Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Study The Technical Data of 3 Phase Electric Meter by Manas |
Checking The Technical Inspection Data Prepared by “National Institute for Standard"
- Submit Technical Report About the Study of 3 Phase Meter
|
2015 |
2015 |
55 |
Test Of Accuracy ,Test Of Electrical Recommendation ,Test Of Insulation ,Conclusion And Recommendation, Disturbance Of Long Duration |
Madinaty Electromechanical Power Company (MEPC) |
Egypt |
No Image
|
Technical and Financial Evaluation to Extend Life Time of Midelec Power Station Turbines (LTE) |
Technical and Financial Evaluation of Siemens Co Offer to Extend A Life Time Gt11 & Gt21 Turbines(LTE) |
2015 |
2015 |
43 |
Life Time Extension Report (LTE) |
MIDELEC |
Egypt |
|
Economical Study for Installing a New Natural Gas Fired Engine in Sadat City in Egypt |
Economical Analysis Is to Compare Cost of Electricity Purchased Over Two Years to Gas Engine Capital Cost and Operating Costs for The Same Period |
2015 |
2015 |
32 |
Study Report, Feasibility Study |
Uniboard Al Mohtaheda Paper & Board |
Egypt |
|
Calculations of Energy Cost Saving by Using Led Lighting |
ETG Company – Represented by Eng. Islam Gabr – Offered The Calculation of Energy Cost Saving by Replacing the Traditional Lighting by Led Lighting |
2015 |
2015 |
1 |
Revise The Calculations Made by Etg for Saving of Electrical Energy by Using Led Lighting the Financial Include Fixer Cost of Aperatnity |
Arab Company for Projects and Urban Development |
Egypt |
No Image
|
Concrete Testing and Structural Integrity to Mv&Lv Switchgear Room Building at Elsokhna Power Plant |
Suez Golf Power Plant at Km 52 Suez City Ain Soukhna Structural Integrity Report |
2015 |
2015 |
0.3 |
Soil Investigation, Structural Integrity Report |
Powertek Energy SDN BHD |
Egypt |
No Image
|
Consultancy Services For Design And Tendering Services For Load Shifting To Mobellah Grid Station – B |
Design, prepare tender documents and drawing for 33KV cable feeders and necessary 33kv SF6 breakers for utilizing the existing 33kv cables, etc to shifting the load to New Mobellah Grid Station.
|
2015 |
2015 |
0.2 |
Site Survey,Technical Report,Tender Document,Bid Evaluation |
MUSCAT ELECTRICITY DISTRIBUTION COMPANY |
Sultanate Of Oman |
No Image
|
Consultancy Services For Design And Tendering Services For Load Shifting To Ghala Grid Station |
Design, Prepare Tender Documents And Drawing For 33kv Cable Feeders And Necessary 33kv Sf6 Breakers For Utilizing The Existing 33kv Cables To Shift The Existing 33kv Load From The Bausher And Airport Heights Grid Station To The Newly Proposed Ghala Grid Station
|
2015 |
2015 |
0.2 |
Site Survey,Technical Report,Tender Document,Bid Evaluation |
MUSCAT ELECTRICITY DISTRIBUTION COMPANY |
Sultanate Of Oman |
No Image
|
Design And Supervision Of 400 Kv Reactors |
Identifying the locations & installing (8)Nos 400kv shunt reactors and its associated equipment inside or in close proximity to 400kv SUR power station & 400kv IZKI grid stations. |
2015 |
2019 |
15 |
Basic design, Master Plan, Soil Investigation, Tender Document, Geo-Technical Report, Technical Report, Bid Evaluation, Commissioning, Site Supervision. |
Oman Electricity Transmission Company |
Sultanate Of Oman |
|
Consultancy Services For Design And Supervision Of Upgrading Bureimi Industrial To 220kv And Adding Third & Fourth 125 Mva Transformers 132/33kv, Adding Third & Fourth 125 Mva Transformers 132/33kv At Sfz And Upgrading Khaborah To 220kv |
Upgrading Bureimi to 220KV and adding third & forth 125MVA transformers 132/33KV, Adding third & Fourth 132/33KV 125 MVA transformers at Sohar Free Zone SFZ, Upgrading Khaborah to 220KV, Route survey and construction of LILO to the new proposed 220KV upgraded grid stations Bureimi industrial (from the double circuit OHTL between U.A.E & Mahdhah) and Khaborah (from the double circuit OHTL between SIS and MIS). |
2015 |
2019 |
100 |
Site Survey,Advisory Activity,Soil Investigation,Study Report,Basic Design,Master Plan,Design Report,Tender Document,Bid Evaluation,Construction Management & Supervision |
OETC |
Sultanate Of Oman |
|
Consultancy Services for Water Supply to Coastal Areas of Radeem, Harmiya and Shweihat (Consultancy Agreement No. D-106791. |
Consultancy Services for Construction of New Pipelines of Approximately 74 Km with All Associated Valves, Fittings, Flow Meters, Control Valves and Equipment for Smp and Bmu at The Coastal Areas of Radeem, Harmiya and Shweihat. |
2016 |
2020 |
6 |
Investigation, Studies , Design (Pdr), Detailed Design , Technical Submission for Tender Documents, Final Contractor s Tender Documents, Tendering, Evaluation , Awarding, -Construction Supervision, Field Supervision During Warranty Period |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
|
Number of projects: 279
|