Projects
Type:
Project Status:
Project Details:
Type Detail:
Project Name Description
Start Year
Finish year
Cost X106
Services Provided Client Country Image
Consultancy Services for Replacement of Existing Water Distribution Network in Abu Dhabi Island for Sectors E9_02, E10, E13 & W14_02 Consultancy Services for Replacement of Existing Water Distribution Network in Abu Dhabi Island for Sectors E9_02, E10, E13 & W14_02. The Anticipated Quantity of Pipelines to Be Replaced Is Approximately 39km with All Associated Civil Works 2013 2018 16 Study Report, Site Survey, Design Report, Tender Document, Bid Evaluation, Evaluation Report, Site Supervision Abu Dhabi Distribution Company United Arab Emirates UAE
Smart Water Network for Madinaty Project Phase I: Data Transfer To Consortium To Prepare The Hydraulic Study For All Madinaty Phases . -Detailed Engineering Of The System Including Scada System For Automatic Control, Prepare BOQ Of Main Equipment Phase Ii : Preparing Planning Program Of Installation Of Equipment, Follow Up Installation, Testing, Of All Equipment Till Taking Over The Project. 2015 2018 14 Data Collection, Hydraulic Studies (Steady State, Un-Steady State), Review Of Current Specification, Site Supervision, Testing, Commissioning Till The Taking Over Of Project, Engineering By Consortium, Review Of BOQ, Arab Company for Projects and Urban Development Egypt
Updating and Standardizing the Requirements for Smart Network and Metering System The Scope Include the Following -Smart Electric Meters Single 3 Phases -Commutation Networks Complete Between Smart Meters and Scada System -Complete Billing System and Remote Control of All Meters Via Gprs/ Rf / Fo Netw -K -Remote Control of Meter Tarff: Monitoring All Mv/Lv/ Network in Scada System -Street Lighting (Option) Small Networks Using Le -Operation and Maintenance for Two Years. 2016 2018 5 Data Collection, Tender Document, Prequalification Of Contractors, Analyzing Received Evaluation, Preparing Technical And Financial Reports Including Recommendation, Still Contractor Is Not Selected By MEPC Madinaty Electromechanical Power Company (MEPC) Egypt
Zohr Development Project Supervision and Coordination Site Staff 2018 2018 2 Commissioning, Evaluation Report, Technical Report, Inspection And Site Visits ,Analyzing Received Evaluation ,Preparing Technical And Financial Reports Including Recommendation ,Check Compliance With Egyptian Standard ,Check The Function To Monitor And Control If Consumption ,Testing, Commissioning Till The Taking Over Of Project ,Review Technical Data Sheet, Checking Availability To Integrate With Exiting Meters ,Preparing Recommendation Report. SAPESCO Egypt No Image
Additional RO Unit Utilizing the Brine of the Existing Plant in Madinaty Technical Study Report for Brine of Ro Plant In Madinaty 2016 2018 2 Study Report Arab Company for Projects and Urban Development Egypt No Image
Zohr Development Project Steam Blowing Scope Of Zohr Development Project Is Gas Producing Plant, Including Review Of Subcontractor Preparation Submittals Ready For Contract Time Schedule, Technical Drawing, Calculation Of Different Lengths And Pipes And Review Pipes Support, Review Of Design Work, Site Supervision And Review Subcontractor During Execution Of Steam Blowing At Site 2018 2018 2 Technical Report, Tender Document, Bid Evaluation, Prequalification Of Contractors, Assistance To Prepare Contract, Construction Management & Supervision, Design Review, Design Report, Advisory Activity, Attending Manufactures Tests, Basic Design, Commissioning, Guarantee Supervision, Evaluation Report, Site Supervision SAPESCO Egypt No Image
Technical Evaluation of Al Yosr Plant and Preparing Tender for Operation and Maintenance Preparing Technical Evaluation Report Including Intake and A Tender for Operation and Maintenance Including Budget Evaluation 2018 2018 1 Site Visit, Technical Evaluation, Operation and Maintenance Tender, Budget Cost Estimation for One Year Including Study Submitted Offers by Contractors, Preparing Technical Evaluation Report Including Scoring for Technical Evaluation, Draft Recommendation to Owner, Financial Study Report, Preparing Final Recommendation Report National Organization for Potable Water and Sanitary Drainage(NOPWASD) Egypt No Image
ANRPC Steam Blowing Scope New Ccr & Platforming Unit Block A&B Refine Naptha And Jet Fuel . Phase 1 Including Review of Subcontractor Preparation Submittals Ready for Contract Time Schedule, Technical Drawing, Calculation of Different Lengths and Pipes Support, Review of Design Work. Phase2 Site Supervision and Review Subcontractor During Execution of Steam Blowing at Site. 2017 2018 0.2 Project Management, Study Report, Concept Design, Prequalification Of Contractors, Review Of Current Specification, Tender Document, Bid Evaluation, Assistance To Prepare Contract, Construction Management & Supervision, Design Review, Attending Manufactures Tests, Commissioning, Guarantee Supervision, Basic Design, Evaluation Report, Technical Report SAPESCO Egypt No Image
DESIGN CONSULTANCY SERVICES FOR DESIGN AND SUPERVISION OF PERMANENT 22 KV FEEDING ARRANGEMENT FOR WEST YAS D- ESIGN REVIEW FOR CABLING WORKS I.E. LAYING OF 22 KV CABLES. 2019 2019 0 - Design Review - Site Supervision SWITCHGEAR ELECTROMECHANICAL United Arab Emirates UAE
INSTALLATION OF 800 MM DIA DI PIPE – DESIGN OF LINE ANCHOR SUPPORTS ELOCATION OF TRANSCO DN 800 MM AND STRUCTURAL DESIGN 2019 2019 0 ENGINEERING WORK FOR RELOCATION OF TRANSCO WATER DN MM WATER LINE SAABA CORPORATION F.Z.E United Arab Emirates UAE No Image
Number of projects: 279
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved