Technical Evaluation of Al Yosr Plant and Preparing Tender for Operation and Maintenance |
Preparing Technical Evaluation Report Including Intake and A Tender for Operation and Maintenance Including Budget Evaluation |
2018 |
2018 |
1 |
Site Visit, Technical Evaluation, Operation and Maintenance Tender, Budget Cost Estimation for One Year Including Study Submitted Offers by Contractors, Preparing Technical Evaluation Report Including Scoring for Technical Evaluation, Draft Recommendation to Owner, Financial Study Report, Preparing Final Recommendation Report |
National Organization for Potable Water and Sanitary Drainage(NOPWASD) |
Egypt |
No Image
|
DESIGN CONSULTANCY SERVICES FOR DESIGN AND SUPERVISION OF PERMANENT 22 KV FEEDING ARRANGEMENT FOR WEST YAS |
D- ESIGN REVIEW FOR CABLING
WORKS I.E. LAYING OF 22 KV
CABLES. |
2019 |
2019 |
0 |
- Design Review
- Site Supervision |
SWITCHGEAR ELECTROMECHANICAL |
United Arab Emirates UAE |
|
INSTALLATION OF 800 MM DIA DI PIPE – DESIGN OF LINE ANCHOR SUPPORTS |
ELOCATION OF TRANSCO DN 800
MM AND STRUCTURAL DESIGN |
2019 |
2019 |
0 |
ENGINEERING WORK FOR
RELOCATION OF TRANSCO
WATER DN MM WATER LINE |
SAABA CORPORATION F.Z.E |
United Arab Emirates UAE |
No Image
|
RESIDENTIAL COMPOUND OF 38 VILLAS, KHALIFA CITY – ABU DHABI – SUPERVISION CONTRACT AGREEMENT |
DESIGN OF WATER NETWORK FOR
38 VILLAS AT KHALIFA CITY |
2019 |
2019 |
0 |
DESIGN
SITE SUPERVISION |
M/S LINDENBERG WATER & DRAINAGE |
United Arab Emirates UAE |
|
CONSULTANCY SERVICES FOR DESIGN AND SUPERVISION OF INSTALLATION OF THIRD 500MVA TRANSFORMER AT AIRPORT HEIGHTS AND NEW 132KV UG CABLE CKT BETWEEN AIRPORT HEIGHTS GS AND GHALA GS. |
CONSULTANCY SERVICES FOR
DESIGN AND SUPERVISION OF
INSTALLATION OF THIRD 500MVA
TRANSFORMER AT AIRPORT
HEIGHTS AND NEW 132KV UG
CABLE CKT BETWEEN AIRPORT
HEIGHTS GS AND GHALA GS. |
2019 |
2023 |
15 |
DESIGN REPORT – DRAWINGS -
PRICE LIST – B.O.Q -
ENGINEERING WORKS – SITE
SUPERVISION |
OMAN ELECTRICITY TRANSMISSION CO. |
Sultanate Of Oman |
|
CONSULTANCY SERVICES FOR SAIH AL KHAIRAT GS ALONG WITH OVERHEAD LINE FROM THUMRAIT GS TO SAIH AL KHAIRAT |
125MVA, 132/33KV GRID STATION
ALONG WITH OHTL. |
2019 |
2022 |
7 |
DESIGN - TENDERING
EVALUATION REPORT - DESIGN
REVIEW - CONSTRUCTION
SUPERVISION - GUARANTEE
PERIOD |
OMAN ELECTRICITY TRANSMISSION CO. |
Sultanate Of Oman |
|
SUPPLY, INSTALLATION, MAINTENANCE AND GUARANTEE FOR SMART PREPAID METERS, BILLING AND MANAGEMENT SYSTEM. |
STATE OF ART TECHNOLOGIES,APPLICATION AND SOLUTIONS FOR THE DESIGN, SUPPLY,
INSTALLATION, ALL WIRING AND
CABLE CONNECTIONS, TESTING, COMMUNICATION AND WARRANTEE OF A COMPLETE OPEN ADVANCE METERING
INFRASTRUCTURE (AMI), MANAGEMENT AND BILLING SYSTEM FOR MADINATY SMART
METERING NETWORK INCLUDING
PREPAID ELECTRIC AND WATER METERS.
THE AMI, MANAGING AND BILLING
SYSTEMS SHALL BE AN OPEN SYSTEM TO INTEGRATE WITH DIFFERENT TYPES OF STANDARD PREPAID METERS, USING
STANDARD PROTOCOL TO COMMUNICATE ACCURATELY WITH BILLING AND VENDING SYSTEM EQUIPMENT. |
2019 |
2021 |
70 |
GENERAL MANAGEMENT OF THE PROJECT DURING THE CONTRACT PERIOD INCLUDING THE GUARANTEE PERIOD FOR TWO YEARS.
