English | العربي
Transmission Pipeline Within City and Industrial Area – Ajman
Description: Transmission Pipeline Within City and Industrial Area – Ajman
Start Date: 2014
Complation Date: 2015
Cost: 0.5 million US $
Services Provided: Hydraulic Studies (Steady State, Un-Steady State), Hydraulic Model
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved