Madinaty Irrigation Networks |
Automatic Irrigation Networks for different areas in Madinaty |
2010 |
2010 |
0.2 |
Technical & Financial Evaluation |
Arab Company for Projects and Urban Development |
Egypt |
|
Manazel : Al Reef Down Town Infrastructure |
Corridors / Reservations for Down Town Infrastructure Package for Water & Fire Fighting, Sewage, Storm Water, Electrical, Telecom, Roads and Irrigation Networks and Traffic Management Study & Parking Requirments for Roads Networks
|
2009 |
2011 |
50 |
Master Plan, Study Report, Concept Design, Detailed Design
|
Al Nasr Company |
United Arab Emirates UAE |
|
Manazel : 33/11kv S/S with associated 33 kv XLPE Cables for Power Supply to Al Reef Villas(M-022) |
Supply and Installation of a New 33/11 KV Substation and Installation of four circuit 33 KV, 3C x 300 mm2 Underground Cables from Shamkha 220/33 KV Grid Station to the new 33/11 KV Substation in Al Reef Villas Area.
|
2008 |
2011 |
45 |
Concept Design, Tender Document, Bid Evaluation, Assistance to Prepare Contract, Construction Management & Supervision, Design Review, Commissioning, Guarantee Supervision
|
Manazel Real Estate,MRE |
United Arab Emirates UAE |
|
Manazel : Infrastructure of Al Reef Villas Project and Downtown |
Infrastructure Development in Abu Dhabi Consisting of about 2400 villas and 200 multi storey building which include: Roads, Water Supply & Fire Fighting System Network, Sewage Network, Storm Water Network, Electrical Street Lighting Works, Telecom Works, Mechanical Works and Pumping Stations, Including all Civil Works for infrastructure, Interface with other Utilities, District Cooling Network
|
2008 |
2011 |
150 |
Updating Master Plan & Plot Parcalization, Review Design of Infrastructure, Review of Construction Shop Drawings, Construction Supervision
|
Manazel Real Estate,MRE |
United Arab Emirates UAE |
|
Upgrading of Mirfa-Madinat Zayed-Mazairah and Liwa Area, Water Transmission Scheme |
The transmission pipe line scope of work comprises construction of main transmissions for new DN 800mm CS (62.0km) from Mirfa Pump Station to Madinat Zayed Pump Station,Construction of new pump station at Mirfa (Lot c) which shall feed the new CS DN 800mm transmission pipeline total capacity 19.09 MIGD & total head 390m,Construction of new distribution pump station at Madinat Zayed which feed the existing DN 900mm to Madinat Zayed, Madinat Mohamed and new housing development total capacity 11.7. MIGD & total head 45m, Construction of four (4) concrete reservoirs at Madiant Zayed Pump Station with a capacity of 1.5MIG each complete with all incoming and outgoing pipe work, balance line, over flow, drains valves, fitting
|
2004 |
2011 |
75 |
Investigation, concept and detailed design, all surveys, tendering, site supervision and warranty follow up
|
TRANSCO |
United Arab Emirates UAE |
|
Design and Supervision of Desalination Plant at Al Awaifiya in Wilayat Bahla |
RO DESALINATION PLANT OF 200M3/DAY, Wells, Pretreatment, RO System, Post treatment, Product Water Tank, Civil works, Electrical and I&C System. |
2008 |
2011 |
1.8 |
Study and Design, Tender Document, Bid Evaluation, Assistance to Prepare Contract, Design Review, Construction Supervision, Commissioning, Guarantee Services |
Public Authority for Electricity and Water |
Sultanate Of Oman |
|
Extension Of RO Plant In Qarn Alam |
RO Plant Of 100m3/D With Its Auxiliaries: Drilling Of 2 Bore Wells Pretreatment Facilities, RO Unit With Pressure Exchanger Post Treatment Facilities, PW Tanks, Electrical Supply, Motors, Cables Automatic Control System & Civil Works. |
2008 |
2011 |
1 |
Design Tender Document Evaluation, Site Supervision And Guarantee |
Public Authority for Electricity and Water |
Sultanate Of Oman |
|
Design & Supervision Services for Extension of Desalination Plant of 2000 m3/d in Wilayat Diba |
Design & Supervision Services for RO Desalination Plant capacity of 2000 m3/day including: - RO Desalination plant equipment, pumps, pressure exchanges, piping, pre and post treatment - Four wells complete with piping - Concrete tanks of 2000 m3 - Electrical and automatic control works - RO building, Infrastructure, Foundation, accomodation and fence |
2008 |
2011 |
3.4 |
Design report, Tender Document, Bid Evaluation , Construction Supervision, Design Review, PAC, Guarantee and FAC |
Public Authority for Electricity and Water |
Sultanate Of Oman |
|
Design & Supervision Services for Extension of Existing Desalination Plants in Sail & Ramla and Hitam in Al Wusta Region |
Design & Supervision Services for RO Desalination plants of 200 m3/d at Hitam and 300 m3/d at Sail with pretreatment system, RO System, Post Treatment System, Product water tank, Civil works, Electrical and I&C Systems. |
2008 |
2011 |
3.8 |
Design Stage, Tender Document, Bid Evaluation, Construction Supervision and Guarantee Period |
Public Authority for Electricity and Water |
Sultanate Of Oman |
|
Design & Supervision Services for Construction of Desalination Plant phase I in Wilayat Bukha |
Seawater RO Desalination Plant Two Streams each 500 m3/D Containerized Type including civil works such steel structure sun shed for "filters, wash pumps & feed pumps, size "20m x 8m x 9m", product water tank (1000m3), on Hill water tank (1000m3), raw water tank (200m3), switch gear building (23m x 26m), workship building, (8.5m x 8.8m), generator room (6m x 9m), pump house (6m x 9.5m), feed/ product & brine water networks, fencing, guard house (4.6m x 4m), internal & external paved road (l=6m*w=6m), car parking shed (8 Nos.)
|
2008 |
2011 |
5 |
Design Report, Tender Document, Evaluation Report, Contract Document, Site Supervision
|
Ministry Of Housing Electricity And Water MHEW |
Sultanate Of Oman |
No Image
|
Number of projects: 279
|
|
|
|