English | العربي
Construction and Maintenance of Totalized Flow Valve Control for Local Farms in Taweelah, Bahia & Rahba
Description: Construction and Maintenance of Totalized Flow Valve Control for Local Farms in Taweelah, Bahia & Rahba – Abu Dhabi Emirate including construction, commissioning and guarantee of 2 pumping stations (3 x 135 m3 /hr) each and rehabilitation of one similar existing pumping station.
Start Date: 2003
Complation Date: 2005
Cost: 1.9 million US $
Services Provided: Studies, Design, Preparation of Tender Documents, Tender Analysis, Post-contract duties including supervision of construction and commissioning, and guarantee period.
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved