Study, Study Report, Tender Document, Construction Management & Supervision
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved