Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Design of water treatment and desalination System For EL AIN EL SOKHNA Thermal Power Plant 2X650 MW |
Hypochlorite System Make Up Demineralization System Condensate Polisher System Tvc Desalination , Waste Water Treatment , Electrical And I&C . Liberates Equipment |
2009 |
2018 |
24 |
Design Review, Tender Document |
Orascom Construction Industrials |
Egypt |
|
Consultancy Services for Replacement of Existing Water Distribution Network in Mussafah Industrial Area of Eastern Region for Sectors M-9, M-10, M-11, M-12, M-13, M-14, M-15, M-16 & M-20 |
Replacement Of Existing Water Distribution Network In Mussafah Industrial Area Of Eastern Region For Sectors M-9, M-10, M-11, M-12, M-13, M-14, M-15, M-16 & M-20. The Anticipated Quantity Of Pipelines To Be Replaced Is Approximately 86km With All Associated Civil Works |
2014 |
2018 |
23 |
Study Report, Site Survey, Design Report, Tender Document, Bid Evaluation, Evaluation Report, Site Supervision |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
|
Ben Ban Ohtl (Solar Project) |
Transmission of The Solar Electric Power from The Solar Plots (39 Plots with Total Power of 1850 Mw) At Benban Area – Aswan – Upper Egypt Electricity Area to Their Located Step Up Substations (4 Nos) 22/22/220 Kv to Be Connected to The National Grid (220 Kv Level) At The Same Area. By Using Ohtl Instead of Cable Connection. |
2016 |
2016 |
23 |
PRELIMINARY EVALUATION OF OVERHEAD LINE POLES REQUIRED FROM PLOTS TO THE SUBSTATIONS,DETAILED DESIGN FOR CIVIL WORKS AND POLES , PLANNING , FORECAST |
EGEMAC - Egyptian German Electricity Manufacturing Company |
Egypt |
|
Consultancy Services For Upgrading Of Mina Pumping Station Of Sila In Western Region (Stage Iv, V, Contract Preparation And Head Office Support During Construction (Consultancy Agreement No. D-107446). |
Preparation Of Construction Contract Documents, Head Office Support, Site Supervision And Warranty Services For Upgrading Of Mina Pumping Station Of Sila In Western Region. |
2018 |
2021 |
21 |
Contractor Construction Contract Documents, Construction Supervision & Home Office Support, Consultancy Services During Warranty Period |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
|
INTRO GROUP - NCMP - CHP – PLANT |
10MW CHP GAS TURBINE
GENERATOR , HRSG AND
AUXILIARIES , CIVIL WORKS |
2021 |
2022 |
20 |
PREPARING DESIGN , TENDER
PREPARATION , EVALUATION OF
BIDDERS TILL AWARDING
CONTRACT FOR CHP PLANT
(INCLUDING GAS TIMELINE ) HEAT
RECOVERING STEAM
GENERATOR , BLACK START
DIESEL GENERATOR AND THEIR
AUXILIARIES
PAST CONTRACT WORK REVIEW
OF CONTRACTOR ,
SPECIFICATION AND DRAWING
SITE SUPERVISION , ATTENDING
LOCAL FACTORY , INSPECTION ,
COMMISSIONING , HANDING OVER
TO OWNER , PERFORMANCE
TEST , GUARANTEE , PREPARING
SPARE PARTS ACTIVITIES TILL
FINAL ACCEPTANCE TEST |
INTRO UTILITIES SAE |
Egypt |
|
Umm Al-Nar East Extn, Water Storage and Town Water Pumping Station |
40 (4x10) MIG Water Storage Tanks, Town Water Pumping Station (4x3800 m3/h, 50m head pumps), Major modification of 5 trunk mains @900 mm each, All related, suction & delivery piping and trunk mains. |
1987 |
1991 |
20 |
Design, preparing Tender Documents, Tender Analysis, Post Contract Duties including supervision of construction, commissioning and guarantee period. |
Water and Electricity Department |
United Arab Emirates UAE |
|
Consultancy Services for Relocation of Transco Water Transmission at SHM-6 |
Relocation of Transco Water Transmission at SHM-6 |
2014 |
2015 |
19.4 |
Hydraulic Studies (Steady State, Un-Steady State), Hydraulic Model |
Dongmyeong Engineering Consultants |
United Arab Emirates UAE |
|
TCI Extension for Lang Building. |
Built up an extension for the TCI building to the north by 12m x 18m for 3 floors |
2003 |
2003 |
18 |
Structural design for the building extension structure Producing all the detailed drawings specifications and Tender Documents:
- Conducting the site survey for the existing new mixing building.
- Structural calculations for the New Extension for the Mixing Building and check the stability of the existing TCI building.
- Producing all the detailed drawings for concrete strap beams foundation and structure steel.
- Production of the Tender Documents and Technical Specification
|
Proctor & Gamble |
Egypt |
|
Reinforcement of Dhahirah Region 132 kV Transmission System |
145 km of 132 kv OHTL.413 km of 33 kv OHTL.Extensions to four major substations.Relocation of 132/33 kv transformers
|
1994 |
1997 |
18 |
Engineering Design, Preparation of Tender Documents & Bids Evaluation. |
Ministry of Electricity and Water, Sultanate of Oman |
Sultanate Of Oman |
|
Supply, installation, testing and commissioning of Sea Water R.O. Plant 2.0 MGD at Al Yassat Al Soghrih Island |
Sea Water Reverse Osmosis Plant of capacity 2.0 MGD in four (4) trains complete with pre and post treatment plant, Water storage tanks and interconnection with the existing plant, Electrical supply connection and switchgear system, Automatic control system with PLC Civil, building and foundation works |
2006 |
2007 |
18 |
Consultancy Services For Supply Installation, Testing & Commissioning Of SWRO Plant And Its Auxiliaries including Preparation Of Design Report And Tender Document Evaluation Report
Site Supervision |
Abu Dhabi Water and Electricity Authority (ADWEA) |
United Arab Emirates UAE |
|
Number of projects: 279
|