Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Consultant Services for Design Review and Site Supervision for Rehabilitation of Steam Generator of Assiut “I” Power Station – Walidia – Assiut – Egypt |
Review of Rehabilitation Details in Line with The Scope Provided in The Contract as Well as Site Supervision of the Works Already Defined (Implementation Stage). |
2013 |
2015 |
35 |
Design Review, Construction Management & Supervision |
UEEPCO-Upper Egypt Electricity Production Company |
Egypt |
|
Economical Study for Installing a New Natural Gas Fired Engine in Sadat City in Egypt |
Economical Analysis Is to Compare Cost of Electricity Purchased Over Two Years to Gas Engine Capital Cost and Operating Costs for The Same Period |
2015 |
2015 |
32 |
Study Report, Feasibility Study |
Uniboard Al Mohtaheda Paper & Board |
Egypt |
|
Consultancy Services for Relocation of Transco Water Transmission at SHM-6 |
Relocation of Transco Water Transmission at SHM-6 |
2014 |
2015 |
19.4 |
Hydraulic Studies (Steady State, Un-Steady State), Hydraulic Model |
Dongmyeong Engineering Consultants |
United Arab Emirates UAE |
|
Engineering of Power Generation and Distribution System at Norpetco Field |
Upgrading of Electrical Power Supply to Achieve a More Reliable and Sustainable Service by Dividing Scope of Work into Six Clusters Headed as Abrar, Abrar South, Ferdaus, Ganna, Sidra and Rawda |
2013 |
2015 |
10 |
Feasibility Study, Study Report, Tender Document, Detailed Design, Master Plan, Planning, Forecast |
NORPETCO - North Baharya Petroleum Company |
Egypt |
|
Consultancy Services for Design Stability of Piping System in Pump Room - The Development of South Shamkha Infrastructure, Lot-1 (Cont No. 2011/61) - Pipe Stress Analysis |
Design Stability of Piping System in Pump Room - The Development Of South Shamkha Infrastructure, Lot-1 - Pipe Stress Analysis |
2014 |
2015 |
0 |
Hydraulic Studies (Steady State, Un-Steady State), Hydraulic Model, Detailed Design |
Federal Electricity & Water Authority FEWA |
United Arab Emirates UAE |
No Image
|
Seawater Intake Culvert Concrete Slab Repair and Impressed Cathodic Protection System Inspection and Recommendation in Al Ghubrah Plant |
Concrete Structures in Many of the Power and Desalination Plants Had Suffered Disintegration of Its Concrete Surface, Deterioration of Concrete, Rusting of Reinforcement and Crack Along and Across the Reinforcement |
2013 |
2015 |
2 |
Study Report, Prequalification of Contractors, Tender Document, Bid Evaluation, Assistance to Prepare Contract, Construction Management & Supervision, Planning, Forecast |
Al Ghubrah Power & Desalination Co |
Sultanate Of Oman |
No Image
|
Design of Training Center and Mosque at P&G s New Plant |
Prepare and Carrying Out the Construction Design Package Design Calculation, Detailed Drawings, Bill of Quantities and Specifications For The Landscaping and Layout of the External Works and All Architectural Design |
2014 |
2015 |
1.2 |
Detailed Design, Topographical Survey |
PROCTER and GAMBLE |
Egypt |
No Image
|
Calculations of Energy Cost Saving by Using Led Lighting |
ETG Company – Represented by Eng. Islam Gabr – Offered The Calculation of Energy Cost Saving by Replacing the Traditional Lighting by Led Lighting |
2015 |
2015 |
1 |
Revise The Calculations Made by Etg for Saving of Electrical Energy by Using Led Lighting the Financial Include Fixer Cost of Aperatnity |
Arab Company for Projects and Urban Development |
Egypt |
No Image
|
Transmission Pipeline Within City and Industrial Area – Ajman |
Transmission Pipeline Within City and Industrial Area – Ajman |
2014 |
2015 |
0.5 |
Hydraulic Studies (Steady State, Un-Steady State), Hydraulic Model |
Federal Electricity & Water Authority FEWA |
United Arab Emirates UAE |
No Image
|
Technical Evaluation Report About Advanced Meter Infrastructure (Ami) For Madinaty Project. |
Review The Technical Submission of Supplier (Golden Power & Having Co.) And Evaluation the Preliminary Offer Against International Standard. |
2014 |
2015 |
0.5 |
Evaluation Report, Data Collection, Review of Current Specification |
Madinaty Electromechanical Power Company (MEPC) |
Egypt |
No Image
|
Number of projects: 279
|