Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Consultancy Service for Replacement/Reinforcement of Prms Phase 1, In Central Region of Abu Dhabi (Consultancy Agreement No. D-107307). |
Consultancy Services for Replacement of Existing Water Distribution Network of Approximately 29 Km with All Associated Civil Work for Prm’s in Central Region. |
2018 |
2023 |
0 |
Studies, Review, Of Existing PDR and DDR and Prepare New DDR and Tender Documents, Preparation of Draft and Final Contractor’s Tender Document (Including Drawings, BQQ, Specifications, And Technical Data Etc.), Assistance During Contractors’ Tendering Period Including Analysis and Evaluation Reports, And Preparation of Final Contract Documents, Site Supervision Services During Construction Period Site Supervision Services During Warranty Period |
ABU DHABI DISTRIBUTION COMPANY |
United Arab Emirates UAE |
|
Consultancy Services for Supply and Installation of Valve Actuators On Selected System Valves in Abu Dhabi Island (Consultancy Agreement D-106742). |
Consultancy Services For Design And Site Supervision For Providing Monitoring & Control Facilities For Selected Isolation Valves In The Abu Dhabi Central Region Distribution Network. |
2018 |
2023 |
0 |
Studies, Surveys, Detailed Design Report, And Contractor’s Tender Document, Assistance During The Contractors Tendering Period Including Submission Of Analysis And Evaluation Reports And Preparation Of Final Contract Documents For The Works, Site Supervision Services During The Construction Period, Field Supervision During Warranty Period. |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
|
Sub Consultancy Services For Electricity Sector Rehabilitation And Improvement. |
Rehabilitation And Improvement For Three Power Plant - Electricity Sector -2 Mitsubishi Gas Turbine Each 2x250 Mw Gt +2hrsg +1x250 Mw St For Cairo North Power Station , Sidi Krir , Alatf Total 6 Gas Turbine Capacity 1500 Mw |
2018 |
2022 |
373 |
Tender Document, Bid Evaluation & Assistance To Prepare Contract For Sidi Krir & Al Atf Power Station, Construction Management For Cairo North & Sidi Kiri & Al Atf Power Station Three Major Gas Turbine Power Plants , Evaluation Report For Cairo North & Sidi Kiri & Al Atf Power Station. |
Egyptian Electricity Holding Co. |
Egypt |
|
Consultancy Services For Upgrading Of Mina Pumping Station Of Sila In Western Region (Stage Iv, V, Contract Preparation And Head Office Support During Construction (Consultancy Agreement No. D-107446). |
Preparation Of Construction Contract Documents, Head Office Support, Site Supervision And Warranty Services For Upgrading Of Mina Pumping Station Of Sila In Western Region. |
2018 |
2021 |
21 |
Contractor Construction Contract Documents, Construction Supervision & Home Office Support, Consultancy Services During Warranty Period |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
|
SWRO Plant of 1000 M3/D for Reef Oasis |
SWRO Plant of 1000 M3/D for Reef Oasis |
2018 |
2019 |
2 |
Project Management, Tender Document, Evaluation Report, Site Visit |
Global for Tourism Development |
Egypt |
|
Supply & Installation of Existing Distribution Networks Partially From Al Dhairah, Al Wagan, And Upgrade Of Um Al Zamool R.O. Plant |
Carrying Out Engineering Services For The Project Of "Supply And Installation Of Existing Distribution Networks (Partially) From Al Dhairah – Al Wagan, And Upgrade Of Um Al Zamool R.O. Plant, These Engineering Services Shall Include Design & Review Of Various Engineering Disciplines. |
2018 |
2019 |
0 |
Carrying Out Engineering Services for The Project of "Supply and Installation of Existing Distribution |
Al-Ain Distribution Co. AADC |
United Arab Emirates UAE |
|
Consultancy Services For Design, Supervision And Obtain All Needed Approvals For Civil Maintenance Of Muscat Grid Stations, Construction Of Two Outdoor Gantrys Compound Wall |
CONSULTANCY SERVICES FOR DESIGN , SUPERVISION AND OBTAIN ALL NEEDED APPROVALS FOR CIVIL MAINTENANCE OF MUSCAT GRID STATIONS , CONSTRUCTION OF TWO OUTDOOR GANTRYS COMPOUND WALL |
2018 |
2019 |
0 |
Repair, Redesign And Supervision For Mct Gridstation Structure, Design And Supervision Of Two Outdoor Of Civil Works Including Concrete Repair And Civil Work For Muscat Gridstation |
Oman Electricity Transmission Co. |
Sultanate Of Oman |
|
Madinaty Data transmission between Meters and Main server |
Madinaty Data transmission between Meters and Main server |
2018 |
2019 |
0 |
Project Management, Technical Report |
Madinaty Electromechanical Power Company (MEPC) |
Egypt |
No Image
|
Zohr Development Project |
Supervision and Coordination Site Staff |
2018 |
2018 |
2 |
Commissioning, Evaluation Report, Technical Report, Inspection And Site Visits ,Analyzing Received Evaluation ,Preparing Technical And Financial Reports Including Recommendation ,Check Compliance With Egyptian Standard ,Check The Function To Monitor And Control If Consumption ,Testing, Commissioning Till The Taking Over Of Project ,Review Technical Data Sheet, Checking Availability To Integrate With Exiting Meters ,Preparing Recommendation Report. |
SAPESCO |
Egypt |
No Image
|
Zohr Development Project |
Steam Blowing Scope Of Zohr Development Project Is Gas Producing Plant, Including Review Of Subcontractor Preparation Submittals Ready For Contract Time Schedule, Technical Drawing, Calculation Of Different Lengths And Pipes And Review Pipes Support, Review Of Design Work, Site Supervision And Review Subcontractor During Execution Of Steam Blowing At Site |
2018 |
2018 |
2 |
Technical Report, Tender Document, Bid Evaluation, Prequalification Of Contractors, Assistance To Prepare Contract, Construction Management & Supervision, Design Review, Design Report, Advisory Activity, Attending Manufactures Tests, Basic Design, Commissioning, Guarantee Supervision, Evaluation Report, Site Supervision |
SAPESCO |
Egypt |
No Image
|
Number of projects: 279
|