Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Ras Laffan Power and Desalination Plant |
750 MW combined cycle gas turbine and steam power plant in dual mode with 40 MIGPD (MSF) and desalination plant |
1999 |
2001 |
730 |
Design, cost estimate, preparation of RFP and evaluation of IWP offers for the desalination units. |
Qatar General Petroleum, Corporation (QGPC) Qatar |
Qatar |
|
Kureimat Combined Cycle Power Plant |
750 MW combined cycle 2 gas turbine + 1 steam turbine + 2 HRSG with all accessories |
2004 |
2007 |
700 |
Participation at design review and site supervision |
EEHC |
Egypt |
|
Nubaria Power Station |
2x750 MW combined cycle power Plant |
2003 |
2006 |
700 |
Participation at design review and site supervision |
EEHC |
Egypt |
|
AL-TAWEELAH STEAM POWER & DESALINATION PLANT |
2x160 MW extraction condensing type turbines, 2x625 tons/hr natural gas and liquid fuel fired reheat boilers at 126 bar and 510oC, 4x5/6 MIGPD desalination plant complete with water tanks and associated civil works. |
1980 |
1981 |
520 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation |
Water and Electricity Department, Abu Dhabi, UAE. |
United Arab Emirates UAE |
|
Al Mirfa Power & Desalination Plant |
4x61 ISO MW gas turbines, 3 x 5.4 MIGPD MSF desalination units, 4x120 t/h EHR Boilers, 2x220 t/h auxiliary boilers dual fuel firing, H.V/M.V/L.V switchgears, All auxiliaries and ancillaries, All civil and building works, Sea water intake and cleaning equipment |
1991 |
1996 |
498 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract Duties including supervision of construction, commissioning and guarantee period. |
Water & Electricity Department, Abu Dhabi |
United Arab Emirates UAE |
|
Sharm El-Sheikh Power & Desalination Plant |
2 x 250MW ISO Gas Turbines.140MW Steam Back Pressure Turbine.5x5 MIGD MED-TVC.2xHRSG boilers in association with gas turbines
|
2001 |
2001 |
450 |
Preliminary Design Report + Economical and financial study for IPWP |
Egyptian Electricity Holding Co. Egypt. |
Egypt |
|
Sub Consultancy Services For Electricity Sector Rehabilitation And Improvement. |
Rehabilitation And Improvement For Three Power Plant - Electricity Sector -2 Mitsubishi Gas Turbine Each 2x250 Mw Gt +2hrsg +1x250 Mw St For Cairo North Power Station , Sidi Krir , Alatf Total 6 Gas Turbine Capacity 1500 Mw |
2018 |
2022 |
373 |
Tender Document, Bid Evaluation & Assistance To Prepare Contract For Sidi Krir & Al Atf Power Station, Construction Management For Cairo North & Sidi Kiri & Al Atf Power Station Three Major Gas Turbine Power Plants , Evaluation Report For Cairo North & Sidi Kiri & Al Atf Power Station. |
Egyptian Electricity Holding Co. |
Egypt |
|
Al-Taweelah "A" Gas Turbine Power and Desalination Plant - Steam Raising and Desalination Plant lot D |
Infra structure and site layout for 2500 to 3000 MWelectric power generation and 150 million gallons per day desalination plant in three phases complete with off shore and on shore sea water intake and outfall. 250, 800 and 1500 MW power for phases I, II and III respectively. Phase 1: 3 Gas Turbine Generating units for 117MW ISO rating each, 3 Desalination Plants 3x6/7.2 MIGPD, 3 EHR Boilers of 210 tons/hr, and 2x160 t/hr auxiliary boilers all 16 bar and 210C. Sea Water Intake & Outfall System alongwith its Civil & Building Works. |
1982 |
1992 |
370 |
Feasibility study and infra structure Engineering Design, Preparation of Tender Documents, Bids Evaluaiton, Post Contract duties including supervision of Construction, Commissioning and guarantee period for 1st phase. |
Water and Electricity Department - Abu Dhabi |
United Arab Emirates UAE |
|
Umm Al Nar West Power & Desalination Plant (Units 1 to 6) |
6x60 MW extraction condensing type turbines, 6x365 tons/hr natural gas and liquid fuel fired boilers at 60 bar and 480 C and 6x4 MIGPD desalination plant (In Two Phases) |
1973 |
1981 |
262 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including Supervision of Construction and Commissioning. |
Water and Electricity Department, Abu Dhabi |
United Arab Emirates UAE |
|
Assuit Thermal Power Plant Extension by 325 MW Unit-Phase-II |
One 325 MW steam condensing turbine steam power plant and its associated dual fuel (Natural gas and fuel oil) power boiler (1085 t/hr) with auxiliaries and accessories. |
1990 |
1997 |
250 |
Pre-contract negotiations and Post Contract duties including supervision of construction and commissioning. |
Ministry of Electricity, Egyptian Electricity Authority. Egypt. |
Egypt |
|
Number of projects: 279
|