Concrete Testing and Structural Integrity to Mv&Lv Switchgear Room Building at Elsokhna Power Plant |
Suez Golf Power Plant at Km 52 Suez City Ain Soukhna Structural Integrity Report |
2015 |
2015 |
0.3 |
Soil Investigation, Structural Integrity Report |
Powertek Energy SDN BHD |
Egypt |
No Image
|
Consultancy Services for Supervision of Construction of Sea Water Pipeline Construction from Phase 3/Phase 1 Diversion Point and Extend Towards Phase 2 Settling Basin |
Consultancy Services for Supervision of Construction of Sea Water Pipeline Construction from Phase 3/Phase 1 Diversion Point and Extend Towards Phase 2 Settling Basin |
2013 |
2015 |
0 |
Site Supervision, Inspection and Site Visits |
Ghubrah Power & Desalination Company SAOC |
Sultanate Of Oman |
No Image
|
Construction Services For Phase III Seawater Intake Culvert Concrete Slab Repair And Impressed Current Cathodic Protection System Inspection And Recommendation In Al Ghubrah Plant |
Checking And Recommendation, Preparation Of Necessary Scope Of Work For Repair, Commercial & Technical Evaluation Of Offers Received From The Contractors, Inspection The Impressed Current Cathodic Protection Supervision Of Project Execution And Submission Of Work Completion Report |
2013 |
2015 |
0.5 |
Collect Of Data, Studying, Preparing The Tender Document, Technical & Commercial Evaluation And Site Supervision
|
Al Ghubrah Power & Desalination Co. GPDCO |
Sultanate Of Oman |
No Image
|
Wastewater Tratments Plant in Madinaty |
Sewage Water Treatment Plant with Capacity 160,000 M3/day in two phases & Reuse for Irrigation, Biogas & Power Production, Mixing with Solid waste for Sludge treatment for fertilizers in 2/3 phases. |
2011 |
2015 |
80 |
Technical & Financial Evaluation of the Process and all components, Review of the preliminary hydraulic Calculation, prequalification of bidders, O&M Offer Review, Evaluation Report. |
Arab Company for Projects and Urban Development |
Egypt |
|
Construction of new seawater intake systems at masirah and duqm desalination plants |
construction earth bridge from the shore to the pump station platform, platform including shed and 5 tons monorail, construction pipeline, fence area, foundation and other civil works
|
2013 |
2015 |
8 |
Study Report, Concept Design, Tender Document, Bid Evaluation , Assistance to Prepare Contract, Construction Management & Supervision, Guarantee Supervision
|
Rural Areas Electricity Co. |
Sultanate Of Oman |
No Image
|
Consultancy Services For Design And Tendering Services For Load Shifting To Mobellah Grid Station – B |
Design, prepare tender documents and drawing for 33KV cable feeders and necessary 33kv SF6 breakers for utilizing the existing 33kv cables, etc to shifting the load to New Mobellah Grid Station.
|
2015 |
2015 |
0.2 |
Site Survey,Technical Report,Tender Document,Bid Evaluation |
MUSCAT ELECTRICITY DISTRIBUTION COMPANY |
Sultanate Of Oman |
No Image
|
Consultancy Services For Design And Tendering Services For Load Shifting To Ghala Grid Station |
Design, Prepare Tender Documents And Drawing For 33kv Cable Feeders And Necessary 33kv Sf6 Breakers For Utilizing The Existing 33kv Cables To Shift The Existing 33kv Load From The Bausher And Airport Heights Grid Station To The Newly Proposed Ghala Grid Station
|
2015 |
2015 |
0.2 |
Site Survey,Technical Report,Tender Document,Bid Evaluation |
MUSCAT ELECTRICITY DISTRIBUTION COMPANY |
Sultanate Of Oman |
No Image
|
Ltra- Framework Consultancy Services For Improvement / Reinforcement, Extension And Development Of Water Distribution Networks In Western Region, Abu Dhabi |
Framework Consultancy Services For Improvement/Reinforcement, Extension And Development Of Water Distribution Networks In Western Region, Abu Dhabi |
2010 |
2016 |
60.1 |
Master Plan,Review Of Current Specification,Site Survey,Topographical Survey ,Soil Investigation,Study Report,Basic Design,Detailed Design,Tender Document,Bid Evaluation,Construction Management & Supervision,Guarantee Supervision |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
|
Ben Ban Electrical Transmission (Solar Project) |
Transmission of The Solar Electric Power from The Solar Plots (39 Plots with Total Power of 1850 Mw) At Benban Area – Aswan – Upper Egypt Electricity Area to Their Located Step Up Substations (4 Nos) 22/22/220 Kv to Be Connected to The National Grid (220 Kv Level) At The Same Area. By Using Underground Cables, 18/30 Xpls Inside Trenches from The Solar Plots to The (4 Nos) Substations. |
2016 |
2016 |
181 |
Technical Study for The Suitable Cross Section of Underground Cables to Be Used for Transmitting Generated Power (About 1850 Mw) Laid in Trenches with Size and Type Suitable for Power to Be Transmitted, Conceptual & Detailed Mv Cables/ Fo Cables Routing Layout from Each Solar Plot Up to The 22/22/220 Kv Step-Up Hv Substation, Coordinating with The Civil Engineering Works. |
EGEMAC - Egyptian German Electricity Manufacturing Company |
Egypt |
|
Ben Ban Ohtl (Solar Project) |
Transmission of The Solar Electric Power from The Solar Plots (39 Plots with Total Power of 1850 Mw) At Benban Area – Aswan – Upper Egypt Electricity Area to Their Located Step Up Substations (4 Nos) 22/22/220 Kv to Be Connected to The National Grid (220 Kv Level) At The Same Area. By Using Ohtl Instead of Cable Connection. |
2016 |
2016 |
23 |
PRELIMINARY EVALUATION OF OVERHEAD LINE POLES REQUIRED FROM PLOTS TO THE SUBSTATIONS,DETAILED DESIGN FOR CIVIL WORKS AND POLES , PLANNING , FORECAST |
EGEMAC - Egyptian German Electricity Manufacturing Company |
Egypt |
|