Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
water distribution networks for 200MM CS Jabel Hafeet Pipeline |
Laying Approximately 10.5 Km Of 1xdn 200mm Cs Grade 60 Transmission Pipeline Including Surge Analysis Study Of The Pumping Systems From Jabel Hafeet Base Pumping Station To Summit Pumping Station, Laying Suitably Sized, Secured Supply Pipeline Around 3 Km Of 150mm Cs From Summit Reservoir To Feed The Hh Presidents Palace With Provision For Hotel And Cafeteria And Future Tap-Off, Laying Of Fiber Optic Cable Between Base And Summit Pumping Station. |
2009 |
2016 |
25 |
Project Management, Concept Design, Detailed Design, Tender Document, Bid Evaluation, Assistance to Prepare Contract, Construction Management & Supervision |
Abu Dhabi Water & Electricity Department ADWEA |
United Arab Emirates UAE |
No Image
|
Construction of Desalination Plant of 10000 M3/D in Madinaty |
Extension To P No. 24089 Well Water Reverse Osmosis Plant Of Capacity 10,000m3/D Plant, Single Pass And Three Trains And Recovery Ratio Of 70%, Pretreatment System Suitable For Bore Well Plant Including 5 Multi Media Filters (Mmf),Post Treatment System To Permeate, Concrete Product Water Tank With 5000m3 Capacity Concrete Raw Water Tank Of 1200m3 Capacity (Optional) |
2012 |
2016 |
9 |
Construction Management & Supervision, Bid Evaluation, Detailed Design, Project Management |
Arab Company for Projects and Urban Development |
Egypt |
No Image
|
Consultancy Services For Water Supply To Different Locations In Madinat Zayed, Ghayathi And Delma Island, Under Ltra Frameworks Consultancy Contract No. D-10503/A-6 |
Water Supply to Different Locations in Madinat Zayed, Ghayathi and Delma Island |
2012 |
2016 |
6.6 |
Preliminary and Detailed Design, Tendering Services, Site Supervision, Guarantee Supervision |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
No Image
|
Reinforcement Of Wadi Al Ayn Well Production Capacity In Adh Dhahira Governorate |
Design Review And Supervision For 14 Nos. Of Water Wells With Pipelines Network Length 9.9km And Pipeline Size Range Between 150mm-600mm Diameter Class 40 Ductile Iron. |
2014 |
2016 |
6.6 |
Construction Management & Supervision, Design Review |
Public Authority for Electricity and Water PAEW |
Sultanate Of Oman |
No Image
|
New tankers STP at Al-Misfah (Haya) |
Design Consultant For Civil And Structural Works Including (Preliminary Drawings, Details, Specs & Complete Design Calculations, Drawings, Schedules And Specs For Construction Purpose) For The New Tankers Stp At Misfah (Wilayat Bausher)In Both (Pre-Bid & Post Award) Stages |
2015 |
2016 |
3.2 |
Basic Design, Technical Report, Detailed Design |
Bahwan Engineering Co. |
Sultanate Of Oman |
No Image
|
Drilling Water Wells In Al Ain And Western Region Areas And Installation Of Casting And Screen To The Full Completion Depth In Al Ain Area |
Drilling 135 Water Wells In Al Ain Area And 280 Water Wells In Western Region And Installation Of Casing And Screen To The Full Completion Depth In Al Ain Area |
2014 |
2016 |
3 |
Detailed Design, Construction Management & Supervision |
Abu Dhabi Food Control Authority |
United Arab Emirates UAE |
No Image
|
Consultancy Service For Water Supply to Danat Jebel Dhanna Resort & Surrounding. LTRA Framework Consultancy Contract NO. D-10503/A-7 |
Water Supply To Danat Jebel Dhanna Resort & Surrounding |
2015 |
2016 |
2.4 |
Construction Management & Supervision |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
No Image
|
New Study By Nour Consult For New Led Types To Save Energy Cost |
Nour Consult Presented New Types Of Led Bulbs With New Prices To Calculate The Saving Of The Energy Costs – Cec Studied And Gave Recommendations |
2015 |
2016 |
1 |
Bid Evaluation, Final Recommendation, Study For Energy Saving |
Arab Company for Projects and Urban Development |
Egypt |
No Image
|
Prepaid Gprs Controlled Irrigation Meter Dn 100 |
-Review of Prepaid Irrigation Meter.
-Issue Comments About the Submitted Offer.
-Giving Recommendation to Tmg
|
2016 |
2016 |
0.45 |
Check Compliance With Egyptian Standard, Checking Availability To Integrate With Exiting Meters, Review Of Current Specification, Preparing Recommendation Report., Bid Evaluation |
Arab Company for Projects and Urban Development |
Egypt |
No Image
|
Repair - Treatment of Cracked Concrete Structure At Sgp Plant |
Supervision Of The Concrete Repair Works To The Cracked Concrete Structures At Suez Gulf Power Plant At Sukhna-Suez |
2016 |
2016 |
0.4 |
Bid Evaluation, Site Supervision |
Powertek Energy SDN BHD |
Egypt |
No Image
|
Number of projects: 279
|