Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
TCI Extension for Lang Building. |
Built up an extension for the TCI building to the north by 12m x 18m for 3 floors |
2003 |
2003 |
18 |
Structural design for the building extension structure Producing all the detailed drawings specifications and Tender Documents:
- Conducting the site survey for the existing new mixing building.
- Structural calculations for the New Extension for the Mixing Building and check the stability of the existing TCI building.
- Producing all the detailed drawings for concrete strap beams foundation and structure steel.
- Production of the Tender Documents and Technical Specification
|
Proctor & Gamble |
Egypt |
|
PSG and Buggy Floor capacity increase |
Built up and extension to the new buggy floor from W to E by 18m and from S to N by 45m for 3 floors including the drawing system |
2003 |
2003 |
2.2 |
Structural design for the building extension . Produce the details execution steel drawings, specifications and Tender Documents:
- Structural calculations for the New Extension and check the stability of the existing TCI building.
- Producing all the detailed engineering & concrete raft foundation Drawings and structure steel detailed drawing.
-Production of the Tender Documents and Technical Specification.
|
Proctor & Gamble |
Egypt |
|
Relocation of Desalination Units from Mirfa to Dalma |
Relocation of 2x1 MIGD TVC desalination units from Mirfa to Dalma |
2003 |
2005 |
15 |
Preparation of Tender Documents, Bids Evaluation, site supervision including guarantee period. |
Water and Electricity Department, Abu Dhabi, UAE. |
United Arab Emirates UAE |
|
Construction and Maintenance of Totalized Flow Valve Control for Local Farms in Taweelah, Bahia & Rahba |
Construction and Maintenance of Totalized Flow Valve Control for Local Farms in Taweelah, Bahia & Rahba – Abu Dhabi Emirate including construction, commissioning and guarantee of 2 pumping stations (3 x 135 m3 /hr) each and rehabilitation of one similar existing pumping station. |
2003 |
2005 |
1.9 |
Studies, Design, Preparation of Tender Documents, Tender Analysis, Post-contract duties including supervision of construction and commissioning, and guarantee period. |
Abu Dhabi Municipality |
United Arab Emirates UAE |
|
Drilling 100 Wells at Al Anja, Al Ain |
Drilling 100 Wells, Dept. 1000 Ft. per Well with Casing and Screen for Full Depth at Al Anja –Al Ain |
2003 |
2005 |
3.52 |
Post-contract duties including supervision of construction and commissioning |
Agriculture Dept. & Livestock, Al Ain – U.A.E. |
United Arab Emirates UAE |
|
Replacement of gas chlorination systems at various pumping station |
Installation of 48 Nos. sodium hypochlorite generation plants of different capacity in all of the pumping stations belongs to Abu Dhabi Water & Electricity Authority,Automatic control system for Hypochlorite generation including PLC, UDU and SCADA Systems.
|
2003 |
2007 |
55.2 |
Preparation of study and design report, tender documents, bids evaluation, site supervision, commissioning and supervision of guarantee. |
Abu Dhabi Water and Electricity Authority |
United Arab Emirates UAE |
|
Supply & Installation of 10 R.O. Desalination Units at Forest Area |
Supply & Installation of 10 R.O. Desalination Units at Forest Area |
2003 |
2003 |
0.66 |
Post-contract duties including supervision of construction and commissioning |
Abu Dhabi Municipality |
United Arab Emirates UAE |
|
Supply, Installation & Maintenance of 5 Nos. Reverse Osmosis Plants of 10,000 IG capacity in Western Region |
5 Nos. R.O. Plants in Wadi Al Ryum Station No. 7, Bainoona Camp, Wadi Al Ryum Camp No.1, Ghayathi Camp, and Bida Al Salam – Western Region of Abu Dhabi Emirate. |
2003 |
2006 |
1.35 |
Studies, Design, Preparation of Tender Documents, Tender Analysis, Post-contract duties including supervision of construction and commissioning, and guarantee period. |
Abu Dhabi Municipality |
United Arab Emirates UAE |
|
Upgrading of Mirfa-Madinat Zayed-Mazairah and Liwa Area, Water Transmission Scheme |
The transmission pipe line scope of work comprises construction of main transmissions for new DN 800mm CS (62.0km) from Mirfa Pump Station to Madinat Zayed Pump Station,Construction of new pump station at Mirfa (Lot c) which shall feed the new CS DN 800mm transmission pipeline total capacity 19.09 MIGD & total head 390m,Construction of new distribution pump station at Madinat Zayed which feed the existing DN 900mm to Madinat Zayed, Madinat Mohamed and new housing development total capacity 11.7. MIGD & total head 45m, Construction of four (4) concrete reservoirs at Madiant Zayed Pump Station with a capacity of 1.5MIG each complete with all incoming and outgoing pipe work, balance line, over flow, drains valves, fitting
|
2004 |
2011 |
75 |
Investigation, concept and detailed design, all surveys, tendering, site supervision and warranty follow up
|
TRANSCO |
United Arab Emirates UAE |
|
Construction and Maintenance of Landscaping Works around Three (3) No. Bridges at Abu Dhabi / Dubai Road |
construction and maintenance of 6 Nos. concrete water tanks 250.000 gallon with Landscaping works around the bridges at Dubai road
|
2004 |
2009 |
1 |
Engineering Design , Post Contract Duties including Supervision of construction , commissioning and guarantee periods
|
Abu Dhabi Municipality & Town Planning |
United Arab Emirates UAE |
No Image
|
Number of projects: 279
|