Projects
Type:
Project Status:
Project Details:
Type Detail:
Project Name Description
Start Year
Finish year
Cost X106
Services Provided Client Country Image
Technical Evaluation of Al Yosr Plant and Preparing Tender for Operation and Maintenance Preparing Technical Evaluation Report Including Intake and A Tender for Operation and Maintenance Including Budget Evaluation 2018 2018 1 Site Visit, Technical Evaluation, Operation and Maintenance Tender, Budget Cost Estimation for One Year Including Study Submitted Offers by Contractors, Preparing Technical Evaluation Report Including Scoring for Technical Evaluation, Draft Recommendation to Owner, Financial Study Report, Preparing Final Recommendation Report National Organization for Potable Water and Sanitary Drainage(NOPWASD) Egypt No Image
DESIGN CONSULTANCY SERVICES FOR DESIGN AND SUPERVISION OF PERMANENT 22 KV FEEDING ARRANGEMENT FOR WEST YAS D- ESIGN REVIEW FOR CABLING WORKS I.E. LAYING OF 22 KV CABLES. 2019 2019 0 - Design Review - Site Supervision SWITCHGEAR ELECTROMECHANICAL United Arab Emirates UAE
INSTALLATION OF 800 MM DIA DI PIPE – DESIGN OF LINE ANCHOR SUPPORTS ELOCATION OF TRANSCO DN 800 MM AND STRUCTURAL DESIGN 2019 2019 0 ENGINEERING WORK FOR RELOCATION OF TRANSCO WATER DN MM WATER LINE SAABA CORPORATION F.Z.E United Arab Emirates UAE No Image
RESIDENTIAL COMPOUND OF 38 VILLAS, KHALIFA CITY – ABU DHABI – SUPERVISION CONTRACT AGREEMENT DESIGN OF WATER NETWORK FOR 38 VILLAS AT KHALIFA CITY 2019 2019 0 DESIGN SITE SUPERVISION M/S LINDENBERG WATER & DRAINAGE United Arab Emirates UAE
CONSULTANCY SERVICES FOR DESIGN AND SUPERVISION OF INSTALLATION OF THIRD 500MVA TRANSFORMER AT AIRPORT HEIGHTS AND NEW 132KV UG CABLE CKT BETWEEN AIRPORT HEIGHTS GS AND GHALA GS. CONSULTANCY SERVICES FOR DESIGN AND SUPERVISION OF INSTALLATION OF THIRD 500MVA TRANSFORMER AT AIRPORT HEIGHTS AND NEW 132KV UG CABLE CKT BETWEEN AIRPORT HEIGHTS GS AND GHALA GS. 2019 2023 15 DESIGN REPORT – DRAWINGS - PRICE LIST – B.O.Q - ENGINEERING WORKS – SITE SUPERVISION OMAN ELECTRICITY TRANSMISSION CO. Sultanate Of Oman
CONSULTANCY SERVICES FOR SAIH AL KHAIRAT GS ALONG WITH OVERHEAD LINE FROM THUMRAIT GS TO SAIH AL KHAIRAT 125MVA, 132/33KV GRID STATION ALONG WITH OHTL. 2019 2022 7 DESIGN - TENDERING EVALUATION REPORT - DESIGN REVIEW - CONSTRUCTION SUPERVISION - GUARANTEE PERIOD OMAN ELECTRICITY TRANSMISSION CO. Sultanate Of Oman
SUPPLY, INSTALLATION, MAINTENANCE AND GUARANTEE FOR SMART PREPAID METERS, BILLING AND MANAGEMENT SYSTEM. STATE OF ART TECHNOLOGIES,APPLICATION AND SOLUTIONS FOR THE DESIGN, SUPPLY, INSTALLATION, ALL WIRING AND CABLE CONNECTIONS, TESTING, COMMUNICATION AND WARRANTEE OF A COMPLETE OPEN ADVANCE METERING INFRASTRUCTURE (AMI), MANAGEMENT AND BILLING SYSTEM FOR MADINATY SMART METERING NETWORK INCLUDING PREPAID ELECTRIC AND WATER METERS. THE AMI, MANAGING AND BILLING SYSTEMS SHALL BE AN OPEN SYSTEM TO INTEGRATE WITH DIFFERENT TYPES OF STANDARD PREPAID METERS, USING STANDARD PROTOCOL TO COMMUNICATE ACCURATELY WITH BILLING AND VENDING SYSTEM EQUIPMENT. 