- REVIEW OF THE DETAILED
DESIGN DRAWINGS AND
SPECIFICATIONS SUBMITTED BY CONTRACTOR (ELSWEDY
INTELLIGENCE) VIA MEPC.
- REVIEW THE TIME SCHEDULE OF PROJECT TO MATCH WITH CONTRACT PERIOD (SUPPLY, INSTALLATION, MAINTENANCE AND GUARANTEE).
- FOLLOW UP THE INSTALLATION, TESTING, COMMISSIONING AND
GUARANTEE OF SMART
NETWORK FOR BILLING AND
MANAGING SYSTEM BY THE
FOLLOWING METHODS.
- SITE SUPERVISION BY ONE OF OUR QUALIFIED ENGINEERS FOR INSTALLATION, TESTING AND COMMISSIONING OF MAIN CONTROL MANAGEMENT AND BILLING SYSTEM SUBJECT TO CONTRACTOR TIME SCHEDULE.
- SUITABLE NUMBER OF VISITS TO FOLLOW UP INSTALLATION,
CONNECTION OF SMART METERS WITHIN THE
TELECOMMUNICATION NETWORK
SUBJECT TO CONTRACTOR TIME SCHEDULE.
- EXPERT IN
TELECOMMUNICATION NETWORK FOR ONE VISIT PER MONTH TO
EVALUATE AND FOLLOW Up THE INTEGRATION WITH THE EXISTING PREPAID METERS AND NEW MANAGEMENT AND BILLING SYSTEM SUBJECT TO CONTRACTOR TIME SCHEDULE.
- PREPARING A MONTHLY
REPORT TO MEPC REGARDING
PROGRESS OF ACTIVITIES IN ACCORDANCE OF APPROVED TIME SCHEDULE AND ACTUAL PROGRESS OF WORKS
- CHECKING AND REVIEWING OF CONTRACTOR HANDING OVER CERTIFICATE (H.O.C) AND GUARANTEE PERIOD FOR TWO YEARS.
- CHECKING, REVIEWING AND SIGNING CONTRACTOR INVOICES SUBJECT TO ACTUAL PROGRESS
AS PER APPROVED TIME
SCHEDULE |
MADINATY ELECTROMECHANICAL POWER COMPANY (MEPC) |
Egypt |
|
NEW ASSUIT COMBINED CYCLE ENGINEERING WORKS FOR WASTE WATER DISCHARGE |
ENGINEERING WORKS FOR
WASTEWATER DISCHARGE
INCLUDING BLOWDOWN PUMPS/
PIPING RO PROJECTS, BRINE
PIPING DEEP WELL PUMPS,
RECHARGE, PUMPS, PROTECTION
WORKS AND CIVIL ENGINEERING
PIPING WORKS |
2019 |
2020 |
1500 |
1-DATA VERIFICATION AND
REVIEW
2-DEVIEW OF PUMPS/ PIPING
WITH CALCULATION OF THE
HYDRAULIC GRADIENT AND
RECOMMENDATION
3-DESIGN OF PUMPS CONCRETE
PEDESTAL AND STEEL
BASEPLATE & ANCHORING BOLTS.
4-ENGINEERING OF I&C WORKS
INCLUDING P&ID REQUIRED FOR
WASTE WATER AND DEEP WELL
DISCHARGE TO MIXING POND,
MIXED WASTEWATER TO
RECHARGING WELLS AND THEIR
CORRESPODING CONTROL |
ORASCOM CONSTRUCTION INDUSTRIALS |
Egypt |
|
MADINATY STUDY AND RECOMMENDATION OF BEST PRACTICAL SOLUTION FOR THE EXISTING ROUTER |
REVIEW THE LOCATIONS OF
ANTENNAE FOR REPAIR AND
UPGRADE OF THE EXISTING
SOFTWARE AND REGARDING V1
TO IMPROVE THE COMMUNICATION
WITH THE MAIN SERVER IN
MADINATY BY USING “SUPERCOM “
OR UPGRADING EXISTING
SOFTWARE |
2019 |
2020 |
0 |
REVIEW OF DESIGN ,
EVALUATION |
TALAAT MOUSTAFA GROUP (TMG ) |
Egypt |
|
CONSULTANCY SERVICES FOR 11 KV LOAD TRANSFER TO NEW EXTENSION AT EB11 PRY1 IN BANIYAS ER – CONTRACT NO. D-108373 |
CABLING WORKS ONLY I.E.
LAYING OF NEW 11 KV CABLES |
2019 |
2022 |
0 |
PDR – DDR – PREPARATION OF
TENDER DOCUMENTS AND
EVALUATION
-SITE SUPERVISION DURING
CONSTRUCTION PERIOD
-SITE SUPERVISION DURING
WARRANTY PERIOD |
ABU DHABI DISTRIBUTION COMPANY |
United Arab Emirates UAE |
|