English | العربي
PSG and Buggy Floor capacity increase
Description: Built up and extension to the new buggy floor from W to E by 18m and from S to N by 45m for 3 floors including the drawing system
Start Date: 2003
Complation Date: 2003
Cost: 2.2 million US $
Services Provided: Structural design for the building extension . Produce the details execution steel drawings, specifications and Tender Documents: - Structural calculations for the New Extension and check the stability of the existing TCI building. - Producing all the detailed engineering & concrete raft foundation Drawings and structure steel detailed drawing. -Production of the Tender Documents and Technical Specification.
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved