Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Water Bulk Connection and Pipelines Diversions at Different Areas of Al Ain |
Supply and Installation of Water Bulk Connection and Pipelines Diversions & Construction, Erection of Reinforced Concrete Water Tanks/Grp at Different Area of Al Ain |
2015 |
2017 |
18 |
Project Management, Study Report, Concept Design, Tender Document, Bid Evaluation, Assistance To Prepare Contract, Construction Management & Supervision, Commissioning, Guarantee Supervision |
Al-Ain Distribution Co. AADC |
United Arab Emirates UAE |
No Image
|
Consultancy Services for Replacement of Existing Water Distribution Network in Abu Dhabi Island for Sectors E9_02, E10, E13 & W14_02 |
Consultancy Services for Replacement of Existing Water Distribution Network in Abu Dhabi Island for Sectors E9_02, E10, E13 & W14_02. The Anticipated Quantity of Pipelines to Be Replaced Is Approximately 39km with All Associated Civil Works |
2013 |
2018 |
16 |
Study Report, Site Survey, Design Report, Tender Document, Bid Evaluation, Evaluation Report, Site Supervision |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
|
CONSULTANCY SERVICES FOR DESIGN AND SUPERVISION OF INSTALLATION OF THIRD 500MVA TRANSFORMER AT AIRPORT HEIGHTS AND NEW 132KV UG CABLE CKT BETWEEN AIRPORT HEIGHTS GS AND GHALA GS. |
CONSULTANCY SERVICES FOR
DESIGN AND SUPERVISION OF
INSTALLATION OF THIRD 500MVA
TRANSFORMER AT AIRPORT
HEIGHTS AND NEW 132KV UG
CABLE CKT BETWEEN AIRPORT
HEIGHTS GS AND GHALA GS. |
2019 |
2023 |
15 |
DESIGN REPORT – DRAWINGS -
PRICE LIST – B.O.Q -
ENGINEERING WORKS – SITE
SUPERVISION |
OMAN ELECTRICITY TRANSMISSION CO. |
Sultanate Of Oman |
|
Repair and Refurbishment of Civil Works for Power Stations & Desalination Plants |
Refurbishment and repair of concrete and reinforced concrete mainly for distiller and turbine foundations, auxiliaries and ancillary concrete building structures deteriorated steel structural supports and damaged drain pipes,etc. |
1999 |
2001 |
15 |
Preparation of Tender Documents, Bids Evaluation and Construction Supervision |
Water and Electricity Department, Abu Dhabi, UAE |
United Arab Emirates UAE |
|
Relocation of Desalination Units from Mirfa to Dalma |
Relocation of 2x1 MIGD TVC desalination units from Mirfa to Dalma |
2003 |
2005 |
15 |
Preparation of Tender Documents, Bids Evaluation, site supervision including guarantee period. |
Water and Electricity Department, Abu Dhabi, UAE. |
United Arab Emirates UAE |
|
Saadiyat Desalination Plant |
480,000 IGPD Desalination Plant |
1974 |
1975 |
15 |
Feasibility Study, Engineering Design, Preparation of Tender Documents and Bids Evaluation |
Water and Electricity Department, Abu Dhabi |
United Arab Emirates UAE |
|
Design And Supervision Of 400 Kv Reactors |
Identifying the locations & installing (8)Nos 400kv shunt reactors and its associated equipment inside or in close proximity to 400kv SUR power station & 400kv IZKI grid stations. |
2015 |
2019 |
15 |
Basic design, Master Plan, Soil Investigation, Tender Document, Geo-Technical Report, Technical Report, Bid Evaluation, Commissioning, Site Supervision. |
Oman Electricity Transmission Company |
Sultanate Of Oman |
|
Epc For Construction Of New Power Station At Hallaniyat Island In Dhofar Governorate And Interlink Works Between New Power Station And Existing Distribution Network |
4 DIESEL UNITS X 1000KW 0.415KV – 2 DIESEL UNITS X 500KW 0.415KV – 4 STEP-UP
|
2013 |
2017 |
15 |
Assistance to Prepare Contract,Attending Manufactures Tests,Bid Evaluation,Concept Design,Construction Management & Supervision,Soil Investigation,Project Management,Study Report
|
Rural Areas Electricity Co. |
Sultanate Of Oman |
|
Smart Water Network for Madinaty Project |
Phase I: Data Transfer To Consortium To Prepare The Hydraulic Study For All Madinaty Phases .
-Detailed Engineering Of The System Including Scada System For Automatic Control, Prepare BOQ Of Main Equipment
Phase Ii : Preparing Planning Program Of Installation Of Equipment, Follow Up Installation, Testing, Of All Equipment Till Taking Over The Project.
|
2015 |
2018 |
14 |
Data Collection, Hydraulic Studies (Steady State, Un-Steady State), Review Of Current Specification, Site Supervision, Testing, Commissioning Till The Taking Over Of Project, Engineering By Consortium, Review Of BOQ, |
Arab Company for Projects and Urban Development |
Egypt |
|
Samalout Substation, Al-Menia |
375 MVA – 500/220/11kv transformer - 500 & 220 kv switchyard extension - 6 overhead lines 220 kv |
1996 |
1998 |
12.5 |
Post contract duties including site supervision and approval of designs |
Egyptian Electricity Authority, North Upper Egypt Zone |
Egypt |
|
Number of projects: 279
|