2019 2021 70 GENERAL MANAGEMENT OF THE PROJECT DURING THE CONTRACT PERIOD INCLUDING THE GUARANTEE PERIOD FOR TWO YEARS. - REVIEW OF THE DETAILED DESIGN DRAWINGS AND SPECIFICATIONS SUBMITTED BY CONTRACTOR (ELSWEDY INTELLIGENCE) VIA MEPC. - REVIEW THE TIME SCHEDULE OF PROJECT TO MATCH WITH CONTRACT PERIOD (SUPPLY, INSTALLATION, MAINTENANCE AND GUARANTEE). - FOLLOW UP THE INSTALLATION, TESTING, COMMISSIONING AND GUARANTEE OF SMART NETWORK FOR BILLING AND MANAGING SYSTEM BY THE FOLLOWING METHODS. - SITE SUPERVISION BY ONE OF OUR QUALIFIED ENGINEERS FOR INSTALLATION, TESTING AND COMMISSIONING OF MAIN CONTROL MANAGEMENT AND BILLING SYSTEM SUBJECT TO CONTRACTOR TIME SCHEDULE. - SUITABLE NUMBER OF VISITS TO FOLLOW UP INSTALLATION, CONNECTION OF SMART METERS WITHIN THE TELECOMMUNICATION NETWORK SUBJECT TO CONTRACTOR TIME SCHEDULE. - EXPERT IN TELECOMMUNICATION NETWORK FOR ONE VISIT PER MONTH TO EVALUATE AND FOLLOW Up THE INTEGRATION WITH THE EXISTING PREPAID METERS AND NEW MANAGEMENT AND BILLING SYSTEM SUBJECT TO CONTRACTOR TIME SCHEDULE. - PREPARING A MONTHLY REPORT TO MEPC REGARDING PROGRESS OF ACTIVITIES IN ACCORDANCE OF APPROVED TIME SCHEDULE AND ACTUAL PROGRESS OF WORKS - CHECKING AND REVIEWING OF CONTRACTOR HANDING OVER CERTIFICATE (H.O.C) AND GUARANTEE PERIOD FOR TWO YEARS. - CHECKING, REVIEWING AND SIGNING CONTRACTOR INVOICES SUBJECT TO ACTUAL PROGRESS AS PER APPROVED TIME SCHEDULE MADINATY ELECTROMECHANICAL POWER COMPANY (MEPC) Egypt
NEW ASSUIT COMBINED CYCLE ENGINEERING WORKS FOR WASTE WATER DISCHARGE ENGINEERING WORKS FOR WASTEWATER DISCHARGE INCLUDING BLOWDOWN PUMPS/ PIPING RO PROJECTS, BRINE PIPING DEEP WELL PUMPS, RECHARGE, PUMPS, PROTECTION WORKS AND CIVIL ENGINEERING PIPING WORKS 2019 2020 1500 1-DATA VERIFICATION AND REVIEW 2-DEVIEW OF PUMPS/ PIPING WITH CALCULATION OF THE HYDRAULIC GRADIENT AND RECOMMENDATION 3-DESIGN OF PUMPS CONCRETE PEDESTAL AND STEEL BASEPLATE & ANCHORING BOLTS. 4-ENGINEERING OF I&C WORKS INCLUDING P&ID REQUIRED FOR WASTE WATER AND DEEP WELL DISCHARGE TO MIXING POND, MIXED WASTEWATER TO RECHARGING WELLS AND THEIR CORRESPODING CONTROL ORASCOM CONSTRUCTION INDUSTRIALS Egypt
MADINATY STUDY AND RECOMMENDATION OF BEST PRACTICAL SOLUTION FOR THE EXISTING ROUTER REVIEW THE LOCATIONS OF ANTENNAE FOR REPAIR AND UPGRADE OF THE EXISTING SOFTWARE AND REGARDING V1 TO IMPROVE THE COMMUNICATION WITH THE MAIN SERVER IN MADINATY BY USING “SUPERCOM “ OR UPGRADING EXISTING SOFTWARE 2019 2020 0 REVIEW OF DESIGN , EVALUATION TALAAT MOUSTAFA GROUP (TMG ) Egypt
CONSULTANCY SERVICES FOR 11 KV LOAD TRANSFER TO NEW EXTENSION AT EB11 PRY1 IN BANIYAS ER – CONTRACT NO. D-108373 CABLING WORKS ONLY I.E. LAYING OF NEW 11 KV CABLES 2019 2022 0 PDR – DDR – PREPARATION OF TENDER DOCUMENTS AND EVALUATION -SITE SUPERVISION DURING CONSTRUCTION PERIOD -SITE SUPERVISION DURING WARRANTY PERIOD ABU DHABI DISTRIBUTION COMPANY United Arab Emirates UAE
Number of projects: 279
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved