Design of Training Center and Mosque at P&G s New Plant |
|
Description: |
Prepare and Carrying Out the Construction Design Package Design Calculation, Detailed Drawings, Bill of Quantities and Specifications For The Landscaping and Layout of the External Works and All Architectural Design |
Start Date: |
2014 |
Complation Date: |
2015 |
Cost: |
1.2 million US $ |
Services Provided: |
Detailed Design, Topographical Survey |
|
|