Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Design & Supervision Services for Construction of Desalination Plant phase I in Wilayat Bukha |
Seawater RO Desalination Plant Two Streams each 500 m3/D Containerized Type including civil works such steel structure sun shed for "filters, wash pumps & feed pumps, size "20m x 8m x 9m", product water tank (1000m3), on Hill water tank (1000m3), raw water tank (200m3), switch gear building (23m x 26m), workship building, (8.5m x 8.8m), generator room (6m x 9m), pump house (6m x 9.5m), feed/ product & brine water networks, fencing, guard house (4.6m x 4m), internal & external paved road (l=6m*w=6m), car parking shed (8 Nos.)
|
2008 |
2011 |
5 |
Design Report, Tender Document, Evaluation Report, Contract Document, Site Supervision
|
Ministry Of Housing Electricity And Water MHEW |
Sultanate Of Oman |
No Image
|
Desalination of Ground Water In Madinaty |
Geophysical study(Electro potential & Exploratory Wells) to determine quantity & quality of ground water, well drilling, testing & drilling of productive wells including deep well pumps, water treatment including desalination of brackish water. |
2008 |
2011 |
4 |
Feasibility Study, Geophysical Survey, Project Management, Study Report, Concept Design, Prequalification of Contractors,Topographical Survey, Tender Document, Bid Evaluation, Assistance to Prepare Contract, Construction Supervision and Guarantee Follow up. |
Arab Company for Projects and Urban Development |
Egypt |
|
Manazel : Al Reef Down Town Infrastructure |
Corridors / Reservations for Down Town Infrastructure Package for Water & Fire Fighting, Sewage, Storm Water, Electrical, Telecom, Roads and Irrigation Networks and Traffic Management Study & Parking Requirments for Roads Networks
|
2009 |
2011 |
50 |
Master Plan, Study Report, Concept Design, Detailed Design
|
Al Nasr Company |
United Arab Emirates UAE |
|
Frame work Consultancy for Engineering Services to Carry out Construction & Reinforcement of Distribution 33/11 kv Network(D-8827) |
Frame work Consultancy for Engineering Services to Carry out Construction & Reinforcement of Distribution 33/11 kv Electrical Network in Abu Dhabi Island
|
2009 |
2013 |
6.45 |
Project Management, Concept Design, Topographical Survey, Tender Document, Bid Evaluation, Assistance to Prepare Contract, Construction Management & Supervision, Design Review, Guarantee Supervision
|
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
No Image
|
Design of water treatment and desalination System For EL AIN EL SOKHNA Thermal Power Plant 2X650 MW |
Hypochlorite System Make Up Demineralization System Condensate Polisher System Tvc Desalination , Waste Water Treatment , Electrical And I&C . Liberates Equipment |
2009 |
2018 |
24 |
Design Review, Tender Document |
Orascom Construction Industrials |
Egypt |
|
water distribution networks for 200MM CS Jabel Hafeet Pipeline |
Laying Approximately 10.5 Km Of 1xdn 200mm Cs Grade 60 Transmission Pipeline Including Surge Analysis Study Of The Pumping Systems From Jabel Hafeet Base Pumping Station To Summit Pumping Station, Laying Suitably Sized, Secured Supply Pipeline Around 3 Km Of 150mm Cs From Summit Reservoir To Feed The Hh Presidents Palace With Provision For Hotel And Cafeteria And Future Tap-Off, Laying Of Fiber Optic Cable Between Base And Summit Pumping Station. |
2009 |
2016 |
25 |
Project Management, Concept Design, Detailed Design, Tender Document, Bid Evaluation, Assistance to Prepare Contract, Construction Management & Supervision |
Abu Dhabi Water & Electricity Department ADWEA |
United Arab Emirates UAE |
No Image
|
The first egyptian Nuclear power plant (NPPA) |
4 X 1000 MW Nuclear Power Plants |
2009 |
2022 |
8000 |
TBD |
Egyptian Nuclear Power Plants Authority |
Egypt |
|
Ltra- Framework Consultancy Services For Improvement / Reinforcement, Extension And Development Of Water Distribution Networks In Western Region, Abu Dhabi |
Framework Consultancy Services For Improvement/Reinforcement, Extension And Development Of Water Distribution Networks In Western Region, Abu Dhabi |
2010 |
2016 |
60.1 |
Master Plan,Review Of Current Specification,Site Survey,Topographical Survey ,Soil Investigation,Study Report,Basic Design,Detailed Design,Tender Document,Bid Evaluation,Construction Management & Supervision,Guarantee Supervision |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
|
Richards Bay Desalination Plant 100,000 M3/Day IPWP |
RO Desalination with Diesel power Plant 30 MW |
2010 |
2012 |
200 |
Design, Preparing tender document, Tender analysis, Post contract duties, including design review site supervision of construction and commissioning |
HKS Group |
South Africa |
|
RO Desalination Plant of 25000 M3/D at hurghada |
Design Review & Supervision of Two Seawater RO Desalination Plant at Hurghada of Capacity 5 MIGD SWRO 20,000 M3/D + 5000 M3/D |
2010 |
2012 |
55 |
Bid Evaluation, Assistance to Prepare Contract, Construction Management & Supervision, Design Review, Attending Manufactures Tests, Commissioning |
National Orgnization for Potable Water And Sanitary Drainage(NOPWASD) |
Egypt |
|
Number of projects: 279
|