English | العربي
Design of Training Center and Mosque at P&G s New Plant
Description: Prepare and Carrying Out the Construction Design Package Design Calculation, Detailed Drawings, Bill of Quantities and Specifications For The Landscaping and Layout of the External Works and All Architectural Design
Start Date: 2014
Complation Date: 2015
Cost: 1.2 million US $
Services Provided: Detailed Design, Topographical Survey
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved