Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Consultancy Services for Relocation of Transco Water Transmission at SHM-6 |
Relocation of Transco Water Transmission at SHM-6 |
2014 |
2015 |
19.4 |
Hydraulic Studies (Steady State, Un-Steady State), Hydraulic Model |
Dongmyeong Engineering Consultants |
United Arab Emirates UAE |
|
Consultancy Services for Design Stability of Piping System in Pump Room - The Development of South Shamkha Infrastructure, Lot-1 (Cont No. 2011/61) - Pipe Stress Analysis |
Design Stability of Piping System in Pump Room - The Development Of South Shamkha Infrastructure, Lot-1 - Pipe Stress Analysis |
2014 |
2015 |
0 |
Hydraulic Studies (Steady State, Un-Steady State), Hydraulic Model, Detailed Design |
Federal Electricity & Water Authority FEWA |
United Arab Emirates UAE |
No Image
|
Design of Training Center and Mosque at P&G s New Plant |
Prepare and Carrying Out the Construction Design Package Design Calculation, Detailed Drawings, Bill of Quantities and Specifications For The Landscaping and Layout of the External Works and All Architectural Design |
2014 |
2015 |
1.2 |
Detailed Design, Topographical Survey |
PROCTER and GAMBLE |
Egypt |
No Image
|
Transmission Pipeline Within City and Industrial Area – Ajman |
Transmission Pipeline Within City and Industrial Area – Ajman |
2014 |
2015 |
0.5 |
Hydraulic Studies (Steady State, Un-Steady State), Hydraulic Model |
Federal Electricity & Water Authority FEWA |
United Arab Emirates UAE |
No Image
|
Technical Evaluation Report About Advanced Meter Infrastructure (Ami) For Madinaty Project. |
Review The Technical Submission of Supplier (Golden Power & Having Co.) And Evaluation the Preliminary Offer Against International Standard. |
2014 |
2015 |
0.5 |
Evaluation Report, Data Collection, Review of Current Specification |
Madinaty Electromechanical Power Company (MEPC) |
Egypt |
No Image
|
Consultancy Services for Providing Staff for Projects Department Related Activities |
Providing Staff for Projects Department Related Activities |
2015 |
2019 |
140 |
Providing Staff for Projects Department Related Activities |
Oman Electricity Transmission Co. |
Sultanate Of Oman |
|
Smart Water Network for Madinaty Project |
Phase I: Data Transfer To Consortium To Prepare The Hydraulic Study For All Madinaty Phases .
-Detailed Engineering Of The System Including Scada System For Automatic Control, Prepare BOQ Of Main Equipment
Phase Ii : Preparing Planning Program Of Installation Of Equipment, Follow Up Installation, Testing, Of All Equipment Till Taking Over The Project.
|
2015 |
2018 |
14 |
Data Collection, Hydraulic Studies (Steady State, Un-Steady State), Review Of Current Specification, Site Supervision, Testing, Commissioning Till The Taking Over Of Project, Engineering By Consortium, Review Of BOQ, |
Arab Company for Projects and Urban Development |
Egypt |
|
Water Bulk Connection and Pipelines Diversions at Different Areas of Al Ain |
Supply and Installation of Water Bulk Connection and Pipelines Diversions & Construction, Erection of Reinforced Concrete Water Tanks/Grp at Different Area of Al Ain |
2015 |
2017 |
18 |
Project Management, Study Report, Concept Design, Tender Document, Bid Evaluation, Assistance To Prepare Contract, Construction Management & Supervision, Commissioning, Guarantee Supervision |
Al-Ain Distribution Co. AADC |
United Arab Emirates UAE |
No Image
|
Technical Services for Well Survey and Design of Desalination Plant for Cairo Festival City Capacity 5000 M3/D |
Stage1: Wells Survey and Investigation. Stage2: Implement A Complete Design for 1 Unit Ro Desalination Plant of 5000 M3/D to Feed the Domestic Water for Cairo Festival City |
2015 |
2017 |
4 |
Site Survey, Soil Investigation, Study Report, Detailed Design, Tender Document, Bid Evaluation, Construction Management & Supervision, Planning, Forecast |
Al-Futtaim Group Real Estate LLC |
Egypt |
No Image
|
Rehabilitation of Unused Groundwater Well Fields in The Eastern & Western Regions – Abu Dhabi Emirate |
Evaluate and Rehabilitate the Condition of Existing Groundwater Wellfields in The Eastern and Western Regions of Abu Dhabi Emirate. In Order to Be Used for Supplying Potable Water During Emergency Situations In Four Wellfields (Kashona Wellfield, Eastern Region - Bu Hasa Wellfield, Western Region – Bedaaghanem Wellfield, Western Region – Mesheaal Wellfield, Western Region) |
2015 |
2017 |
2.6 |
Site Survey, Review of Current Specification, Soil Investigation, Geo-Technical Report, Study Report, Project Management, Site Supervision |
Environment Agency - Abu Dhabi |
United Arab Emirates UAE |
No Image
|
Number of projects: 279
|