English | العربي
Replacement of gas chlorination systems at various pumping station
Description: Installation of 48 Nos. sodium hypochlorite generation plants of different capacity in all of the pumping stations belongs to Abu Dhabi Water & Electricity Authority,Automatic control system for Hypochlorite generation including PLC, UDU and SCADA Systems.
Start Date: 2003
Complation Date: 2007
Cost: 55.2 million US $
Services Provided: Preparation of study and design report, tender documents, bids evaluation, site supervision, commissioning and supervision of guarantee.
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved